Text
PRIORIT'Y Z REGULATORYINfNNRKV56NE558'ItRtMQTIONSYSTEM (RIDS)
ACCESSION NBR:9505030049 DOC.DATE: 95/04/28 NOTARIZED: NO DOCKET ACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION BEACHEA.B.
Region 4 (Post 820201)
RECIP.NAME RECIPIENT'"'FFILIATION RUEGEREG.M.
Pacific.Gas
& Electric Co.
SUBJECT:
Forwards insp repts 50-275/95-06 6 50-323/95-06 on 950219-0401
& NOV.Violation of concern because it demonstrate lack of sensitivity by staff to procedural compliance.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES:
P RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS AEOD/SPD/RAB ALOD/TT-
~FILE CENTER KP/
B NUDOCS-ABSTRACT t
OGC/HDS3 EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL
1
2
1
1
1
1
1
1
1
1 RECIPIENT ID CODE/NAME MILLERISM AEOD/DEIB AEOD/SPD/RRAB DEDRO NRR/DISP/PIPB NRR/DRCH/HHFB OE DIR RGN4 FILE
NOAC COPIES LTTR ENCL
1
1
1
1
1
1
1
1
1 D
0, U
VOTE TO ALL"RIDS" RECIPIE>iTS:.
PLEASE HELP US TO REDUCE iVASTE!COYTACTTHE DOCL'WIEiTCOi'TROL DESk. ROOM P1.37 (EXT. 504-20S3
) TO ELIMINATE)'OL'R NA5 IL I'ROTI
~
~
DIS'I'RIIII I'IOY LISTS FOR DOCUMENTS YOL'Oi "I'
EED.
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
~
~P,Q RQQI C~
'~Ip
.-p 0 rak~
>>>>**<<
UNITED STATES NUCLEAR R EG ULATORYCOMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011.8064 APR 28 l995 Pacific Gas and Electric Company Nuclear Power Generation, B14A ATTN:
Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit 77 Beale Street, Room 1451 P.O.
Box 770000 San Francisco, California 94177 SUBJECT:
NRC INSPECTION REPORT 50-275/95-06; 50-323/95-06 AND NOTICE OF VIOLATION This refers to the'inspection conducted by M. Tschiltz and the inspectors identified in the enclosed report, of this office on February 19 through April 1, 1995.
The inspection included a review of activities authorized for your Diablo Canyon Nuclear Power Plant, Units
and 2, facility.
At the conclusion of the inspection, the findings were discussed with you and those members of your staff identified in the enclosed report.
You are to be commended on your prompt and effective actions in response to the severe storm conditions which, on March 9, 1995, caused closure to all roads leading to and from the Diablo Canyon site.
These actions, which are detailed in the enclosed inspection report, demonstrated your high regard for safety.
During this inspection a violation of NRC requirements was identified.
It involved several examples of failures to comply with procedural requirements.
These examples occurred as a result of the lack of appropriate sensitivity, by certain members of your staff, to procedural compliance.
Two of the examples occurred during direct involvement of engineering in support of testing Safety Injection Pump 2-2.
Another example involved incorrect restoration of a system after testing.
These examples were either identified by NRC inspector observations or were self-evident.
We have brought to your attention issues of procedural compliance in past inspection reports and the latest Systematic Assessment of Licensee Performance report.
We encourage you to assure that your expectations for performance in these areas are clearly communicated, understood, and implemented by all of your staff.
Areas examined during the inspection are identified in the report.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and obse. vation of activities in progress.
The results of this inspection are documented in the enclosed report.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
9505030049 950428 PDR
- DOCK 05000275
PDR i8'
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, Dockets:
50-275 50-323 Licenses:
DPR-80 DPR-82 A. Bill Beach, Director Division of Reactor Projects Enclosure:
1.
NRC Inspection Report 50-275/95-06; 50-323/95-06 cc w/enclosure:
Sierra Club California ATTN:
Dr. Richard Ferguson Energy Chair 6715 Rocky Canyon Creston, California 93432 San Luis Obispo Mothers for Peace ATTN:
Ms. Nancy Culver P.O.
Box 164 Pismo Beach, California 93448 Ms. Jacquelyn C. Wheeler P.O.
Box 164 Pismo Beach, California 93448 The County Telegram Tribune ATTN:
Managing Editor 1321 Johnson Avenue P.O.
Box 112 San Luis Obispo, California 93406
Pacific Gas and Electric Company San Luis Obispo County Board of Supervisors ATTN:
Chairman Room 370 County Government Center San Luis Obispo, California 93408 California Public Utilities Commission ATTN:
Mr. Truman Burns)Mr. Robert Kinosian 505 Van Ness, Rm.
4102 San Francisco, California 94102 Diablo Canyon Independent Safety Committee ATTN:
Robert R, Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D
Monterey, California 93940 Radiologic Health Branch State Department of Health Services ATTN:
Mr. Steve Hsu P.O.
Box 942732 Sacramento, California 94234 State of California ATTN:
Mr. Peter H. Kaufman Deputy Attorney General 110 West A Street, Suite 700 San Diego, California 92101 Pacific Gas and Electric Company ATTN:
Christopher J.
Warner, Esq.
P.O.
Box 7442 San Francisco, California 94120 Diablo Canyon Nuclear Power Plant ATTN:
Warren H. Fujimoto, Vice President and Plant Manager P.O.
Box 56 Avila Beach, California 93424
Pacific Gas and Electric Company APR 28 l995 E-Mail report to D. Sullivan (DJS)
E-Mail report to NRR Event Tracking System (IPAS)
bcc to DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan DRSS-FIPB Branch Chief (DRP/E, WCFO)
RIV Fi1 e Leah Tremper (OC/LFDCB, MS:
TWFN 9E10)
Resident Inspector MIS System Sr Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
B. Henderson (PAO, WCFO)
k i
DOCUMENT NAME:
r:g dcgdc506rp.mdt RIV:SRI: DRP MDTschiltz 04~/95 RIV:RI:D MFRunyan 04/
C:DRPiE DDChamber ain 04/Z4./95
CO C:WCF KEPe 04/Z /95 RP A
each 04+5 /95
Pacific Gas and Electric Company APR 28 1995 E-Hail report to O. Sullivan (DJS)
E-Hail report to NRR Event Tracking System (IPAS)
bcc to DMB (IEOI)
bcc distrib.
by RIV:
L. J. Callan DRSS-FIPB Branch Chief (DRP/E, WCFO)
RIV File Leah Tremper (OC/LFOCB, HS TWFN 9E10)
Resident Inspector HIS System Sr Project Inspector (ORP/E, WCFO)
Branch Chief (ORP/TSS)
B. Henderson (PAO, WCFO)
i DOCUMENT NAME:
r:g dcgdc506rp.mdt RIV: SR I:DRP HDTschiltz RIV:RI:D MFRunyan C:ORPOLE ODChamber ain C:WCF KEPe RP A
each 04/~/95 04/
04/g$ /95 CO CO Y
04/Z5/95 04jg /95