IR 05000282/1981006

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-282/81-06 & 50-306/81-07 on 810316-20. Noncompliance Noted:Proper Personnel Screening Not Conducted in Accordance W/Security Plan Commitment.Details Withheld (Ref 10CFR2.790)
ML19345H171
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 04/15/1981
From: Creed J, Madeda T, Pirtle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19345H169 List:
References
50-282-81-06, 50-282-81-6, 50-306-81-07, 50-306-81-7, NUDOCS 8105010152
Download: ML19345H171 (2)


Text

r

.

l

.

f"NU U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

.

REGION III

Reports No. 50-282/81-06; 50-306/81-07 Docket No. 50-282 License No. DPR-42 Safeguards Group IV Docket No. 50-306 License No. DPR-60 Licensee:

Northern States Power Company 414 Nicollet Hall Minneapolis, MN 55401 Faci?3ty Name:

Prairie Island Units 1 and 2 Inspection At:

Prairie Island Site, Red Wing, MN NSP Corporate Office, Minneapolis, MN Inspection Conducted: March 16-20, 1981 Date of Last Physical Security Inspection: October 20-24, 1980 Type of Inspectioru Unannounced Physical Protection Inspectors:

_%_ $bkD %

L{[p(b&$1 G. L. PiWie Date Physical Security Specialist 3 _ %.hdd9o 4/NI19%

p T. J da Date Physical Security Specialist

!d h%

L///f~/8/

Approved By:

J. R. Creed, Acting Chief Date Safeguards Section l

Inspection Summary Inspection on March 16-20, 1981 (Reports No. 50-282/81-06; 50-306/81-07)

Areas Inspected:

Included a review of Security Plan; Security Organization; Protected Area Physical Barriers; Vital Area Physical Barriers; Lighting, Access Control (Identification, Authorization and Badging); Access Control (Search); Access Control (Escorting); Access Control (Vital Areas); Detection Aids; Assessment Aids; Compensatory Measures; Locks, Keys, and Combinations; Records and Reports; Followup on Previous Items of Noncompliance; Followup on Unresolved Items; and Independent Inspection Effort. The inspection involved i

O 8105010

- _ _ _ _ _ _ _ - _ - _ _ - _ - _ - _ _ _ _ - - - _ - - - _ _ - - _ _ _.

.

.

80 inspector-hours onsite by two NRC inspectors. The inspection began during the day shift period; 14 inspection-hours were accomplished during offshift periods.

Results: The licensee was found to be in compliance with NRC requirements within the areas examined during this inspection except for the following two items:

1.

Access Control (Identification, Authorization, and Badging) - The licensee failed to conduct proper personnel screening in accordance with a security plan commitment.

(Severity Level V)

2.

Acccas Control (Vital Areas) - The licensee failed to properly control access between adjacent vital area.

(Severity Level V)

All previous security related items of noncompliance were considered closed.

One unresolved item was identified.

(Details 2.790(d) Information)

,

.

-2-

. - -..-