Forwards IE Insp Rept 50-301/81-08 on 810427-0501 & 04-08. No Noncompliance Noted
ML20004E537
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/29/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20004E538 List:
References
NUDOCS 8106120301
Download: ML20004E537 (2)


See also: IR 05000301/1981008

Text

Dm6

..

.

.

/

jo

UNITED STATES

NUCLEAR REGULATORY COMMISSION

y

,

g

.

e

REGION lil

Q,

,f

7se ROOSEVELT ROAD

g

/

GLEN ELLYN. ILLINOIS 80137

MAY 2 9 1981

. , f , gty ,

Docket No. 50-301

,

~. ,2 IS8 A 'n

Wisconsin Electric Power Company

9 % k fy g g

ATTN:

Mr. Sol Burstein

vs

/

Executive Vice President

f\\Qs

Power Plants

231 West Michigan

go . , 'p\\

\\

Milwaukee, WI 53201

"

Gentlemen:

This refers to the routine safety inspection conducted by Mr. M. A. Ring

of this office on April 27 - May 1 and May 4-8, 1981, of activities at

Point Beach, Unit 2, authorized by NRC Operating License No. DPR-27 and

to the discussion of our findings with Mr. G. A. Reed at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the h3C's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation.

Section 2.790(b)(1) requires that any such application must be

accompanied by an aff' !avit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

1

a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

'

\\

8.10 61 e o 3oh

Q

.

4

24

938

Wisconsin Electric Power

-2-

Company

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods

noted above, a copy of this letter and the enclosed inspection report

will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosure: IE Inspection Report

No. 50-301/81-08

cc w/ encl:

G. A. Reed, Manager

DNB/Eccument Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Inspector

Peter Anderson, Wisconsin's

Environmental Decade

Stanley York, Chairman

Public Service Commission

l

I

i

l

!

l

l

l

.

RIII

RI

RIII

RII[

RIII[}

i

'

-

,

-

ard

N2 &lfdI

Sp$3

Ring /db

in

ac tw

5/21/81

y

..

.

-