IR 05000282/1990009

From kanterella
Jump to navigation Jump to search
Partially Withheld Physical Security Insp Repts 50-282/90-09 & 50-306/90-09 on 900521-25 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Power Supply,Testing,Maint & Compensatory Measures & Security Program Audit
ML20055C837
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/14/1990
From: Belanger J, Creed J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20055C838 List:
References
50-282-90-09, 50-282-90-9, 50-306-90-09, 50-306-90-9, NUDOCS 9006250227
Download: ML20055C837 (1)


Text

,.e.

'

-

.

.

~"

U. S. NUCLEAR REGULATORY COMMISSION-

[

REGION III

Reports No. 50-282/90009(DRSS); 50-306/90009(ORSS)

-Licenses No. DPR-42; DPR-60

?

'

Licensee: Northern States Power Company 414.Nicollet Mall

3 Minneapolis, MN 55401 i

Facility Name:

Prairie Island Nuclear Generating Plant

'

.,

Inspection At:

Prairie Island Site, Red Wing, MN J

l Inspection Dates: May 21-25, 1990'

-

!

Inspector:

k 1 f M w i#t-b-/O-PC J. 'L. Belanger V

'Date Signed Senior Physical Security Inspector

!

fh

' App _ roved By:.

w A fmes R. Creed, Chief-Date Signed

,

Lsafeguards Section

!

-.

Inspection Summary

.;

Inspection on May 21-25, 1990-(Reports No. 50-282/90009(DRSS): 50-306/90009(DRSS))

!

Areas Inspected:

Routine, unannounced physical security inspection involving Power Supply; Testing, Maintenance and Compensatory Measures; Security Program

.

-Audit; Records and Reports; and review of previous inspection findings.

.!

.

Results: One' licensee identified violation regarding protecte'd area' screening.

'

requirements was noted. The violation is not being cited because the criteria

specified in Section V.G of the Enforcement Policy were satisfied.

Two l

previously identified items (50-282/89030-01; 50-306/89030-01 and j

50-282/89030-02; 50-306/89030-02) were reviewed and closed. One new open

item was identified regarding-the licensee's response to identified management-

, effe' tiveness deficiencies from a licensee requested independent review of the c

, security program.

The licensee's performance in the area of security maintenance was good. Work

-

'

reouests were completed in a timely manner. A preliminary review of the independent management effectiveness audit report which was conducted at the request of the licensee, disclosed deficiencies in several areas including j

security management organizational structure, program administration and operations, and training. The findings / recommendations for corrective actions

,

are under consideration by the licensee.

<

Attachment Contains (Details )

SAFEGUAOS INFORMATION

"

9006250227 900614 Upon Separation This j

,

PDR ADOCK 0500 Page is Dccontrolled-Q 3