Forwards Insp Repts 50-275/95-02 & 50-323/95-02 on 950108- 0218 & NOV
ML16342C894
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/17/1995
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342C895 List:
References
NUDOCS 9504210274
Download: ML16342C894 (12)


Text

{{#Wiki_filter:UNITEDSTATES NUCLEAR RfGULATORYCOMMISSION R EOION IV 611 RYAN PI.AZA DRIVE, SUITE 400 ARI.INOTDN.TEXAS 16011 606'PR l T l995 Pacific Gas and Electric Company Nuclear Power Generation, B14A ATTN: Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit 77 Beale Stre~et.

Room 145l P.O.

Box 770000 San Francisco, California 94177 SUBJECT: NRC INSPFCTION REPORT 50-275/95-02: 50-323/95-02 ANO NOTICE Of VIOLAIION This refers to the inspection conducted by M. Miller, and the inspectors identified in the enclosed report, of this office on January 8 through February 18.

1995.

The inspection included a review of activities authorized for your Diablo Canyon Nuclear Power Plant, Units I and 2. facility.

At the conclusion of the inspection.

the findings were discussed with those members of your staff identified-in the enclosed report.

Areas examined during the inspection are identified in the report.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.

The purpose of the inspection was to determine whether activities authorized by the license were conducted safely and in accordance with NRC requirements.

Based on the results of this inspection, certain licensed activities appeared to be in violation of NRC requirements, as speci fied in the enclosed Notice of Violation (Notice).

The violation is of concern because it involved the failure to comply with a procedure for operation of the reactor trip bypass breakers that required concurrert performance verification.

Although we acknowledge that the actions taken by the operators accomplished the intent of the procedure to rack out the breaker, the violation is being cited because of our concern that operators not work around procedure requirements.

We are concerned that your recent action's taken to improve performance in the area of procedure compliance have not been fully effective and urge you to assure that your expectations for performance tn these areas are clearly communicated, understood, and implemented by all of your staff.

Your actions to identify and evaluate the improper electrical separation of the solid state protection system (SSPS) input circuits from engineered safety feature power supplies demonstrated a high level nf safety sensitivity and focused the industry's attention on the potential safety significance of this issue.

Your prompt communication to the NRC, subsequent request for enforcement discretion, and corrective actions were al'.o performed in an 9504210274 950417 PDR ADOCK 05000275 Q PDR

Pacific Gas and El< ctric Company-2-exemplary manner.

An unresolved item was identified on this issue pending NRC determination of the appropriate action tu be taken for the root cause of the SSPS problem.

You are required to respond to this letter and should fo11ow the instructions specified in the enclosed Notice when preparing your response.

In your response, you should <Iucument the specific actions taken and any additional actions you plan to prev< nt recurrence.

Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the rs quired response.

After reviewing your response to this Notice, including your proposed corrective actions and the results of future inspections.

the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulatory requirements.

In accordance with

CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its enclosure(s), and your response will be placed in the NRC Public Document Room (PDR).

To the extent possible.

your response should not include any persona! privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction.

However, if you find it necessary to include such information.

you should clearly indicate the specific information that you desire not to be placed in the PDR, and provide the legal basis 'o support your request for withholding the information from the public.

The responses directed by this letter and the enclosed Notice are not.subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub.

L. No. 96.511.

Should you have any questions concerning this inspection, we wi11 be pleased to discuss them with you.

Sincerely, A. Bi 1 Beach, Director Division of Reactor Projects Oockets: 50-275 50-323 Licenses: DPR-80 DPR-82 Enclosures: I.

Notice of Violation 2.

NRC Inspection Report 50-275 '95-02: 50-323/95-02

Pacific Gas and Electric Company j I cc w/enclosures: Sierra Club California ATTN; Or. Richard Ferguson Energy Chair 6715 Rocky Canyon Creston, California 93432 San Luis Obispo Hothers for Peace ATTN: Hs.

Nancy Culver P.O.

Box 164 Pismo Beach. California 93448 Ms. Jacquelyn C. Wheeler P.O.

Box 164 Pismo Beact, Calif'ornia 93448 The County Telegram Tribune ATTN: Managing Editor 1321 Johnson Avenue P.O.

Box 112 San Luis Obispo. California 93406 San Luis Obispo County Board of Supervisors ATTN: Chairman Room 370 County Government Center San Luis Obispo, California 93408 California Public Utilities Coaeission ATTN: Hr.

Truman BurnsiHr. Robert Kinosian 505 Van Ness, Rm.

4102 San Francisco.

California 94102 Diablo Canyon independent Safety Committee Attn: Robert R. Wellington.

Esq.

Legal Counsel 857 Cass Street.

Suite D Monterey, California 93940 Radiologic Health Branch State Department of Health Services ATTN: Hr. Steve Hsu P:0.

Box 942732 Sacramento.

California 94234

~ II ~ ' gojC<' i" Paci fic Gas and El ectr i c CompanY ,\\ State of California ATTN: Hr. Peter H. Kaufman Deputy Attorney General 110 West A Street, Suite 700 San Diego, California 92101-4-a Pacific Gas and Electric Company ATTN: Christopher J.

Warner, Esq.

P.O.

Box 7442 San Francisco, California 94120 Diablo Canyon Nuclear Power Plant ATTN: Warren H. Fujimoto, Vice President and Plant Hanager P.O.

Box 56 Avila Beach, California 93424

APR t 7 t995 Resident Inspector HIS System B. Henderson (PAO, MCFO) RIY File Branch Chief (ORP/TSS) """~P"FPN >>a ler 0>> 0'8 ,vr t '. Cg

gg@ 'g+ 4+4w ~ ~ ~ . ~~ '>-',",. Pacific Gas and Electric Company v ~ P%r":." E-iiail report to D. Sullivan (DJS) E-Hail report to NRR Event Tracking System ( IPAS) >>>>v Q ~ 4>>: ggte:Ss'<Ao>>: i I bcc distrib.

by RIV: L. J. Callan f:"-.; - DRSS-F IPB Kg.'.. Branch Chief (ORP/E, MCFO) Senior Project Inspector (DRP/E, MCFO) Leah Tremper (OC/LFOCB, HS: TWFN 9EIO) a >> i A DOCUHENT NAHE: R:~ dc',dc502rp.mam To reoelve oosay ot doctxnent. indicate in box: C e Copy without en osu es E ~ Copy with enciosures N ~ No copy RIV:SRI: E HHHiller /95 RIV:RI:ORP RVAzua / /95 C: DRPii, DFKirsch +/ /95 C:MCFO KEPerk' /95 0:ORP ABBeach //7/95 ( Qa C3

e I

0'1 > J V ,.'{{,'~~{ i {{ gj <<g>~"W'"'-",>>',.t'"'Pacific Gas =nd Electric Company ~ I ~ E-Mail report to D. Sullivan (OJS) E-Hail report to NRR Event Tracking Sys ~i';lL'j".

. bcc to DHB (IE01) bcc distrib. by RIV: a+ <<lr"' t" -5-APR I 7 l995 tern (IPAS) L. J. Callan Resident Inspector DRSS-F IPB HIS System Branch Chief (DRP/E, WCFO) B. Henderson (PAO, WCFO) Senior Pro)ect Inspe tor (ORP/E, WCFO) RIV File Leah Tremper (OC/LFOCB, HS: TWFN 9E10) Branch Chief (ORP/TSS) DOCUMENT NAME: R:g dcgdc502rp.mam TO teoeiVeccpy Ot dOCument, Indicate inbOX: C ~ COpy{Nithcut en OSu eS "e Ccpy With enCIOSureS "N" e NO COpy ~ g RIV:SRI: HHHiller /95 RI V'I:ORP RVAzua / /95 C:ORP) OFKirsch +/ /95 C:WCFO K Perk' /95 D:DRP ABBeach //7/95 }}