IE Insp Rept 50-271/80-21 on 801130 & 1201-05.Noncompliance Noted:Failure of Security Force Member to Receive Annual Physical Exam & of Annunciator Panel to Show Status of Stand by Power Source.Details Withheld (Ref 10CFR2.790)
ML19346A090
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/12/1981
From: Devlin J, Ladun R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19346A079 List:
References
50-271-80-21, NUDOCS 8106050058
Download: ML19346A090 (1)


Text

.

U.-S.

NUCLEAR REGULATORY COMMISSION

,,

  • '.

OFFICE OF INSPECTION AND ENFORCEMENT

REGION I

Report No.

50-271/80-21

-

,

Docket No.

50-271 License No.

DPR-28 Safeguards Group IV Licensee:

Vermont Yankee Nuclear Power Corporation 20TurnpijeRoad-Westborough, Massachusetts 01581 Facility Name:

Vermont Yankee Nuclear Power Station Inspection At:

Vernon, Vermont Inspection Conducted: November 30 and December 1-5, 1980 Date of Last Physical Security Inspection Visit: July 28-31 and August 2, 1980 Type of Inspection:

R'ut'ine, Unannoun~ced, Physical Securiky o

Inspectors:

[ /7.,

<2&)

_

A:P/ar/80 R: H'.' Ladun, Physical Security Inspector

' date date

-

/

date Approved b

//A4

&

///1/N J: WVDevlin, Chief, Security Section

' dats

'

afepuardsBranch Inspection Summafy:

Inspection conducted November 30 and December 1-5, 1980 (Report No. 50-271/80-21)

Areas Inspected:

Security Plan; Security Program Audit; Security Organization; Physical Barriers (Protected Areas); Physical Barriers (Vital Areas); Lighting; Access Controls (identification, Authorization and Badging); Access Control (Search);

Access Control (Esecrting); Access Control (Vital Areas); Alarm Stations; Detection Aids, Assessment Aids; Communications, Testing and Maintenance; Compensatory Measures; t

!

Power Supply; Response; Locks, Keys and Combinations; and Records and Reports.

Licensee action on previously identified items of noncompliance related to physical

security. The inspection involved forty seven (47) inspector-hours onsite by one l

Regional based NRC inspector.

The inspection wi degun during a Sunday; ten (10)

'

inspector-heurs were accomplished during offshift periods.

Results: The licensee was found to be in compliance with NRC requirements within the twenty (20) areas examined except; for the following two items:

Security Organi-zation - Failure of a member of the security force to receive his annual physical l

examination (Severity Level V violation) and Alarm Stations - Failure of annunciator panel to indicate status of standby power source (Severity Level V violation).