IR 05000298/2025010

From kanterella
Jump to navigation Jump to search
Biennial Problem Identification and Resolution Inspection Report 05000298/2025010
ML25121A266
Person / Time
Site: Cooper 
Issue date: 05/06/2025
From: Ramirez-Munoz F
NRC/RGN-IV/DORS/PBC
To: Dia K
Nebraska Public Power District (NPPD)
References
IR 2025010
Download: ML25121A266 (1)


Text

May 06, 2025

SUBJECT:

COOPER NUCLEAR STATION - BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000298/2025010

Dear Khalil Dia:

On April 17, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed a problem identification and resolution inspection at your Cooper Nuclear Station and discussed the results of this inspection with John Dent, Executive Vice President and Chief Nuclear Officer, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspection team reviewed the stations problem identification and resolution program to confirm that the station was complying with NRC regulations and licensee standards. Based on the samples reviewed, the team determined that your program complies with NRC regulations and applicable industry standards such that the Reactor Oversight Process can continue to be implemented.

The team also evaluated the stations effectiveness in identifying, prioritizing, evaluating, and correcting problems, reviewed licensee audits and self-assessments, and its use of industry and NRC operating experience information. The results of these evaluations are in the enclosure.

Finally, the team reviewed the stations programs to establish and maintain a safety-conscious work environment and interviewed station personnel to evaluate the effectiveness of these programs. Based on the teams observations and the results of these interviews, the team found no evidence of challenges to your organizations safety-conscious work environment. Your employees appeared willing to raise nuclear safety concerns through at least one of the several means available.

No findings or violations of more than minor significance were identified during this inspection. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Frances C. Ramirez Munoz, Acting Team Lead Inspection Programs & Assessment Team Division of Operating Reactor Safety Docket No. 05000298 License No. DPR-46

Enclosure:

As stated

Inspection Report

Docket Number:

05000298

License Number:

DPR-46

Report Number:

05000298/2025010

Enterprise Identifier:

I-2025-010-0010

Licensee:

Nebraska Public Power District

Facility:

Cooper Nuclear Station

Location:

Brownville, NE

Inspection Dates:

March 30 to April 17, 2025

Inspectors:

G. Birkemeier, Resident Inspector

C. Henderson, Senior Resident Inspector

G. Pick, Senior Reactor Inspector

S. Thapa, Reactor Inspector

Approved By:

Frances C. Ramirez Munoz, Acting Team Lead

Inspection Programs & Assessment Team

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a biennial problem identification and resolution inspection at Cooper Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status LER 05000298/2024-003-01 High Pressure Coolant Injection Steam Leak Causes Condition that Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications 71153 Closed

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES - BASELINE

71152B - Problem Identification and Resolution Biennial Team Inspection (IP Section 03.04)

(1) The inspectors performed a biennial assessment of the effectiveness of the licensees Problem Identification and Resolution program, use of operating experience, self-assessments and audits, and safety-conscious work environment.
  • Problem Identification and Resolution Effectiveness: The inspectors assessed the effectiveness of the licensees Problem Identification and Resolution program in identifying, prioritizing, evaluating, and correcting problems. The inspectors also conducted a five-year review the high pressure coolant injection. The corrective actions for the following non-cited violations, minor violations, and findings were evaluated as part of the assessment, NCVs:

===2024401-02, 2024004-05, 2024004-04, 2024003-03, 2024003-02, 2024002 05, 2024002-04, 2024002-03, 2024002 02, 2024002-01, 2024001-03, 2024001-02, 2024001-01, 2023401-01, 2023010-01, 2023004-03, 2023004-02, 2023004 01, 2023002-02, and 2023002-01.

  • Operating Experience: The inspectors assessed the effectiveness of the licensees processes for use of operating experience.
  • Self-Assessments and Audits: The inspectors assessed the effectiveness of the licensees identification and correction of problems identified through audits and self-assessments.
  • Safety-Conscious Work Environment: The inspectors assessed the effectiveness of the stations programs to establish and maintain a safety-conscious work environment.

71153 - Follow Up of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)===

The inspectors evaluated the following licensee event reports (LERs):

(1) LER 2024-003-01, High Pressure Coolant Injection Steam Leak Causes Condition that Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications, (ADAMS Accession No. ML25051A147). The inspectors reviewed the updated LER submittal. The previous LER submittal was reviewed in Inspection Report 05000298/2024002 with an associated Green, non-cited violation, NCV 05000298/2024002-04, (ML24206A141). This LER is closed.

INSPECTION RESULTS

Assessment 71152B Corrective Action Program Assessment:

Based on the samples reviewed, the team determined that the licensees corrective action program complied with regulatory requirements and self-imposed standards. The licensees performance in each of the areas of problem identification, problem prioritization and evaluation, and corrective actions adequately supported nuclear safety.

Effectiveness of Problem Identification: Based on the samples reviewed, the team determined that the licensees performance in this area adequately supported nuclear safety. Overall, the team found that the licensee was identifying and documenting problems at an appropriately low threshold that supported nuclear safety.

Effectiveness of Prioritization and Evaluation of Issues: Overall, the team found that the licensee was appropriately prioritizing and evaluating issues to support nuclear safety. Of the samples reviewed, the team found that the licensee correctly characterized each condition report as to whether it represented a condition adverse to quality and then prioritized the evaluation and corrective actions in accordance with program guidance.

The inspectors identified two observations in the area associated with condition report classification and root cause evaluation:

  • Procedure 0-CNS-LI-102, Corrective Action Process, revision 18, attachment 1, Condition Report Classification Guidance, provides examples to assist with determining the level of consequence of conditions adverse to quality described in condition reports. One example of a High Consequence Issue is a condition causing an increase in core damage frequency = 1E-6/year or large early release frequency =

1E-7/year. However, the licensee lacks sufficient guidance to ensure probabilistic risk assessment insights are implemented in their condition report classification process.

The licensee entered this observation into their correction action program as Condition Report CR-CNS-2025-01974.

  • The root cause evaluation for the high pressure coolant injection through-wall steam leak documented in Condition Report CR-CNS-2024-00768 failed to address the condition of the steam traps internal valve, which may have contributed to steam leaking past the trap, which resulted in the liquid droplet impingement of the pipe wall.

Specifically, a work order associated with steam trap maintenance in 2012 identified the internal valve was steam cut away but fails to clarify whether personnel replaced the component. Documentation for the historical performance of the preventative maintenance lacked details about the condition of the steam trap valve. The evaluation does not provide sufficient detail to understand the state of the steam trap internal valve, the deficiencies' impact on steam trap performance, nor does any record of the noted deficiency exist in the corrective action program. The licensee was able to provide the inspectors information associated with work order classification that required personnel to replace the high pressure drain valve internals and provided the action to revise Procedure 7.2.62.2, Yarway Model 515 BSWR Steam Trap Maintenance, to add a step to initiate a condition report and verify discrepancies are resolved. The licensee entered this observation into their corrective action program as Condition Report CR-CNS-2025-01972.

Effectiveness of Corrective Actions: Overall, the team concluded that the licensee's corrective actions supported nuclear safety. Specifically, the Cooper Nuclear Station developed effective corrective actions for the problems evaluated in the corrective action program and generally implemented these corrective actions in a timely manner commensurate with their safety significance. As part of this inspection, the team selected the plants high pressure coolant injection system for a focused review within the corrective action program. For this system, the team performed sample selections of condition reports, looking at the adequacy of the licensee's evaluation process for determining which items are placed in the corrective action process, and the corrective actions taken. The team did not identify any concerns with these systems that were not already being addressed by the station's monitoring and corrective action programs.

Assessment 71152B Self-Assessment and Audits:

The team reviewed a sample of Cooper Nuclear Station departmental self-assessments to assess whether performance trends were regularly identified and effectively addressed. The team also reviewed audit reports to assess the effectiveness of assessments in specific areas. Overall, the team concluded that the licensee had an adequate departmental self-assessment and audit process.

Assessment 71152B Operating Experience:

The team reviewed a variety of sources of operating experience including 10 CFR Part 21 notifications and other vendor correspondence, NRC generic communications, and publications from various industry groups. The team determined that Cooper Nuclear Station staff is adequately screening and addressing issues identified through operational experience that apply to the station and that this information is evaluated in a timely manner once it is received.

Assessment 71152B Safety-Conscious Work Environment:

The team conducted safety-conscious work environment (SCWE) interviews with 44 employees from four different disciplines that included maintenance, engineering, operations, and security. The purpose of these interviews was

(1) to evaluate the willingness of the licensees staff to raise nuclear safety issues, either by initiating a condition report or by another method,
(2) to evaluate the perceived effectiveness of the corrective action program at resolving identified problems, and
(3) to evaluate the licensees SCWE. The team also observed interactions between employees during plant meetings. The team interviewed the Employee Concerns Program Manager and reviewed the results of the latest safety culture surveys and a sample of case files that may relate to SCWE.

The team found that the licensee had a SCWE where individuals felt free to raise concerns without fear of retaliation. Most expressed positive experiences after raising issues to their supervisors and after documenting issues in condition reports, and all individuals indicated that they would not hesitate to raise safety concerns, through at least one of the several means available at the station.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified that no proprietary information was retained or documented in this report.

  • On April 17, 2025, the inspectors presented the biennial problem identification and resolution inspection results to John Dent, Executive Vice President and Chief Nuclear Officer, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

NEDC 09-044

MOV Stroke Time Effects Due to Diesel Frequency Variation

NEDC 20-017

Diesel Generator Room Temperature with Failure of CO2

Pressure Relief Dampers

Calculations

NEDC 23-018

Operability Calculation for Effects of Open HV Hatch on DG

Room Temperature

Corrective Action

Documents

CR-CNS-20YY-

NNNNN

2019-01277, 2022-03653, 2022-05293, 2022-05294,

22-05296, 2022-03656, 2022-03654, 2023-00436,

23-00454, 2023-01170, 2023-02274, 2023-02322,

23-02947, 2023-03409, 2023-03439, 2023-03473,

23-03497, 2023-03525, 2023-04559, 2023-04428,

23-02880, 2023-02793, 2023-02792, 2023-02698,

23-04775, 2023-04584, 2023-05194, 2023-05285,

23-04627, 2023-03679, 2023-03794, 2023-04939,

23-05227, 2023-02280, 2023-02332, 2023-04770,

23-03688, 2023-01066, 2023-01057, 2023-01034,

23-04582, 2024-01216, 2024-01082, 2024-01817,

24-01832, 2024-04192, 2024-00260, 2024-05323,

24-01035, 2024-01822, 2024-00655, 2024-00050,

24-00085, 2024-00463, 2024-03670, 2024-05660,

24-00286, 2024-00482, 2024-00561, 2024-00756,

24-01098, 2024-01135, 2024-01232, 2024-02230,

24-02385, 2024-02828, 2024-02861, 2024-02858,

24-02859, 2024-02860, 2024-02862, 2024-02863,

24-02864, 2024-03492, 2024-00019, 2024-05524

Corrective Action

Documents

Resulting from

Inspection

CR-CNS-20YY-

NNNNN

25-01763, 2025-01771, 2025-01934, 2025-01971,

25-01972, 2025-01974, 2025-01975, 2025-01976,

25-01978

B&R 2020

Cooper Nuclear Station Flow Diagram Reactor Building

Heating and Ventilation

71152B

Drawings

B&R 2024 Sheet

Flow Diagram HVAC Misc. Service Building

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

B&R 2037

Cooper Nuclear Station Flow Diagram H&V Standby Gas

Treatment and Off Gas Filters

B&R 2040 Sheet

Cooper Nuclear Station Flow Diagram Residual Heat

Removal System

B&R 2040 Sheet

Cooper Nuclear Station Flow Diagram Residual Heat

Removal System Loop B

B&R 2044

High Pressure Coolant Injection and Reactor Feed Systems

DC 5547470

Turbine Stop Valve Limit Switches

DEC 5521738

Diesel Generator Intake HVAC Hatch Securing Screws

DEC 5535032

Additional Closure for Reactor Building Secondary

Containment Duct Exhaust Hatches

DEC 5545806

HVAC Hatch Redundant Restraints

DEC 5546702

Neutron Monitoring System Power Supply Mounting Screw

Replacement

Engineering

Changes

TE 10690879

Changes in SW-P-BP Materials of Construction

Cooper Nuclear Station 2024 Nuclear Safety Culture

Assessment

Cooper NSCA 2022 Nuclear Safety Culture Assessment

22

2A1382BA

Reactor Protection System

Audit 23-01

Security Program

04/10/2023

Audit 23-02

Fire Protection

05/10/2023

Audit 23-04

Maintenance

07/17/2023

Audit 23-08

Fitness-for-Duty

11/28/2023

Audit 23-09

Training

2/28/2023

Audit 24-01

Engineering

03/27/2024

Audit 24-02

Corrective Action Program

06/17/2024

Audit 24-03

Technical Specifications and Operations

08/12/2024

LO-2022-0179

USA Work Management Self-Assessment 2023

LO-2023-0140

Adverse Trend Configuration Management (CR-CNS-2023-

01423)

LO-2023-0236

Response to NRC Question

Miscellaneous

LO-2024-0046

Pre PI&R NRC Inspection Self-Assessment

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

LO-2024-0090

24 Site Excellence Plan

LO-2024-0157

Resolution of the 2024 Nuclear Safety Culture Assessment

Results and Actions

LO-2024-0163

24 Nuclear Safety Culture Assessment Weakness

LO-20YY-XXXX-

XXX

23-0005-003, 2023-0010-025, 2023-0010-029,

23-0010-033, 2023-0010-051, 2023-0010-062,

23-0015-011, 2023-0092-005, 2023-0093-001,

24-0007-096, 2024-0007-119, 2024-0007-120,

24-0007-122, 2024-0007-125, 2024-0007-129,

24-0133-001

VM 1034

NAMCO Composite Limit Switch and Connector Manual

VM 144

Service Water Booster Pumps

VN 1549

Lambda Power Supply and Rack Adapters Composite

Material

08/27/2024

WT-2020-0013-

019

Preventive Maintenance Program Department: EFIN

WT-2023-0002-

2

Determine correct position for valve

WT-20YY-XXXX-

XXX

2019-0034-009, 2023-0015-011, 2023-0015-072,

23-0031-062, 2023-0031-099, 2023-0031-112,

23-0043-006, 2024-0004-001, 2024-0013-018

0-Barrier-MISC

Miscellaneous Buildings

0-Barrier-Reactor

Reactor Building

0-CNS-FAP-LI-

001

Performance Improvement Review Group (PRG) Process

0-CNS-HU-102

Human Performance Traps and Tools

0-CNS-LI-102

Corrective Action Process

0-CNS-LI-108--01

CFR 21 Evaluations and Reporting

0-CNS-LI-118

Cause Evaluation Process

0-CNS-LI-121

Trending and Performance Review Process

0-CNS-QV-136

Nuclear Safety Culture Monitoring

0-CNS-WM-002

Critical Evolutions

0-CNS-WM-100

Work Order Generation, Screening, and Classification

Procedures

0-CNS-WM-102

Work Implementation and Closeout

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

0-CNS-WM-104

On-Line Schedule Risk Assessment

0-EN-DC-105

Configuration Management

4C0

0.1.NUC.Safety

Nuclear Safety and Management Expectations

0.26

Surveillance Program

0.31

Equipment Status Control

101

0.4

Procedure Change Process

0.40

Work Control Program

0.48.1

Differing Professional Opinion Resolution Process

14.2.1.1

APRM, LPRM, RBM, and Flow Unit Power Supply

Calibration and Examination (Div 1)

2.2.47

HVAC Reactor Building

2.4HVAC

Building Ventilation Abnormal

3-CNS-DC-112

Engineering Change Request and Project Initiation Process

3-CNS-DC-141

Design Inputs

3-CNS-DC-203

Maintenance Rule Program

3-CNS-DC-204

Maintenance Rule Scope and Basis

3-CNS-DC-205

Maintenance Rule Monitoring

3-CNS-DC-206

Maintenance Rule (a)(1) Process

3-CNS-DC-207

Maintenance Rule Periodic Assessment

3-CNS-DC-324

Preventative Maintenance Program

3-EN-DC-115

Engineering Change Process

6.1APRM.305

ARPM System (Flow Bias and Startup) Channel Calibration

(Div 1)

6.1RBM.302

RBM Channel Calibration (Div 1)

6.1RHR.201

RHR Power Operated Valve Operability Test (IST) (Div 1)

6.2HV.602

Air Flow Test of Fan Coil Unit HV-DG-1D (Div 2)

6.2RHR.201

RHR Power Operated Valve Operability Test (IST) (Div 2)

6.RPS.302

Main Turbine Stop Valve Closure and Steam Valve

Functional Test

6.RPS.303

Turbine Stop Valve Closure Channel Calibration

7.0.1.7

Troubleshooting Plant Equipment

7.0.4

Conduct of Maintenance

7.0.5

CNS Post-Maintenance Testing

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

7.2.14

RHR SWBP Overhaul and Replacement

7.3.25.1

NAMCO EA740 Series Limit Switch Maintenance

IP-ENG-001

Standard Design Process

1C0

JA-PI-03

OE Screening and Publishing

Work Orders

WO 5408016, 5425553, 5462978, 5483368, 5517702, 5520987,

21737, 5521738, 5529935, 5546110, 5546699, 5551156,

5552524