Insp Repts 50-282/90-07 & 50-306/90-07 on 900423-27.No Violations or Deviations Noted.Major Areas Inspected: Licensee Const Plans & Procedures for Controlling Installation of Station Blackout/Electrical Sys Upgrade Mod
ML20042G346
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 05/07/1990
From: Gardner R, Neisler J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20042G343 List:
References
50-282-90-07, 50-282-90-7, 50-306-90-07, 50-306-90-7, NUDOCS 9005140127
Download: ML20042G346 (4)


Text

{{#Wiki_filter:' '; . .'

,' p .

,.

... U. S. NUCLEAR = REGULATORY COMMISSION , ,'

REGION III

. Reports ~.Ho.:;50-232/90007(DRS);50-306/90007(DRS) ,

A Docket Nos.: 50-282; 50-306 Licenses No.: DPR-42; DPR-60 t

Licensee: Northern States Power Company , 414 Nicollet Mall

f

Minnepolis, MN 55401 Facility Name
Prairie Island Nuclear Generating ~ Station-

Inspection At: Walch. MN.55089 Inspection Conducted: April 23 through 27, 1990 8' 2'[O Inspector.

. jsA -[.H'.Nisler~ Date , W . Approved:By: ' ' ["74D . . R..H. Gardner, Chief Date l Plant'. Systems Section - a

' Inspection--Summary- ' , inspection on Apr n 2S-27:, 1990 (Reports No. 50-282/90007(DRS); 50-306/90007(DRS)) .l Areas Inspected: Routine announced inspection to review and evaluate the

licensee's construction plans and procedures for controlling the installation .of-the: Station Blackout / Electrical System Upgrak Modification-(37700)(SIMS USIA44).

Results:. No violations or deviations'were identified. The licensee's ! , -construction plans and procedures that have been completed or are in~ development appear to be adequate to assure that quality req 1irements for the Station-Blackout Modification are established and properly implemented.

, -,

<;.

te i i . 900514a127 900508 {DR A1.OCK0500g2

, , c # , k d N_ _ _.u - ' \\

. ' F n, i

,

- _, ., [, # p , (. ~ 'OETAILS- .- I ' li . Persons = Contacted f, '1.

Ngrthern States Power Company (NSP) [ % G. Goering,; General Superintendent, Construction A

  • J. Maki,; Project Engineer

- i J.' Byrstrzycki, Project Superintendent, Quality. Control

  • C, Crosby, Nuclear Projects Quality A surance

i*R.. Sitek, Nuclear Projects Quality. L.5urance ~

  • B. Desai, Senior Mechanical Engineer-

.,

  • R. - 0' Bryan,- Project Superintendent

_l

  • T..Winberg, Civil Construction' Superintendent

!

  • L. 'Ganzer, Nuclear Operations. Quality Assurance
  • A. Rothstein,; Quality Control. inspector, Receiving _

g W. Chaney', Civil Inspector- , r i Huclear Regulatory Commission- (NRC) - P. Hartmann, Senior Resident. Inspector j I

  • Denotes.those persons-attending the exit interview on April 27, 1990

~ L 2.

Review of' Design Requirements and Construction Plans for the Station.- Blackout / Electrical Systems Upgrade (SB0/ESU) Modification - a.

-Theilicensee.has developed design requirements, construction procedures . and quality. verification procedures-for earth work and baskfill.- "

Specification HI AW1024000-59-S901,." Site-Preparation and arthwork" y ~ ' delineates requirements for excavation and backfill activities . .

including compaction and density criteria for backfill. The inspector m

P P observed backfillLactivities and qualityiverification of thase: ' activities... Quality control inspectors-were performing compaction .. - tests (Procter). and density measurements ~(sand cone)'.as required. by

)

procedure's.- Test results met or exceeded requirements'for-compaction and density in the backfill that had been tested and accepted by the ' quality contro11 department.

  • b.

The inspector reviewed ~ concrete mixing and placement procedures.-and specif. cations. The specifications included cement' content, water-cement ratio, aggregate size and gradation, and 28-day i compression strengths.

Procedures for performing slump tests, grout.

j cube tests, air content tests,-test cylinder curing and. compression tests have been developed and will be implemented upon-commencement

of' concrete work-activities.

The specifications and procedures meet.

J-the requirements of the appropriate American Concrete Institute .: -(ACl), American Society for Testing and Materials-(ASTM), and the ' A;my Corps-of Engineers standards and recommended practices.

J + I:

' y i , h ' , , _ _ , . --.

y . - -- . .. c . > r 4 ' m ".;g.' -4 g - --

., w t Concrete reinforcement is to be' ASTM A615 Grade 60 billet steel !' deformed bars (rebar) sized to conform to concrete mass and structural requirements.

The inspector observed partial shipments . of rebar at the-job site.

Bars were clean, stored on dunnage and protected from damage by construction activities.

The bars were { shop bentLand identified as to size and their location within the~ - ! structure.

3.

Revi'ew of Quality Assurance / Quality Control Requirements, Procedures, . ond Work Instructions for the SB0/ESU Modification [ a.

The inspector reviewed procedures and work instructions-to determine whether the applicable codes, standards.and regulations were being . included in. design documents and procedures. Design documents, work instructions-.and procedures either incorporated or. referenced the applicable codes,. standards and regulations for structural, mechanical,= , electrical and quality activities.

b.

The-inspector reviewed inspection requirements for structural concrete

' and rebar. -Procedures have been developed for inspection of construction activities by the -Quality Contrd Department.. Procedures l

' include concrete inspection and te; ting in G ding slump, grout'- strength, concrete strength, air entrainment, oggregate and water , quality. The licensee's plans for controlling concrete activities. ' include quality inspectors at the Siteil plant av! the placement site when concrete mixing and placement is being performed.

The licensee has developed rebar installation _ and cadwelding procedures.

Inspection will be performed to assure the adequacy of ' the Cadwelds and tests of Cadweld splices will'be performed as stated-in the following schedule:. One of the first ten production splices;

. One production and three sister splices of the next 90 splices;- , and One production and two sister splices of the next and .

subsequent units of 100 splices.

The procedure requires at least one-fourth of all splices tested - to be production splices. Acceptance criteria for Cadweld splice tests is 90,000 pounds / square inch minimum average with a minimum single splice of 75,000 pounds / square inct ust result, c.

The inspector reviewed two Quality Assurance Department surveillance reports of activities relative to the SB0/ESV modification. The two . reports were* (1) SR-PI-3396 - Engineering Change Repor+s (ECR) Review. This-surveillance report documented the quality assurance review of J the SB0/ESU engineering change program.

s t j ,

, . , )',, )

y ,r- -- {-{M}ky ; g ~ Q: n "f.!g.

.(2)c SR-PI-3419 05/D6 Building-Construction Activities. This= . report included quality assurance observations of, activities- ,. 7 ~, by construction contractors'on the SB0/ESU project.

-4.

Observation of Ongoing Work " t .The inspectorLobserved subgrade compaction and preparation prior to t installation of the mud-mat for base slabs elevations 687 and 695....Tho ' licensee ls' civil: quality inspectors performed compaction and density tests- , , on the prepared and compacted subgrades prior to-the mud mat placement.

During the mud mat placement, the licensee -used the nonsafety-related mud: y mat concrete' placement to test and' improve quality inspection techni_ ques.;

-

The' quality. inspectors performed concrete slump tests, air entrainment- ' tests and: prepared compression: strength cylinders from each elevation placement.' The: inspector toured the' ons'ite test facility.. The test facility appeared: ' to be'adequetely equipped to perform the onsite portion of the test program,The licensee is also using the services.of'an offsite test n

  • ,.

laboratory to perform tests that require specialized equipment not-available in the onsite facility.

- l 15.

Exit Interview- ~ The' inspector met with licensee representatives (denoted in: Paragraph 1):. at the conclusion of the inspection and summarized the/scopeLand findings .ofLthe inspection..;The inspector discussed the likely informational.. a content of the: inspection report with' regard to~ documents or processes ~-

reviewed by the inspectors during the-inspection.. The licensee did:not . identify.any..such documents or processes as proprietary, s.