IR 05000298/2025004

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000298/2025004 and Independent Spent Fuel Storage Installation Report 07200066/2025001
ML26034C371
Person / Time
Site: Cooper  
Issue date: 02/11/2026
From: Douglas Dodson
NRC/RGN-IV/DORS/PBC
To: Dia K
Nebraska Public Power District (NPPD)
References
IR 2025004, IR 2025001
Download: ML26034C371 (0)


Text

February 11, 2026

SUBJECT:

COOPER NUCLEAR STATION - INTEGRATED INSPECTION REPORT 05000298/2025004 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION REPORT 07200066/2025001

Dear Khalil Dia:

On December 31, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Cooper Nuclear Station. On January 22, 2026, the NRC inspectors discussed the results of this inspection with Justin Reimers, General Manager Plant Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Douglas E. Dodson II, Chief Reactor Projects Branch C Division of Operating Reactor Safety Docket Nos. 05000298 and 07200066 License No. DPR-46

Enclosure:

As stated

Inspection Report

Docket Number:

05000298 and 07200066

License Number:

DPR-46

Report Number:

05000298/2025004 and 07200066/2025001

Enterprise Identifier:

I-2025-004-0007 and I-2025-001-0013

Licensee:

Nebraska Public Power District

Facility:

Cooper Nuclear Station

Location:

Brownville, NE

Inspection Dates:

October 1, 2025, to December 31, 2025

Inspectors:

B. Baca, Health Physicist

G. Birkemeier, Resident Inspector

L. Brookhart, Senior Spent Fuel Storage Inspector

G. Kolcum, Senior Resident Inspector

K. Murphy, Operations Engineer

R. Williams, Operations Engineer

Approved By:

Douglas E. Dodson II, Chief

Reactor Projects Branch C

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Cooper Nuclear Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Cooper Nuclear Station began the inspection period at rated thermal power. On October 11, 2025, reactor power was reduced to 80 percent due to grid demand. The unit returned to rated thermal power on October 12, 2025. On November 7, 2025, reactor power was reduced to 70 percent for a planned rod sequence exchange. The unit returned to rated thermal power on November 8, 2025. On November 10, 2025, reactor power was reduced to 75 percent for a planned rod sequence exchange. The unit returned to rated thermal power on November 10, 2025. The unit remained at rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures for the following systems:

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)division 2 core spray on October 1, 2025

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1)service water pump room and intake structure on November 5, 2025 (2)diesel generator building on December 4, 2025

71111.06 - Flood Protection Measures

Flooding Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated internal flooding mitigation protections in the:
  • control building basement on November 7, 2025

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered from September 23, 2025, to October 31, 2025.

71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)

(1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on November 12, 2025.

Annual Requalification Operating Tests The inspectors evaluated the adequacy of the licensees annual requalification operating test.

Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the licensee is effectively evaluating their licensed operators for mastery of training objectives.

Requalification Examination Security The inspectors evaluated the ability of the licensee to safeguard examination material, such that the examination is not compromised.

Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.

Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.

Control Room Simulator The inspectors evaluated the adequacy of the licensees control room simulator in modeling the actual plant and for meeting the requirements contained in 10 CFR 55.46.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during a quarterly rod pattern adjustment and scram time testing on November 8, 2025.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated operations training simulator loss of offsite power/loss of one diesel on October 28, 2025.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1)diesel generator 1 Yellow risk due to unplanned auto start during undervoltage relay test on October 6, 2025 (2)planned standby liquid control maintenance resulting in Yellow risk on October 15, 2025 (3)planned diesel generator 2 maintenance window resulting in Yellow risk on October 21, 2025

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (1 Sample)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1)diesel generator 1 day tank leak at high level shutoff switch on October 1, 2025

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (3 Samples)

(1)control rod drive accumulator high water level for HCU 34-31 for corrective maintenance on October 1, 2025 (2)diesel generator 2 post-maintenance testing on October 24, 2025 (3)fire pump E maintenance on November 5, 2025

Surveillance Testing (IP Section 03.01) (4 Samples)

(1)fire pump D surveillance test on October 3, 2025 (2)alternate rod insertion and anticipated transient without scram reactor vessel high-pressure channel functional test on October 3, 2025 (3)undervoltage relay functional test on October 6, 2025 (4)low-pressure coolant injection train A surveillance test on November 6, 2025

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (1 Sample)

(1) April 1, 2024, through March 31, 2025

BI02: RCS Leak Rate Sample (IP Section 02.11) (1 Sample)

(1) April 1, 2024, through March 31, 2025

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1) July 1, 2024, through September 30, 2025 PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)
(1) July 1, 2024, through September 30, 2025 71152A - Annual Follow-up Problem Identification and Resolution

Annual Follow-up of Selected Issues (Section 03.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1)diesel generator 1 unplanned automatic start during undervoltage relay test on October 6, 2025

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02) (1 Sample)

(1) The inspectors reviewed the licensees corrective action program to identify potential trends in motor-operated valve position indications that might be indicative of a more significant safety issue.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60855 - Operation of an Independent Spent Fuel Storage Installation The inspectors performed a review of the licensees independent spent fuel storage installation (ISFSI) activities to verify compliance with Certificate of Compliance (CoC) 72-1004, License Amendment 18, and the Orano TN NUHOMS Final Safety Analysis Report (FSAR),

Revision 22. The inspectors reviewed selected procedures, corrective action reports, and records to verify ISFSI operations were compliant with the license technical specifications, requirements in the FSAR, and NRC regulations.

Operation of an Independent Spent Fuel Storage Installation (1 Sample)

(1) The inspectors evaluated the licensees dry cask storage program implementation during an in-office remote inspection from December 15-17, 2025. Due to the government shutdown that occurred during the quarter, regional inspectors were unable to observe the licensee's recent spent fuel loading campaign. The Cooper Station ISFSI pad was designed to store 52 Orano Transnuclear (TN) NUHOMS Horizontal Storage Modules (HSMs) using the 61BTH dry shielded canisters (DSCs)

(containing 61 boiling-water reactor spent fuel assemblies). At the time of the inspection, the licensee had 38 DSCs placed within the HSMs. NRC resident inspectors were utilized to conduct a physical walkdown of the ISFSI pad and surrounding area under the guidance and direction of regional ISFSI inspectors.

The inspectors reviewed related documents of the following activities during the inspection:

  • walkdown of the ISFSI pad observing HSMs condition, radiological postings, and fire protection implementation
  • fuel selection evaluations for the canisters loaded since the last NRC ISFSI inspection (canisters 31 - 38)
  • radiation surveys for radiological dose at the owner-controlled area boundary to verify compliance with the requirements of 10 CFR 72.104 for 2020 through 2024
  • selected ISFSI-related condition reports issued since the last NRC ISFSI inspection
  • quality assurance program implementation, including recent audits, surveillances, receipt inspection, and quality control activities related to ISFSI operations
  • compliance to technical specifications for operational surveillance activities and FSAR required maintenance activities
  • documentation of annual maintenance activities for the cask handling crane and special lifting devices
  • selected licensee design changes and program changes for the ISFSI performed under the 10 CFR 72.48 program

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On December 16, 2025, the inspectors conducted a technical debrief for the licensed operator requalification exams with Khalil Dia, Site Vice President, and other members of the licensee staff.
  • On December 18, 2025, the inspectors presented the ISFSI triennial inspection results to Bill Chapin, General Manager of Plant Operations, and other members of the licensee staff.
  • On January 22, 2026, the inspectors presented the integrated inspection results to Justin Reimers, General Manager of Plant Operations, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

CR-CNS-

21-03087, 2022-01863, 2023-02807, 2024-00467, 2024-

03120, 2025-00490, 2025-02958, 2025-03100, 2025-03145,

25-03929, 2025-04131, 2025-04132, 2025-04248, 2025-

04342, 2025-04509, 2025-04512, 2025-04616, 2025-04617,

25-04686, 2025-04842

Engineering

Changes

PAD 162260,

PAD 202752

Dry Cask Storage Licensing Basis Implementation for

Changes to 72.212 Report

CFR 72.212

Report

Cooper ISFSI 72.212 Report

Certificate of

Conformance

DSC Spent Fuel Cask 31-38

Various

Dates

Engineering

Evaluations

NEDC 08-042

TN Transfer Cask and DSC Weights for Various Spent Fuel

Loading Configurations

08/25/2025

Miscellaneous

NUH-06-113.92

Equipment Use Certification

Procedures

6.LOG.61

Daily Surveillance Log - Modes 1, 2, and 3

Various

Dates

Radiation

Surveys

Environmental Radiological Operating Reports and Area

DLR Work Sheets for 2020-2024

Various

Dates

Audit Report 22-

NIOS Audit 22-04

Audit Report 24-

NIOS QA Audit Report 24-04

Surveillance

SS24-002

Orano TN Americas QA Surveillance

Self-Assessments

Surveillance

SS24-007

Orano TN Americas Surveillance Report

60855

Work Orders

WO 5491287

0-CNS-FAP-WM-

016

Seasonal Reliability

71111.01

Procedures

2.2.99

Supplemental Diesel Generator System

Drawings

2045, Sheet 1

Cooper Nuclear Station Flow Diagram

N58

71111.04

Procedures

0.31

Equipment Status Control

101

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2.2.9

Core Spray System

Drawings

CNS-FP-256

Intake Structure

FP-344

FP-383

Fire Plans

FP-384

Miscellaneous

NEDC 11-089

Fire Safety Analysis for Fire Area IS-A

71111.05

Procedures

CNS-FP-236

0-Barrier-Misc, Miscellaneous Buildings

71111.06

Miscellaneous

NEDC-09-102

Internal Flooding - HELB, MELB, and Feedwater Line Break

CR-CNS-2024-

00388 Root

Cause

Operations Medical Records Update Issue

2/29/2024

CR-CNS-2025-

2537

Licensed Operator Medical Restriction

05/27/2025

Corrective Action

Documents

LO 2024-0170

Assessment Report for the 2025 Licensed Operator

Requalification (LOR) Program Pre-IP71111.11 Assessment

06/24/2025

Summary of CRs Related to Operator Actions & Errors in the

Control Room

Plant Events and OE Summary

Operating Test - JPMs - Week 1 (5)

09/24/2025

Operating Test - Simulator Scenarios - Week 1 (3)

09/24/2025

Operating Test - Simulator Scenarios - Week 4

10/15/2025

Biennial Written Exam - SRO - Week 1

11/12/2025

Biennial Written Exam - RO - Week 1

11/12/2025

Licensed Operator Medical Records (9)

License Operator Reactivation Form (3)

Form 16

Examination Question and Comment Form

11/12/2025

OTH0151010

Medical ANSI Standards Power Point

Miscellaneous

TABLE 03.03-1

from IP 71111.11

Examination Results - Written and Operating Test

2/16/2025

71111.11B

Procedures

NTP8.1

Administration of Licensed Operator Medical Examination

Program

07/23/2025

71111.11Q

Miscellaneous

CR-CNS-

25-05097, 2025-05099, 2025-05100, 2025-05101, 2025-

05102, 2025-05103, 2025-05104, 2025-05105

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

10.9

Nuclear Performance, Control Rod Scram Time Evaluation

2.0.1

Plant Operations Policy

2.1.10

Station Power Changes

28

2.2.19

480 VAC Auxiliary Power Distribution System

5.3AC480

480 VAC Bus Failure

5.3EMPOWER

Emergency Power During Mode 1, 2, or 3

Procedures

6.RPS.302

Main Turbine Stop Valve Closure and Steam Valve

Functional Test

Corrective Action

Documents

CR-CNS-

25-04649

Protected Equipment Tagout SLC-1-SLC-P-A, Week 2541

Miscellaneous

Protected Equipment Tagout DGB-1-DG2, Week 2516

71111.13

Procedures

6.1EE.306

4160V Bus 1F Undervoltage Relay Channel Functional Test

Corrective Action

Documents

CR-CNS-

25-04578

Procedures

6.DG.602

Diesel Fuel Oil Availability

71111.15

Work Orders

WO 22461

Corrective Action

Documents

CR-CNS-

25-04575, 2025-04595, 2025-04649, 2025-04848, 2025-

04856, 2025-04861, 2025-04866, 2025-04867, 2025-04872,

25-04885, 2025-04888, 2025-04890, 2025-04893, 2025-

04897

Miscellaneous

ARI and ATWS/RPT Reactor Vessel High Pressure Channel

Functional Test

6.FP.102

Station Fire Pump Surveillance Testing

2.28

Control Rod Drive Hydraulic System

24

6.1RHR101

RHR Test Mode Surveillance Operation (IST)(DIV 1)

Procedures

6.FP.101

Fire Pump Functionality Test

71111.24

Work Orders

WO 5401062, 5476817, 5497489, 5497853, 5516744, 5520152

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

CR-CNS-2024-

4656

Worker Received Dose Rate Alarm

10/16/2024

Performance Indicator Verification Data Summary -

July 2024 through September 2025

25 Year to Date Gaseous Effluent Dose Calculations:

January through September 2025

71151

Miscellaneous

N1S2025022

Cooper Nuclear Station Annual Radioactive Effluent Release

Report

04/25/2025

Corrective Action

Documents

CR-CNS-

25-04649

71152A

Procedures

6.1EE.306

4160V Bus 1F Undervoltage Relay Channel Functional Test

(DIV 1)

71152S

Corrective Action

Documents

CR-CNS-

25-01713