Security Baseline Inspection Report 05000275/2024405 and 05000323/2024405
ML24348A121
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/13/2024
From: Jesse Rollins
NRC/RGN-IV/DRSS/PSB
To: Gerfen P
Pacific Gas & Electric Co
References
IR 2024405
Download: ML24348A121 (6)


Text

December 13, 2024

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000275/2024405 AND 05000323/2024405

Dear Paula Gerfen:

On December 5, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Power Plant, Units 1 and 2 and discussed the results of this inspection with Jordan Tyman, Director of Nuclear Projects, and other members of your staff.

The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jesse M. Rollins, Chief Physical Security Branch Division of Radiological Safety & Security Docket Nos. 05000275 and 05000323 License Nos. DPR-80 and DPR-82

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000275 and 05000323

License Numbers:

DPR-80 and DPR-82

Report Numbers:

05000275/2024405 and 05000323/2024405

Enterprise Identifier:

I-2024-405-0005

Licensee:

Pacific Gas and Electric Company

Facility:

Diablo Canyon Power Plant, Units 1 and 2

Location:

Avila Beach, CA

Inspection Dates:

December 04, 2024, to December 05, 2024

Inspectors:

C. Jewett, Sr Physical Security Inspector

Approved By:

Jesse M. Rollins, Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Diablo Canyon Power Plant, Units and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.14 - Review of Power Reactor Target Sets

The inspector evaluated the Security Target Set Program. The following elements were evaluated:

Review of Power Reactor Target Sets

(1)

  • All Requirements (03.01 - 03.05)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

  • On December 5, 2024, the inspector presented the security baseline inspection results to Jordan Tyman, Director of Nuclear Projects, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

51166703;

51166704;

51178503

Diablo Canyon Target Sets

DCPP Target Set Basis Document

NRC Security Baseline Inspection Readiness Assessment

Checklist, IP 71130.14

03/27/2024

AWP SP-007

Critical Digital Asset Determination

CT08EQRFR

Security Plant Equipment Refresher

Miscellaneous

NNIPRC001607

Introduction to Abnormal Operating Procedures (AOPs)

09/01/2022

71130.14

Procedures

20DP-0SK51

Target set Development

07