IE Safeguards Insp Rept 50-286/82-12 on 820712-16.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization,Records & Repts & Locks & Keys.Details Withheld (Ref 10CFR73.21)
ML20027B880
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 09/10/1982
From: Gody A, Mckeown L, Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20027B878 List:
References
50-286-82-12, NUDOCS 8209300256
Download: ML20027B880 (1)


Text

_ _ _

..

.__

_

_

_

-

-

U. S. NUCLEAR REGULATORY COMMISSION Region I Report No. 50-286/82-12 Docket No. 50-286 License No. OPR-64 Safeguards Group IV Licensee:

Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Facility Name:

Indian Point 3 Nuclear Power Plant Inspection At:

Buchanan, New York Inspection Conducted:

July 12-16, 1982 Date of Last Physical Protection Inspection: October 26-30, 1981 Type of Inspection:

Routine, Unannounced Physical Protection Inspectors:

M.

f /fk LA{M M. McKeownt Physical Protection date signed I

s)~pectorE 9 9 rn

'Grego@ C Smith, Physical Protection dg.efig5ed I

Ncdr Approved By:

W

9 #/N T.

, Ch Saf ds date ' signed Inspection Summary:

Routine, announced physical protection inspection on July 12-16,1982 (Report No. 50-286/82-12)

Areas Inspected:

Included a Site Orientation; a review of the Security Plan and implementing Procedures; Security Organization (Management, Personnel, and Response); Records and Reports; Testing and Maintenance; Locks, Keys and Combinations; Physical Barriers (Protected and Vital Areas); Security System Power Supply; Access Controls (Personnel, Packages and Vehicles);

Detection Aids (Protected and Vital Areas); Alarm Stations; and Communications.

Also included a followup to previously identified violations.

The inspection involved 62 inspector hours onsite by two NRC regional-based inspectors.

The inspection began during offshift hours; 6 inspection hours were performed during offshift periods.

-

Results:

The licensee was found to be in compliance with NRC requirements within the areas examined.