e7m
-
,
,,
'.
,
Hs'
,
,
[,t"3l
,
L.
-
.
L
,
APPENDIX
'
U.S. NUCLEAR REGULATORY. COMMISSION-
[
' REGION IV
.
NRC. Inspection Report:
50-298/90-07 Operating License: DPR-46
Docket: 50-298
,
Licensee: 'NebraskaPublicPowerDistrict(NPPD)
P.O. Box 499
!
Columbus, NE 68602-0499 facility Name: Cooper Nuclear Station (CNS)
Inspection At: CNS, Brownville, Nebraska-
..
'
Inspection Conducted: March 19-23, 1990
,
i
!nspector:
8.wg 3-so-yo p W. M. McNeill, Reactor Inspector, Materials Date
'{
and Quality Programs Section, Division of Reactor Safety
,
l Approved:
[8vm 3-3o-9o l
I. Barnes, Chief, Materials and Quality Date Programs Section.. Division of Reactor Safety
'
.
Inspection Summary
- g Inspection Conducted March 19-23.1990(Report 50-298/90-07)
'
Areas. Inspected: Routine, unannounced inspection of action on previously
"l identified inspection findings and observation of inservice inspection work and work activities.
t
,
Results:
Inservice. inspection (ISI)workactivitieswerefoundtobe satisfactorily controlled, with examination personnel being appropriately
,
qualified and demonstrating com)11ance with the examination, calibration, and i
s
,
documentation requirements of the ISI procedures. No violations or deviations i
were identified during this inspection.
)
l
,R f4 DOC
,
a
.
,
- .
u. : -
p a
~
p
.
,
l. d.c
-
- ..
.
'
2~
y
[
!
!.
i
!
DETAILS i
1. ' PERSONS CONTACTED NPPD
'
L
- L. A. Bray, Regulatory Compliance Specialist
~
'
B. L. Crow, Lead Mechanical Engineer
!
,
- J. R. Flaherty Plant Engineering Manager
!
'
,
- R. W. Foust, Engineering Programs F.
- S. S. Freiborg, Assistant Plant Engineering Supervisor i
- R. L. Gardner, Maintenance Manager
.
- R. L. Gibson, Quality Assurance (QA) Supervisor
!
'*G. R. Horn, Nuclear Operations Division Manager R.A. Schutz,InserviceInspection/InserviceTesting(ISI/IST) Engineer J
. *G. R. Smith, Nuclear Licensing and Safety Supervisor
- J. L. Smith, Welding Program Supervisor
,
- E. W. Togel, QA Engineer I
' General Electric Company (GE)
{
'
E. P. Bailey, Acting Project Manager and Level III T.-R. Bordenet, Level I P. R. Johnson, level II
,
J. D. McFerran, Level II
'
l S. S. Meeker, Project Manager O. Neal, Level II H. M. Pollard, Level 1
i
,
H. W. Schlort, Level II-
,
,
D. J. Walter, Level II-
.
I S. L. Widdon, Level'III (
Hartford Steam Boiler Inspection and Insurance Company
>
L. E. Dillon, Authorized Nuclear Inservice Inspector
!
i
- NRC
- I. Barnes, Section Chief
'
'W..R. Bennett, Senior Resident Inspector
,
. *L'. D. Gilbert,~ Reactor Inspector
.
- G. A. Pick, Resident Inspector
- Denotes th'ose persons that attended the exit meeting on March 23, 1989.
!
'-
The inspector also contacted other personnel including administrative and
, - clerical personnel.
,
t
,
1
,
, ~.
.
-3-
2.
ACTION ON PREVIOUSLY IDENTIFIED INSPECTION FINDINGS (92702)
(Closed) Violation (298/8917-01): The ISI program failed to identify all applicable supports and welds.
A detailed review of the station isometric drawings and weld maps was performed by the licensee, with the result that additional supports and welds were identified as missing in the program. The omissions, a total of 40 welds and 44 supports, have been added to the ISI program through the issuance of Addenda in July and October 1989. The inspector reviewed the close-out of Nonconformance Report 89-071, which detailed this problem. No additional problems were noted during this review.
3.
ISI-0BSERVATION OF WORK AND WORK ACTIVITIES (73753 and 57080)
The objectives of this inspection were to ascertain whether ISI, in particular ultrasonic examination, and repair and replacement of components were being performed in accordance with Technical Specifications (TS), the applicable American Society of Mechanical Engineers (ASME) Code, and correspondence between NRC, and the licensee concerning relief requests.
3.1 Review of Program and Procedures
,
The inspector reviewed TS, Amendment 130, dated May 24, 1989; " Inservice Inspection Program for ASME Class 1, 2, and 3 Components," Revision 3, March 3,1986, and its Addenda through October 1989; and the following GE ISI procedures:
MIMSN-W812, " Manual Procedure for Magnetic Particle Examination,"
Revision 1, dated October 30, 1986.
MIUV-W812. " Manual Ultrasonic Testing of RPV Welds," Revision 2, dated i
February 3, 1988.
!
VT-06,"ProcedureforRPVInternalsInvesselVisualInspection(IVVI),"
'
Revision 0, dated February 14, 1989.
No violations or deviations were identified during the review of the ISI i
program and procedures.
i 3.1-Program Implementation The inspector witnessed the performance of the magnetic particle testing (MT)
]
of Weld RBS-CEl-1 on Drawing 30-2614-2; ultrasonic testing (UT) of Reactor Vessel Flange Weld VCB-BC5-2 and Reactor Vessel Nozzle Welds NVIR-BD-N3B, -N3D, and -NSA on Drawing 27; and visual examinations (VT-1) of the Core Spray Piping Loops A and B.
It was noted by the inspector that examination personnel appropriately complied with the examination, calibration, and documentation requirements of the
i
i
\\
..,,
-
.*
.
.
.,.
-q
.
e
.
>
.
approved procedures. The use of the correct UT calibration blocks was verified by the-inspector. The inspector also checked the personnel certifications to
verify that. personnel were appropriately qualified for the examinations
'
performed. The equipment used (MT yokes, MT powders, UT search units,
<
,
UT scopes, and UT gels) was found to be appropriately certified and the
,
instruments calibrated as required.
Inspection of repair and replacement
,
activities is documented in NRC Inspection Report 50-298/90-11, which was performed concurrently with this inspection.
No violations or deviations were identified during the review of program
!
implementation.
3.3 Summary
.
ISI work activities were found to be satisfactorily controlled with examination
'
personnel being appropriately qualified and demonstrating compliance with the examination, calibration, and documentation requirements of the ISI procedures.
'
4.
EXIT MEETING An exit meeting was held on March 23,1990, with those individuals denoted in paragraph 1 of this report. At this meeting, the scope of the inspection and
,
the findings were sumarized. The licensee did not identify as proprietary any i
of the information provided to or reviewed by the inspector.
,