IR 05000286/1978003
| ML20038A508 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 02/21/1978 |
| From: | Martin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | William Cahill CONSOLIDATED EDISON CO. OF NEW YORK, INC. |
| References | |
| NUDOCS 8111090512 | |
| Download: ML20038A508 (2) | |
Text
.
C'ENTML FW
-.
. - -.......-_.-
u. -'. 'a- "iIH
-
.
.-
,
.
s -
......g
[ %y
.
' UNIT 5D' STATES-i;
' Is i ' a
" ' ' ' '
'
,
,[
+
NUCLEAR REGULATORY COMMISSION f 'l ) O [ j'.$
REGION 1
\\. \\
'/.. E
$31 PARK AVENUE
'
/
KING OF PR USSI A. PENNSYLV ANI A 19404
%..w...J FEB 211978 DocketNo.50-286fM
.'
-,
Consolidated Edison Company of
~
.,
New York, Inc.
.
ATTN:
Mr. W. J. Cahill, Jr.
l" Vice President 4 Irving Place
~
-
,
Gentlemen:
j'
Subject:
Inspection 50-286/78-03 h
l This refers to the inspection conducted by Mr. R. J. Bailey of this (
office on January 11-1 2, 1 978, at Indian Point, Unit 3, Buchanan, New York, of activities authorized by NRC License No. DPR-64 and to the f-discussions of our findings held by Mr. Bailey with Mr. S. H. Cantone and other members of your staff at the conclusion of the inspection.
s
'
Areas examined during this inspection are described in the Office of
.
Inspection and Enforcement Inspection Report which is enclosed with this
!-
letter.
Within these areas, the inspection consisted of selective examinations of procedures and repre.sentative records, interviews with
'
personnel, and observations by the inspector.
l l
Within the scope of this inspection, no items of noncompliance were
observed.
The areas of your physical security program that are in-
'
complete will remain as outstanding items.
It should be noted that these items must be resolved and the physical security program fully l
implemented prior to the issuance of an operating license.
,
!
In accordance with Section 2.790(d) of the NRC's " Rules of Practice,"
i Part 2, Title 10, Code of Federal Regulation.e, documentation of your I
control and accounting procedures for safeguTrding special nuclear materials and your facility security pr]cedures are exempt from dis-
!
closure; therefore, the en:losed inspection report will not be placed in
,
l i
the Public Document Room and will receive limited distribution.
l
!
h 780830266 8111090512 780221 PDRADOCK05000g
\\
G y.,.,_...-
....- n
.i---.n
.i
. - -..
/
' -
,,,...
.
. ~,
.
- . s.e
,
...-a.s...n s.,, w:
,
s.
.
,
,
-
.
.___
_
-
.-. -
.
--.
.
..
\\
'
(
Consolidated Edison Company of 2-l flew York, Inc.
'
FEC L, x79
,
I No reply to this 1etter is required; however, should you have any ques-.
tions concerning this inspection, we will be pleased to discuss them with you.
- Sincerely, w/
[._
,
'
Wal ter G. Martin, Chief Safeguards Branch
.
k'
Enclosure: Office of Inspection and Enforcement Inspection
[
Report Number 50-286/78-03 (Contains 2.790 Information)
[
i cc: (w/ report cover sheet)
l
'
L. M. Trosten, Esquire (Representing PASNY)
E. R. McGrath, Manager - Nuclear Power Generation Department
J. M. Makepeace, Director, Technical Engineering (Con Ed)
g'
('
L. O. Brooks, Project Manager, IP Nuclear T. Law, Plant Manager (Con Ed)
G. T. Berry, General Manager and Chief Engineer (PASNY)
- .
L. R. Bennett, General. Counsel (PASNY)
c,r!f Rear Admiral P. J. Early, Assistant Chief Engir.eer - Projects (PASNY)
M P. W. Lyon, Manager - Nuclear Operations (PASNY)
p J. P. Bayne, Resident Manager (PASNY)
t J. D. Block, Esquire, Executive Vice Prasident - Administration E. J. Sack, Esquire Dr. J. W. Blake, Manager - Environmental
!
.
.
.
.
.
ah
N
-
--
-.*e
.mm.m-,,.-
~
m m-_,,
,,,,
,,_y, 4.
,
,,,-..
,
,
,