U.S. NUCLEAR P.EGULATORY CON 4ISSION l
REGION I
Report No. E0-286/82-25 Docket No. 50-286
}
License No. DPR-64 Priority Category C
--
Licensee: Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Facility Name:
Indian Point Nuclear Generating Station, Unit 3 Inspection at: Buchanan, New York Inspection conducted: December 16, 1982 to January 15, 1983 Inspector:
p
..
,
jl
- d & r n,e r.
/ / /7
T Ke Sen drr Resident Inspector
/
date Approved by:
l
? Yd H. Kister, Chief, Reactor Project Section f
' date IC, DPRP Inspection Summary:
Inspections on December 16, 1982 to January 15, 1983 (Inspection Report 50-286/82-25)
Areas Inspected:
Routine onsite regular and backshift inspections of plant opera-tions including shift logs and records; plant tour; surveillance; maintenance; review of monthly operating report; dc :ument control; records program, and injury to two instrument technicians. The inspection involved 103 inspector hours by the resident inspector.
Results: Of the seven areas inspected, no violations were identified in six areas.
One apparent violation was identified in one area, (fire protection system in-
operable, and failure to maintain a transient log, details, paragraph 8.B).
I l
8302070348 830124 gDRADOCK 05000286
.
.
..
J
.
.
DETAILS 1.
Persons Contacted M. Albright, Instrument and Control Superintendent J. Brons, Resident Manager J. Dube, Security and Safety Supervisor D. Halama, Q. A. Superintendent W. Josiger, Superintendent of Power J. Perrotta, Radiological and Environmental Services Superintendent S. Munoz, Technical Services Supervisor E. Tagliamonti, Operations Superintendent J, Vignoia, Maintenance Superintendent The inspector also interviewed and observed other licensee employees in-cluding members of the operations, health physics, technical services, maintenance, and security staffs.
2.
Licensee Actions on Previous Inspection Findings (Closed) Infraction (50-286/79-20-06) Failure to store single copy records as required by ANSI N45.2.9 or NFPA-232-1976. A recent inspection verified that single copy records are being stored in accordance with ANSI N45.2.9.
Further details are in paragraph 8 of this report.
3.
Plant Tour i
A.
Nomai and backshift inspections were conducted during routine entries into the protected area of the plant, including the control room, PAB, fuel building, and containment. During the inspection activities, discussions were held with operators, technicians (HP & I&C), mechanics, foremen, supervisors, and plant management. The purpose of the inspec-tion was to affim the licensee's conmitments and compliance with 10 CFR, Technical Specifications, and Administrative Procedures.
Parti-cular attention was directed in the following areas:
Instrumentation and recorder traces for abnormalities;
-
Proper control room and shift manning;
-
Proper use of procedures;
-
Review of logs to obtain plant conditions;
-
Verification of proper radiologically controlled areas
-
a'id access points; e
I
-
--
,
, - - -
._
. _. _ _ _ _ _ _ _ _ _ _ _ - _
.
.
-3-Verification of surveillance testing for timely
-
completion; Verification of safety related tagouts;
-
Plant housekeeping and cleanliness;
-
That protected area access controls were in conformance
-
with the security plan, including sufficient guards to perform duties, and that selected gates and doors were closed and locked; Selected liquid and gaseous samples to verify conformance
-
with regulatory requirements prior to release; and,
-
Boric acid samples to confim proper boric acid level for plant shutdown conditions.
B.
During the inspection, the inspector reviewed the following pro-cedures, documents, or evolutions:
-
Radioactive Waste Release Permit (liquid & gaseous)
Various shift turnover checklists
-
-
Security Station Logs and Radio Checks
-
Jumper Log Selected Operators' Logs
-
Selected Tagouts
-
Selected Radiation Exposure Authorization (REA's)
-
No violations were identified.
4.
Surveillance A.
The inspector either directly observed the perfomance of or reviewed corrpleted surveillance procedures to ascertain the following:
That the instrumentatien used was properly calibrated;
-
-
That the redundant systera or component was operable where required; That properly approved procedures were used by qualified
-
personnel;
-
That the acceptance criteria vere met; That the test data were accurate and complete;
-
_.__ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _
i-4-That proper reviews, by the licensee, had been conducted;
-
That the results of the tests met Technical Specification
-
!
requirements; and, That the testing was done within the required surveillance
-
'
schedule.
The inspector reviewed the following tests:
3PT-M37A Fire System Check (Technical Specification)
-
3PT-M46 Component Cooling
-
3PT-R34 RHR Valve Test 730 & 731
-
3PT-R67 Low Head to High Head S.I. Flow Path
-
No violations were identified.
5.
Maintenance The inspector selected completed maintenance activities listed below to ascertain the following:
-
The activities did not violate a limiting condition for operation; That redundant components were operable;
-
That equipment was tagged out in accordance with licensee
-
i approved procedures; That approved procedures, adequate to control the activity,
-
were being used by qualified technicians; That Q/C hold points were observed, and that materials were
-
properly certified;
'
That radiological controls were proper and in accordance w HE
-
licensee approved radiation exposure authorizations; and,
-
That the equipment was properly tested prior to return to service.
1) Cleaning, Lapping, and Resetting the Stroke on Air Ejector Discharge to the Containment - PCV 1229 and PCV 1230 Documents Reviewed:
-
Work Step List
-
Gasket Certification
-
Torque Wrench Calibration for M321
-
_ _ _ _ _ - _ _ _ _.
_
.
-5-2) Replacement of Heat Detector in Fan Cooler Unit 32 Doctacents Reviewed:
-
Work Step List
-
Certification for Replacement Detect-a-fire Assembly
-
Purchase Order P0 80 IP 3371
-
Radiation Exposure Authorization 2263
-
Procedure 3PT-R43 Used to Test Installation
-
Removed Jumper 467 (removed as a result of the installation)
-
3) Replacement of Solenoid Valve FCV-1276 Service Water to the Diesel Generators Work Request 3260
-
Work Step List
-
Certification for Replacement Solenoid
-
"
"
Teflon Tupe Purchase Orders 80-IP-2343
-
"
"
82-IP-2231 No violations were identified.
6.
Review of Monthly Report A.
Monthly Operat_i_ng Report The Monthly Operating Report for November,1982 was reviewed. The review included an examination of selected maintenance work requests, and an examination of significant occurrence reports to ascertain that the summary of operating experience was properly documented.
B.
Findings:
The inspector verified through record reviews and observations of maintenance in progress that:
The corrective action was adequate for resolution of the
-
identified items; and, The operating report included the requirements of TS 6.9.1.6.
-
The inspector has no further questions relating to the report.
,
,.,..
-
,,
-6-
.
7.
Document Control Program
,
A.
Documents Reviewed:
10 CFR 50 - Appendix B, VI Document Control Administrative Procedure AP-12 Modifications Administrative Procedure AP-18 Record Control & Storage Administrative Procedure AP-34 Processing Control and Filing of Documents B.
Inspector Findings:
The inspector verified.that the above-listed Station Administrative Pro-cedures addressed the concerns of 10 CFR 50, and that a document control program is in effect. Particular attention was given to drawing control.
The inspector verified that current as-built drawings in the control room were consistent with the current drawings stored in the records vault.
The inspector also verified that:
Administrative controls are in effect for the use and issuance
-
,
of drawings, including changes, as a result of design modifi-cations; and, Procedures are in effect for the control of obsolete drawings
-
and drawings that are not controlled.
.
The inspector selected documents and drawings at random, and verified that the field copies are consistent witn the current master copies.
The licensee is currently in the process of verifying all drawings to
"as built." The program has been completed through the year 1981, and is continuing into 1982 No violations were identified.
Records Program
.
A.
Documents Reviewed:
Technical Specificetions, Chapter 6 Station FSAR, App;' cable Sections
.
Administrative Pro _! dure AP-13 Record Control and Storage
"
"
AP-34 Processing Control and Filing of Documents i
ANSIN45.2.9(1974) Requirements for Storage of Records Quality Assurance Manual, Section 17.2.17, Q. A. Records Regulatory Guide 1.88, Storage of Records
,<
s
__
_
_
_
_
,. _,.. _... _..
-7-B.
Inspector Findings:
The inspector verified that the requirements and provisions required by ANSI 45.2.9 are delineated in the Station Administrative Procedures and Technical Specifications. The inspector also verified that the records are being stored in the required record storage facilities and filing cabinets.
The inspector verified that administrative duties have been delineated in the administrative procedures to provide for the disposition and storage of Quality Assurance Records.
The inspector conducted a tour of the storage facilities, and a veri-fication of selected documents to determine that the requirements of ANSI 45.2.9 and the administrative procedures were being adhered to.
The inspector identified the following nonconforrar.ces:
The installed Halon Fire Protection System had been disconnected,
-
thus rendering the fire protection system inoperable; and, The transient or operational cycling records for those plant
-
components that have been designated to operate safely for a limited number of transients or operational cycles did not exist.
These nonconformances are considered a violation. (82-25-01)
The inspector had discussions with the licensee concerning the above items. The licensee stated that the halon system was made inoperable to use parts from that system in other portions of the fire system designated to protect safety equipment. The rationale behind this action was that the records vault is alarmed in the control room, which is continuously manned, and the fire brigade ould respond to any indications of a fire.
(The fire brigade is on site 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day.) The inspector pointed out to the licensee that installed sys-tems must be operable or alternate systems should be in place to function in their behalf.
Further discussions indicated that the lack of the above-mentioned records was an oversight on the part of the licensee.
_
_
._
. _ _ _ _ _ _ _ _ _ - _ _ _
_ _ _ _ _ _ _ _ _ _ _ _
_ _ _
.
-8-C.
Licensee Actions The inspector verified that:
The licensee has issued Purchase Order 83-IP-0076, which procures
-
the services of a vendor representative, to repair and make operable the Halen System as well as ordering any parts necessary to make the system operational.
The licensee intends to enter into a service contract with the
-
vendor to maintain the fire system in the records vault as well as the new Technical Support Facility.
The records vault has several smoke detectors that will alarm in
-
the control room alerting the operators should a condition exist that would warrant the fire brigade to respond. Additional hand.
operated Halon fire extinguishers have been placed at the entrance to the vault, and the day shift records clerks have been instructed in their use.
The fire system has been made operational electrically, and is
-
currently awaiting a mechanical check to become fully operational.
The licensee has developed a transient log to monitor those sys-
-
tems that have a limited number of transients. They are in the process of developing a periodic test to update the log on a monthly basis.
The licensee has instituted a search of all records, required to
-
be maintained by ANSI 45.2.9, to detennine if any other logs or records have been overlooked.
Based on the above actions, the inspector considers these items closed, and will continue to monitor the results of licensee stated actions in future inspections.
Injury to Two Instrument Technicians On December 15, 1982, two Instrument Technicians suffered third degree burns while evaluating the tripping of a reactor coolant pump breaker. Another worker was burned while rendering assistance to the technicians. The three men were transported to the hospital, where the third worker was released, after treatment. Subsequently, one of the technicians was transferred to the burn unit at a nearby facility.
l
)
..
_ _ _______-__________
___ _
.
-9-
,
One technician has been released fran the hospital and is receiving out-patient care. The remaining technician is in stable condition receiving skin grafts and burn treatment at the burn unit.
The licensee is conoucting an investigation into the cause of the incident.
The results will be released when the findings are completed.
The damage to the electrical equipment is under assessment by the vendor.
The licensee has confirmed that no damage occurred to the cable, motor, or containment electrical penetrations.
No violations were identified.
Exit Interview s
At periodic intervals during the course of the inspection, meetings were held with senior facility management to discuss the inspection scope and findings. An additional exit interview was held on January 14, 1982 to summarize inspection findings, and to discuss plant status and current inspector concerns.
'
\\