MONTHYEAR05000265/LER-2024-002-01, Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure2024-10-30030 October 2024 Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure SVP-24-065, Offsite Dose Calculation Manual (ODCM) Section 12.2.2 Radioactive Gaseous Effluent Monitoring Instrumentation Report Main Chimney High Range Noble Gas Monitor2024-10-29029 October 2024 Offsite Dose Calculation Manual (ODCM) Section 12.2.2 Radioactive Gaseous Effluent Monitoring Instrumentation Report Main Chimney High Range Noble Gas Monitor IR 05000254/20240102024-10-28028 October 2024 Age Related Degradation Inspection Report 05000254/2024010 and 05000265/2024010 and Notice of Violation RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests SVP-24-059, Correction to Registration of Use of Casks to Store Spent Fuel2024-10-0404 October 2024 Correction to Registration of Use of Casks to Store Spent Fuel ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24247A1642024-09-30030 September 2024 Alternative Request RP-01 IR 05000254/20244022024-09-12012 September 2024 Material Control and Accounting Program Inspection Report 05000254/2024402 and 05000265/2024402 (Public) SVP-24-054, Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Top Guide Rim Welds2024-09-11011 September 2024 Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Top Guide Rim Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000254/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Quad Cities Nuclear Power Station (Report 05000254/2024005; 05000265/2024005) RS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval2024-08-20020 August 2024 Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval ML24183A1082024-08-0808 August 2024 – Issuance of Amendment Nos. 302 and 298 Adoption of Tstf-505, Provide Risk Informed Extended Completion Times – RITSTF Initiative 4b SVP-24-049, Owners Activity Report Submittal Sixth 10-Year Interval 2024 Refueling Outage Activities2024-08-0707 August 2024 Owners Activity Report Submittal Sixth 10-Year Interval 2024 Refueling Outage Activities IR 05000254/20243012024-08-0101 August 2024 NRC Initial License Examination Report 05000254/2024301; 05000265/2024301 SVP-24-048, Registration of Use of Casks to Store Spent Fuel2024-07-31031 July 2024 Registration of Use of Casks to Store Spent Fuel 05000265/LER-2024-002, Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure2024-07-22022 July 2024 Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions SVP-24-041, Regulatory Commitment Change Summary Report2024-07-0505 July 2024 Regulatory Commitment Change Summary Report SVP-24-043, Registration of Use of Casks to Store Spent Fuel2024-07-0505 July 2024 Registration of Use of Casks to Store Spent Fuel ML24162A0982024-07-0303 July 2024 – Issuance of Amendment Nos. 301 and 297 Adoption of 10 CFR 50.69 Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors SVP-24-040, Registration of Use of Casks to Store Spent Fuel2024-06-25025 June 2024 Registration of Use of Casks to Store Spent Fuel RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations SVP-24-039, Ile Post Exam Package Letter2024-06-12012 June 2024 Ile Post Exam Package Letter RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed ML24110A0492024-05-28028 May 2024 Audit Report Related to the TSTF-505 and 10 CFR 50.59 Amendments ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes ML24141A2102024-05-20020 May 2024 Operator Licensing Examination Approval - Quad Cities Nuclear Power Station, May 2024 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000254/20240012024-05-14014 May 2024 Integrated Inspection Report Nos. 05000254/2024001 and 05000265/2024001 SVP-24-034, Annual Radiological Environmental Operating Report2024-05-10010 May 2024 Annual Radiological Environmental Operating Report 05000265/LER-2024-001, Automatic Actuation of Reactor Protection System During Scram Discharge Volume Leak Rate Testing2024-05-10010 May 2024 Automatic Actuation of Reactor Protection System During Scram Discharge Volume Leak Rate Testing RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report ML24109A0662024-05-0202 May 2024 – Relief Request I5R-26, Revision 0 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests SVP-24-029, Radioactive Effluent Release Report for 20232024-04-26026 April 2024 Radioactive Effluent Release Report for 2023 SVP-24-028, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2024-04-26026 April 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report ML24114A1712024-04-23023 April 2024 State of Illinois (IEMA-OHS) Comment Quad Cities HI-STORM Exemption Environmental Assessment SVP-24-024, Corrected Radioactive Effluent Release Report for 20222024-04-0505 April 2024 Corrected Radioactive Effluent Release Report for 2022 RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion IR 05000254/20245012024-04-0505 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000254/2024501 and 05000265/2024501 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report SVP-24-023, Ile Outline Submittal Letter2024-03-29029 March 2024 Ile Outline Submittal Letter RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF2024-03-19019 March 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS2024-03-15015 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS ML23340A1552024-03-15015 March 2024 – Issuance of Amendment Nos. 299 and 295 Adoption of TSTF-564, Safety Limit MCPR SVP-24-018, Ile Proposed Exam Submittal Letter2024-03-13013 March 2024 Ile Proposed Exam Submittal Letter 2024-09-04
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000254/20183012018-10-26026 October 2018 NRC Initial License Examination Report 05000254/2018301; 05000265/2018301 (DRS-D.Reeser) ML16152A5032016-05-31031 May 2016 2016 Quad Cities Nuclear Power Station - Initial License Examination Report 2016301 IR 05000254/20143012014-06-18018 June 2014 Er 05000254/2014301; 05000265/2014301; 04/28/2014 - 05/5/2014; Quad Cities Nuclear Power Station, Units 1 and 2; Initial License Examination Report RS-14-164, (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-05-29029 May 2014 (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations IR 05000254/20113012011-07-25025 July 2011 Er 05000254-11-301(DRS), 05000265-11-301(DRS), on 05/31/2011-06/24/2011, Exelon Generation Company, LLC, Quad Cities Nuclear Power Station, Units 1 and 2, Initial License Examination Report IR 05000254/20093012010-01-19019 January 2010 Er 05000254-09-301(DRS); 05000265-09-301(DRS); 11/30/2009 - 12/14/2009; Exelon Generating Company, LLC, Quad Cities Station Initial License Examination Report ML0721204492007-07-26026 July 2007 License Examination Report 2007-301 IR 05000254/20023012003-02-0404 February 2003 Er 05000254-02-301(DRS), 05000265-02-301(DRS); Exelon Company; on 12/02-12/12/02; Quad Cities Nuclear Power Station. Initial License Examination Report RS-02-141, Revised Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations.2002-08-0707 August 2002 Revised Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations. 2018-10-26
[Table view] |
Text
ary 19, 2010
SUBJECT:
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 NRC INITIAL LICENSE EXAMINATION REPORT 05000254/2009301(DRS); 05000265/2009301(DRS)
Dear Mr. Pardee:
On December 18, 2009, the U. S. Nuclear Regulatory Commission (NRC) examiners completed initial operator licensing examinations at your Quad Cities Nuclear Power Station. The enclosed report documents the results of the examination which were discussed at the exit meeting on December 11, 2009, with Mr. Karl Moser and other members of your staff.
The NRC examiners administered an initial license examination operating test during the weeks of November 30 and December 7, 2009. The written examination was administered by Quad Cities Nuclear Power Plant training department personnel on December 14, 2009. Eight Senior Reactor Operators and three Reactor Operator applicants were administered license examinations. The results of the examinations were finalized on January 11, 2010. All applicants passed all sections of their respective examinations and eight were issued senior operator licenses and three were issued operator licenses.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this examination.
Sincerely,
/RA by Michael E. Bielby for/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254, 50-265 License Nos. DPR-29, DPR-30
Enclosures:
1. Operator Licensing Examination Report 05000254/2009301(DRS); 05000265/2009301(DRS)
w/Attachment: Supplemental Information 2. Simulation Facility Report 3. Written Examinations and Answer Keys (SRO)
REGION III==
Docket No: 50-254; 50-265 License No: DPR-29, DPR-30 Report No: 05000254/2009301(DRS);
05000265/2009301(DRS)
Licensee: Exelon Generation Company, LLC Facility: Quad Cities Nuclear Power Station, Units 1 and 2 Location: Cordova, Illinois Dates: November 30 - December 14, 2009 Examiners: R. Walton, Operations Engineer (Chief)
D. McNeil, Senior Operations Engineer C. Zoia, Operations Engineer Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS
ER 05000254/2009301(DRS); 05000265/2009301(DRS); 11/30/2009 - 12/14/2009;
Exelon Generating Company, LLC, Quad Cities Station Initial License Examination Report.
The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021,
AOperator Licensing Examination Standards for Power Reactors,@ Revision 9.
Examination Summary:
$ Eleven of eleven applicants passed all sections of their respective examinations.
Eight applicants were issued senior operator licenses and three applicants were issued operator licenses. (Section 4OA5.1).
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other
.1 Initial Licensing Examinations
a. Examination Scope
The licensee prepared the examination outline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of November 2, 2009, at the Quad Cities Nuclear Power Station Training Building with the assistance of members of the licensee training staff. During the on-site validation week, the examiners audited three license applications for accuracy. The NRC examiners conducted the operating portion of the initial license examination during the weeks of November 30 and December 7, 2009. Members of the Quad Cities Nuclear Power Station training department staff administered the written examination on December 14, 2009. The NRC examiners used the guidance established in NUREG-1021, AOperator Licensing Examination Standards for Power Reactors,@
Revision 9, to prepare, validate, revise, administer, and grade the examination.
b. Findings
Written Examination The NRC examiners determined that the written examination, as originally submitted by the licensee, was within the range of acceptability expected for a proposed examination.
During the validation of the written examination several questions were modified or replaced. Changes made to the written examination were documented on Form ES-401-9, AWritten Examination Review Worksheet@ which is available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). The licensee did not submit any post-exam comments. The NRC examiners graded the written examination on December 30, 2009, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
Operating Test The NRC examiners determined that the operating test, as originally submitted by the licensee, was within the range of acceptability expected for a proposed examination.
During the validation of the operating test, minor comments were added to several Job Performance Measures (JPMs) and minor changes were made to the dynamic simulator scenarios. Changes made to the operating test were documented in a document titled, AOperating Test Comments,@ which is available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). The NRC examiners completed operating test grading on January 6, 2010.
Examination Results Eight applicants at the Senior Reactor Operator (SRO) level and three applicants at the Reactor Operator (RO) level were administered written and operating tests.
All 11 applicants passed all portions of the operating and written exam.
.2 Examination Security
a. Scope
The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with 10 CFR 55.49, AIntegrity of Examinations and Tests.@ The examiners used the guidelines provided in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors@ to determine acceptability of the licensee=s examination security activities.
b. Findings
No Findings
4OA6 Meetings
Exit Meeting The chief examiner conducted an exit meeting regarding the examination team's preliminary observations and findings on December 11, 2009, to K. Moser, and other members of the Perry Operations and Training Department staff. The examiners asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or exit meeting.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- K. Moser, Training Director
- D. Kimler, Shift Operations Supervisor
Dan Snook, Operations Training Manager
- J. Cox, Facility Representative
- R. Venci, Lead Exam Author
- D. Haas, Initial License Training, Lead Instructor
- J. Bries, Initial License Training Instructor
- M. Wagner, Regulatory Assurance
NRC
- R. Walton, Chief Examiner
- J. McGhee, Senior Resident Inspector, Quad Cities Station
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None
LIST OF DOCUMENTS REVIEWED