Nr
UNITED STATES
()rf
-%
NUCLEAR REGULATORY COMMISSION
l
.
j
j
REGION I
e
g
631 PARK AVENUE
.14 JAN 1981
D
%,
. $[
KING OF PRUS$t A, PENN SYL.V ANI A 1940s
- .,*
,
Docket No. 50-271
Vermont Yankee Nuclear Power Corporation
ATTN:
Mr. Robert L. Smith
Licensing Engineer
25 Research Drive
Westborough, Massachusetts 01581
Gentlemen:
Subject:
Inspection 50-271/80-21
This refers to the routine inspection conducted by Mr. R. H. Ladun of this
office on November 30, 1980 and December 1-5, 1980 at the Vermont Yankee Nuclear
Power Plant, Vernon, Vermont of activities authorized by NRC License No. DPR-28
and to the discussions of our findings held by Mr. Ladun with Mr. W. A. Murphy
and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Our inspector also verified the steps you have taken to correct the items of
noncompliance brought to your attention in the enclosure to our letter dated
September 9, 1980. We have no further questions regarding the steps you took to
correct items 2, 3, 5 and 6.
With regard to items 1 and 4, these have been
withdrawn as the result of additional information provided by you in corres-
pondence dated October 3, 1980.
It was determined that item 7 is in the process
of being corrected, consequently it will be reviewed at a later date.
~
13ased on the results of this inspection, it appears that certain of your activities
were not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
These items of noncom-
pliance have been categorized into the levels descri. bed in the Federal Register
Notice (45 FR 66754) dated October 7, 1980.
,
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, documentation of findings of your control
.
and accounting procedures for safeguarding special nuclear materials and your
facility security measures for physical protection are deemed to be commercial
or financial information within the meaning of 10 CFR 9.5(a)(4) and shall be
subject to disclosure only in accordance with the provisions of 10 CFR 9.12;
.
8106050 W
..
.
.
.
. .
.
.
- - -
,
.
. . .
s
-
Vermont Yankee Nuclear Power
Corporation
2
14 JAN 1981
therefore, the enclosures to this letter, and your response to this letter will
i
not be placed in the Public Document Room and will receive limited distribution.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
I
Walter G. Martin, Chief
.
Safeguards Branch
Enclosures:
1.
Appendix A, Notice of Violation (Contains 2.790(d) Info)
2.
Office of Inspection and Enforcement Inspection
<
Report Number 50-271/80-21 (Contains 2.790(d) Info)
cc:
Mr. Warren P. Murphy, Plant Superintendent (w/o cy of encls)
Mr. W. F. Conway, Vice President and Manager of Operations (w cy of encis)
>
K. Kniskern, Mat ager of Security (w cy of encis)
J. E. Griffin, tresident (w/o cy of encls)
L. H. Heider, Vice President (w/o cy of encis)
!
!
.