IE Mgt Meeting Repts 50-003/78-07 & 50-247/78-22 on 780607. No Noncompliance Noted.Major Areas Discussed:Details Re Establishment on-site Ofc for Placing full-time NRC Inspector at Site
ML20050B643
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 07/05/1978
From: Caphton D, Keimig R, Rebelowski T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20050B641 List:
References
50-003-78-07, 50-247-78-22, 50-3-78-7, NUDOCS 8204070035
Download: ML20050B643 (2)


Text

-

u. S. NUCLEAR REGULATORY COMMIb ION 0FFICE OF INSPECTION AND ENFORCEMENT

.

.

Region I 78-07 Report No.

78-22

50-003

-

Docket No.

Sn-?"

DPR-5 License No.

D nPR-26 Priority Category C

_

--

Licensee: _ Consolidated Edison Comoany of New York._Inc.

.

4 Irvino Place -

.

New York, New York

Facility Name: Indian Point Nuclear Generating, Units 1 and 2 Meeting at:

Buchanan, New York Meeting conducted:

June 7, 197 NRC Personnel:' 1 /d [v 7[

T.Rebelowdi,ReactorInspector ate signd R. Voimin. Chief. R9 actor Proiects Section No. 1, RO&NS Branch

'

date signed J

u n e c,,, chier eminie+r2+4va nranch r

date signed Approved by: f/#

7/Sf7b'

WM nr b.L.Caphton, Chief [/NuclearSupportSection d' te signed a

?

No. 1, RO&NS Branch Meeting Summary:

Management Meetino on June 7,1978 (Recort Nos.

50-003/78-07 and 50-247/78-22)

Areas Discussed:

Management meeting held at NRC request to discuss details re~-

time NRC inspe: tor at the facility. lated to the establishment of an on-s Results:

of an onsite NRC inspector.All parties concurred on a target date of mid-Septembe

,

Region I Fonn 12-1

.

(Rev. August 77)

-

.

r204070035 780706 PDR ADOCK 05000003 e

PDR

-

_

_ _ _ _ _ _ _ _ _ _ _

.-

.

.

OETAILS 1.

Persons Contacted On June 7,1978, a meeting was held at the Indian Point Nuclear Generating Station to discuss the details of establishing onsite facilities for a Resident Reactor Inspector.

i a.

Licensee Personnel Present Mr. J. Bayne, Resident Manager (PASNY)

Mr. J. Makepeace, Technical Engineering Director (Con Ed)

Mr. E. McGrath, Manager - Nuclear Power Generation (con Ed)

b.

Region I Personnel Present (USNRC)

Mr. J. J. Mc0 scar, Chief, Administrative Branch Mr. R. R. Keimig, Chief, Reactor Projects Section No. 1, RO&NS Branch Mr. T. A. Rebelowski, Reactor Inspector 2.

Areas Discussed Facility to be provided for resident inspector:

trailer, a.

temporarily until permanent facilities can be established.

b.

Trailer siting.

Provision for site extension telephone, c.

d.

Accessibility for telephone installation personnel.

Control of access to inspector's office.

e.

f.

Interface responsibilities for communications equipment in-stallation.

All parties concurred on a target date of mid-September for establish-ment of an onsite inspector.

s e

i

-

-

-

-

-- -

- _

_ _ _ ____________ _

--

s

.

,

JUN 2 01978 Docket No. 50-10-Docket No. 50-237-DocketNo.00-249)

Co=monwealth Edison Conpany ATIN: Mr. Byron Lee, Jr.

Vice President P.O. Box 767 Chicago, IL 60690

.

Centlemen:

Thank you for your letter dated May 3, 1978, informing us of the steps you have taken to correct the noncompliance identified in our letter dated April 12, 1978. We will examine your corrective action during a future inspection.

Tour cooperation with us is appreciated.

Sincerely,

.

Caston Fiorelli, Chief

,

Reactor Operations and Nuclear Support Branch

!

cc:

Cordell Reed, Assistant Vice President

'

ec w/1tr dtd 5/3/78:

Mr. B. B. Stephenson, Station Superintendent i

Central Files Reproduction Unit NRC 20b

-

!

PDE

{

Local PDR NSIC TIC

.

Anthony Roissan, Esq.,

,

Attorney l

t

? D DQ DVDVtC l

RI_II_.

RUL.

R111 __

.. _HTTT 4.

O or ric. *

Shafer/

Barker h..

Knop h Fiorelli f

oo.....

h 6-19-78 6-19-78 _

6-19-78 6-19-78 oat = *

,,

,

!

NRC FORM 318 (p.76) NRCM 0240 Tr ua s.oovannuawy ensavine orrscs este-nwas

- _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

C mm:nwa Lidissn

.

.

,

,g One First Nabon..

a Chicago. Ilknois

/* Address Reply tg Post Othee Box 767

.i Chictgo. Ilhnois 60690

May 3, 1978 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission-799 Roosevelt Road Glen Ellyn, IL 60137 Subject:

Dresden Station Units 1, 2 and 3 Response to IE Inspection Report Nos. 50-10/78-10, 50-237/78-09 and 50-249/78-09 NRC Docket Nos. 50-10/237/249 Reference (a) :

G. Fiorelli letter to B.

Lee, Jr. dated April 12, 1978

Dear Mr. Keppler:

The following is in re.sponse to an inspection conducted by Messrs. W.

D.

Shafer and J. L.

Barker on March 2,3, 7, 8, 14-16, 22, 23, 27 and 28, 1978 of activities at Dresden Station.

Reference (a) indicated items that appeared to be in noncompliance with NRC requirements.

Our response is enclosed in the attach-ment to this letter.

Regarding the commitments relating to the modification program, approximately one dozen relatively old modifications were cancelled on March 31, 1978, after it was determined that all necessary records were on file for-these modifications and no physical work had actually begun on them.

Another four modifica-tions, for which some records were missing, were cancelled by April 7, 1978 after determining that no physical work had been performed.

Approximately twenty-five modifications, with few or no records available, remain to be reviewed to determine if any physical work has been initiated.

If any work has been performed, an additional review by the On-Site Review function will be made to determine that any necessary procedure or drawing changes are identified.

Although the schedule is tight, the station currently plans to complete this review by June 15, 1978.

l

/

'$73

'

..... -

kW m n Ph?+

. -

T Cemm nwaaith Edisnn NRC, 7ket Nos 50-10 50-237 50-249

Mr. James G. Keppler:

- 2-May 3, 1978 Please refer any additional questions you might have on this subject to this office.

Very truly yours,

)n.S. 6$

Cordell Reed Assistant Vice-President Attachment

.

,

e e

e

, _.

.,.

,.#,_

. _ _ _.

C:mmonwealth Edison NRC.

ket Nos. 50-10

.

'

50-237 ATTACHMENT 50-249

INFRACTION 10 CFR 50, Appendix B, Criterion 5 recuires that activities affecting cuality shall be prescribed by documented instructions, procedures, or drawings, and shall be accomplished in accordance with these instructions, procedures, or drawings.

The licensee's Quality Assurance Manual and Administrative Procedures (OP 14-51 and DAP 3-5) require out-of-service equipment to have affixed to it OOS cards.

DAP 7-2,

" Conducting of Operating Shif t Routine," recuires that at a minimum the items to be covered during a shift turnover include the status of the unit systems and problems encountered during the concluding shift and their solutions or the progress uade towards solving them.

,

Contrary to the above, the licensee failed to affix an out-of-service card to the gland seal leakoff drain pump for the Unit 2 HPCI system when that pump was taken out of service on March 22, 1978, and failed to turnover the status of the gland seal leakoff drain pump during the shift turnover between the m_dnig ht and day shifts.

DISCUSSION

.

At 0850 on March 22, 1978 an NRC inspector observed the HPCI Gland Seal Conde..ser (GSLO) Drain Pump control switch on panel 902-3 in the pull-to-lock position.

This pump is not re-quired for HPCI system operation, however, and the HPCI system remained operable.

The inspector questioned the NSO about the status of the pump.

The NSO was unautre that the pump switch was locked out, and he returned the cortrol switch to " auto".

A prompt investigation by the Shift Foreman, Ecuipment Attendant, and Ecuipment Operator revealed that t'he pump was inoperable but not out-of-service.

The pump was subsecuently taken out-of-service.

Later that day, the pump motor brushes were replaced and realigned, and the pump was returned to service.

During the investigation of this event, it could not be determined when the control switch was placed in pull-to-lock.

At 0425 on March 22, the HPCI system had been returned to service

'

following repair of a steam chest flange leak.

The necessary system operating surveillances had been completed and witnessed by an Equipment Operator, who was in training to become an NSO, and a Shift Foreman.

As recuired by the surveillance checklist, the GSLO pump had been operated and the control switch position

  • Commonwsalth Edison NRC L 2..at Nos. 50-10

-

'

-

50-237 2-50-249

-

had been witnessed in "off" at the completion of the tests.

The NSO may have inadvertently placed the control switch in pull-to-lock, however, upon completion of the surveillances.

Because the pump indicating lights remain " green" (normal) in pull to lock, as well as in off, and because no off-normal alarm annunciation would have been received, all three personnel monitoring the test could have failed to notice the actual position of the switch.

When in the pull-to-lock position, the control switch for this pump is parallel with the control panel, and it is possible to feil to notice the switch position is abnormal.

CORRECTIVE ACTION AND COFRECTIVE ACTION TO PREVENT RECURRENCE A shift supervisor's meeting was held on April 7, 1978.

During this meeting, it was emphasized that the Operating Department is responsible for the status of ecuipment at all times.

The shift supervisors were also instructed to follow the Out-of-Service Procedure vigorously and not to deviate from it.

Additional meetings will be held by June 15, 1978 with shift supervisors and with the Nuclear Station Operators to further emphasize the need for strong control of plant equipment.

The available methods for controlling the status of equipment will also be reviewed at the meetings.

DATE OF FULL COB".PLIANCE The station will be in full compliance by June 15, 1978.

On this date, the shift supervisors and Nuclear Station Operators meetings will be completed.

!

'

,