Security Baseline Inspection Report 05000266/2020401 and 05000301/2020401
ML20091F722
Person / Time
Site: Point Beach  
Issue date: 03/30/2020
From: Steven Orth
NRC/RGN-III
To: Craven R
Point Beach
References
IR 2020401
Download: ML20091F722 (7)


Text

March 30, 2020

SUBJECT:

POINT BEACH NUCLEAR PLANT - SECURITY BASELINE INSPECTION REPORT 05000266/2020401 AND 05000301/2020401

Dear Mr. Craven:

On March 6, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant and discussed the results of this inspection with Mr. Woyak and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000266 and 05000301

License Numbers:

DPR-24 and DPR-27

Report Numbers:

05000266/2020401 and 05000301/2020401

Enterprise Identifier: I-2020-401-0067

Licensee:

NextEra Energy Point Beach, LLC

Facility:

Point Beach Nuclear Plant

Location:

Two Rivers, WI

Inspection Dates:

March 2, 2020 to March 6, 2020

Inspector:

M. Ziolkowski, Senior Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: 02.06 a, c, d; 02.08 d - g, i
  • Tier III: 02.09; 02.10

71130.14 - Review of Power Reactor Target Sets

Review of Power Reactor Target Sets (1 Sample)

(1) Requirements: 02.01; 02.02 a - e; 02.04 a;

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1)10/01/2019 - 12/31/2019

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On March 6, 2020, the inspectors presented the security baseline inspection results to Mr. Woyak and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Procedures

CS-091

Point Beach Nuclear Plant Key Control

CS-091d

Point Beach Nuclear Plant Sargent-Greenleaf Key and Lock

Issuance Log

PBSAP 3.5

Security System Card Reader and HGU Testing

PBSAP 6.1

Access Point Officer

PBSAP 6.3

Post 3 Gatehouse Officer

PBSAP 6.8

Dedicated Observer

SY-AA-102-1000

Safeguards Information Program

SY-AA-102-1020

Security Badge Control and Use

SY-AA-102-1021

Conduct of Personnel Searches

SY-AA-102-1022

Vehicle and Material Searches

SY-AA-102-1023

Visitor Access Control

SY-AA-102-1024

Escorting Vehicles and Material

SY-AA-102-1029

Controlling Gates and Vehicle Barriers

Self-Assessments

Nuclear Fleet Security Baseline Inspection Matrix: NRC

Inspection Procedure: 71130.02, Access Control

71130.14

Drawings

PB01

MWSK00000390

Service Water P&ID

2/18/1991

PB01

MWSK00001042

Service Water P&ID

2/02/1993

Miscellaneous

NextEra Energy Point Beach Nuclear Plant Units 1 & 2

Physical Security Plan

Procedures

Point Beach Nuclear Plant Units 1 & 2 Target Sets

09/03/2019

SY-AA-102-1036

Target Set Development, Identification and Maintenance

Work Orders

49641506-01

Security Annual Target Set Review

10/09/2019

71151

Procedures

CS-115

NRC Performance Indicator Data Sheet

SY-AA-102-1035

Security Performance Assessment Program

10