Discusses Insp Repts 50-269/72-05 & 50-270/72-04 on 720516-19.No Noncompliance Noted.Major Areas Inspected:Steam Generator Repair Procedures & Review of Operating Logs of Unit 1 & Unit 2 Main Steam Piping Nondestructive Tests
ML19322A751
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/21/1972
From: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thies A
DUKE POWER CO.
Shared Package
ML19322A740 List:
References
NUDOCS 7911210777
Download: ML19322A751 (2)


Text

y-

,

. - - -.

..

O

.

.

.

.

..

l TD6'

(N t

tirJITED STATES

.

ATOMIC ENERGY COMMISSION f;jy-

,

r.

""w '" " "XO:X

'

r rt,;

a - M * E 2* 9 2 30 P E AC * 6+ E E 7 R E E T. *4W ? M * E S T gggg,,,,g.

4Cai 528 49C3

,,,,n,

A u.

t 4. cE eno. A xm DIRf:TORATE OF REGULATORY OPERATIONS i

In Reply Refer To:

June 21, 1972 RO:II:CEM 50-269/72-5

'

.,

50-270/72 4

-

Duke Power Company Attn: Mr. A. C. Thies, Senior Vice President Production and Transmission Pcwer Building h2? South Church Street Chtriotte, North Carolina 28201 Gent.'emen:

This refers to the inspection conducted by Mr. Murphy of this office on May 16-19, 1972, of activities authorized by AEC Construction Fermit Nos.

.

I CPPR-33 and 34, and to the discussions of our findings held by Mr. Murphy with Mr. Smith and other members of your staff at the conclusion of the inspection.

Areas examined during tl..s inspection included a review of the procedures to be used in the repair of the Unit 1 steam generators, a review of the Unit 1 operating logs and document control and a review of the nondestruc-tive test records for the Unit 2 main steam piping. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with plant personnel and observations by the inspector.

Within the scope of the inspection, no items of noncompliance were observed.

-

Concerning our review of the Babcock and Wilcox Construction Company's (B&W) procedures for the repair of the reactor coolant system components, it is our understanding that B&W will develop a procedure for the control of small parts and tools used in the repair of the steam generators. It is also our understanding that members of your staff vill audit the B&W quality assurance program for repair and modification of the reactor coolant syatem componenta.

Regarding the review of the plant operating records, our inspector discussed with your site staff, areas in which the shift supervisor's log could be improved. It is ouz understanding that the requirements for this log vill x

be revised as a result of this discussion. It is also our understanding

7e u alas 777

_ _ _...

-,

,.

..

.

.

O

'

l l

Duke Power Ccmpany-2-June 21, 1972

.

that the procedure for the work order system vill be revised to provide that r quirements for retesting be indicated on the work order.

Concen '.ng our review of the records for the main steam piping, our in-

-

spector determined ' hat the velding isometric drawings were not controlled

>

by the Oconee drawing control procedure.

It is our understanding that the document control procedure vill be extended to cover these drawings.

A reply to this letter is not necessary. Should you have any questiens concerning the n:stters discussed in this letter, however, we vill be glad to discuss them with you.

J ferytrulyyours, NY

"

ohnG]. Davis l

hirector i