ML20235R354
| ML20235R354 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 02/23/1989 |
| From: | Marilyn Evans NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Doerflein L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20235R314 | List:
|
| References | |
| FOIA-88-519 NUDOCS 8903030269 | |
| Download: ML20235R354 (2) | |
Text
6 Y2 3 Y2]'
l' L
F r.>ed t" tu:. t ar r v Duer f l es n.
Pr oj ec t Eng: over. DAF
~
~ T he eugti:
DaEld L anger. ' Ch j e 4, BWPS,. CRS [-
From:
Mi c hel e Evans. Oper a t i ons Engi neer ', - 8WRS,. DRS Gubject:
PATP input for Pil gr i m Restar t. Readi ness Repor t.
Power Asc ens i on Test Procr am The August 27,il986. update to CAL.86-10 included ~ the. r equi r emen t for BECo to submi t ; a ' f or mal restar t program and schedule wi th appropriate hold points to the'NRC.for review and approval.
The licensee submittee thes e - pr oposed Power / Ascension Progr.am to NRC management on. October 15, -
-1987 per BECo Letter 87-163.
BECo Letter.88-33, dated Febr ver y. 29, 1900 r esponded to the NRC request for. additiona) information. dated
' January 28, 1988. A Management Meeting was' held at NRC: R1 on Aprt118, 1988 to f ur ther discuss the' licensee's February 29, '988 response.
During.the-Management Meeting,'three issues.were-identified as requiring 1 additional NRC review; the licensee's anal ysi s of the affect of plant modi f i cati ons on-the dynami c response of the' plant;,Rosemount transmitter " ringing" problems; and r evi ew of approved procecures TP87-114 and TP87-147.
BECo Letter 88-117, dated August 4,.1988 responded tol the.Rosemount. trarsmi tter " Ringing" concerns.
Inspectson Reports 50-293/88-14 and 50-293/88-27' document results of onsite inspections conducted regarding.the overall Power Ascension Program and these issues.
The NRC staff has concluded that the l icensee's Power ' Asc ensi on Pr ogr am satisfies the NRC's request for a formal restart program and schecule wi th -- appropr i at e hol d poi nt s.
Issues identified during the Management Meeti ng have been adequatel y r esol ved with the exception of the Rosemount transmitter " ringing". issue.
Further review of the licensee's technical justification for not instrumenting the transmi tter s to detect possibl e " ringing" problems during the Power Ascension Program is ongoing.
893$30269BM23 g
I C
RE
--519 PDR a
P
PILGRIM RESTART ASSESSMENT PANEL
'4 Actions Punchlist Taraet Actioni Reference Date Remarks 1.
" Final" Response to Senator Iterim Resp. of 8/21/87 Requires staff's-W.B. Golden - on manage-Management ment issues Assessment 2.
Copy of " Final" Golden L. Zech ltr. of 5/21/87 response to Congressman Gerry Studds 3.
Arrange 01/01A ED0 Memo of 7/27/87 Region to determine Commission brief, if Sniezek Memo to Reofonal if brief is required Adminis, of 8/27/87 nr.;essary 4.
Comission Meeting T. Roberts (Acting Chair) ltr. to Congressman Studds of 6/19/87 L. Zech ltr. to Gov.
Dukakis of 6/25/87 5.
Inform Congressman Markey Markey ltr of 7/31/86 of Comission Meeting 6.
Public Meeting with J. Taylor 1tr to W. Golden After BEco W. Golden and Petitioners of 12/19/86.
has completed T. Murley ltrs. to W. Golden actions for of 2/20/87 and 4/1/87 restart 7.
Assessment of Restart W. Kane to W. Russell Need rest of BEco Readiness to Director 1tr. of 7/8/87 Restart Plan of NRR Need Diagnostic Team Inspection
/M J