Text
Dm6
..
.
.
/
jo
UNITED STATES
NUCLEAR REGULATORY COMMISSION
y
,
g
.
e
REGION lil
Q,
,f
7se ROOSEVELT ROAD
g
/
GLEN ELLYN. ILLINOIS 80137
MAY 2 9 1981
. , f , gty ,
Docket No. 50-301
,
~. ,2 IS8 A 'n
Wisconsin Electric Power Company
9 % k fy g g
ATTN:
Mr. Sol Burstein
vs
/
Executive Vice President
f\\Qs
Power Plants
231 West Michigan
go . , 'p\\
\\
Milwaukee, WI 53201
"
Gentlemen:
This refers to the routine safety inspection conducted by Mr. M. A. Ring
of this office on April 27 - May 1 and May 4-8, 1981, of activities at
Point Beach, Unit 2, authorized by NRC Operating License No. DPR-27 and
to the discussion of our findings with Mr. G. A. Reed at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the h3C's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
mation.
Section 2.790(b)(1) requires that any such application must be
accompanied by an aff' !avit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
1
a full statement of the reasons on the basis which it is claimed that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
'
\\
8.10 61 e o 3oh
Q
.
4
24
938
Wisconsin Electric Power
-2-
Company
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods
noted above, a copy of this letter and the enclosed inspection report
will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
C. E. Norelius, Acting Director
Division of Engineering and
Technical Inspection
Enclosure: IE Inspection Report
No. 50-301/81-08
cc w/ encl:
G. A. Reed, Manager
DNB/Eccument Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Inspector
Peter Anderson, Wisconsin's
Environmental Decade
Stanley York, Chairman
Public Service Commission
l
I
i
l
!
l
l
l
.
RIII
RI
RIII
RII[
RIII[}
i
'
-
,
-
ard
N2 &lfdI
Sp$3
Ring /db
in
ac tw
5/21/81
y
..
.
-