SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT - SECURITY BASELINE INSPECTION REPORT 05000263/2024402; INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07200058/2024401
Dear Shawn Hafen:
On October 24, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Monticello Nuclear Generating Plant. On October 24, 2024, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket No. 05000263, 07200058 License No. DPR-22, DPR-74 General License (ISFSI)
Enclosure:
As stated
Inspection Report
Docket Number:
05000263, 07200058
License Number:
DPR-22, DPR-74; General License (ISFSI)
Report Number:
05000263/2024402; 07200058/2024401
Enterprise Identifier:
I-2024-402-0044; I-2024-401-0082
Licensee:
Northern States Power Company
Facility:
Monticello Nuclear Generating Plant
Location:
Monticello, MN
Inspection Dates:
September 23, 2024 to October 24, 2024
Inspectors:
D. Garner, Security Specialist
K. Maloney, Sr Physical Security Inspector
Approved By:
Michael E. Ziolkowski, Chief
Security, Emergency Preparedness, and Incident Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Monticello Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
The NRC also conducted an independent spent fuel storage installation security inspection, in accordance with the Spent Fuel Storage Oversight Process. The Spent Fuel Storage Oversight Process is the NRCs program for overseeing the safe storage of spent nuclear fuel.
Refer to https://www.nrc.gov/waste/spent-fuel-storage/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.01 - Access Authorization
The inspectors evaluated the access authorization program. The following elements were evaluated:
Access Authorization
(1)
- Tier I: All
- Tier II: 02.05 a-b; 02.06 a-c; 02.08 a;
- Tier III: 02.10 a-c; 02.11 a.
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following procedure elements:
Security Plan Changes (1 Partial)
(1)
(Partial)
The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p(2) since the last performance of this IP.
OTHER ACTIVITIES
- INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations
(1)02.01 a-c; 02.02 a-h; 02.03 a-m; 02.04; 02.05 a-t; 02.06; 02.07 a-b; 02.08 a-c
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 24, 2024, the inspectors presented the security baseline inspection results to Shawn Hafen and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
Each - Initial,
Updated,
Reinvestigation 30,
Reinvestigation
31-365,
Reinvestigation
365-3yr
Employee Records - Initial, Updated, Reinvestigation 30,
Reinvestigation 31-365, Reinvestigation 365-3yr
FP-S-AA-01
Access Authorization Program
Procedures
QF1720
Fitness for Duty Handbook
Self-Assessments QF0406
Snapshot Self-Assessment for 71130.09 Security Plan
Changes and 81311 ISFSI Security
Corrective Action
Documents
CR#610000003875
Change Request Close Out Report - Security Radio
Programing.
2/24/2022
Recordable Physical Security Safeguards Events Log
(02/15/24 - 04/03/24).
Monticello Nuclear Generating Plant Response to
2/15/2008
NRC Confirmation Letter: Response to Order for
Implementation of Additional Security Measures and
Fingerprinting for Unescorted Access for Certain Spent Fuel
Storage Licensees - Monticello Nuclear Generating Plant
Independent Spent Fuel Storage Installation.
07/22/2008
(NS12615)
Monticello Nuclear Generating Plant Physical Security
NRC Order
EA-07-19
Issuance of Order for Implementation of Additional Security
Measures and Fingerprinting for Unescorted Access for
Certain Spent Fuel Storage Licensees - Monticello Nuclear
Generating Plant Independent Spent Fuel Storage
Installation (Ml091110627).
01/28/2008
81311
Miscellaneous
QF1755
Local Law Enforcement Agreement (LLEA) Memorandum of
Understanding (MOU) Law Enforcement Support, Wright
County Sheriffs Office, QF1755, Rev. 3 (FP-S-FSIP-13).
03/20/2024
1397-01
Vehicle Barrier System Inspection Procedure for
CWP-05.01
Security Computer System Startup/Shutdown/Failover
FP-S-FSIP-01
Security Compensatory Measure - Compensatory Measure
Matrix
FP-S-FSIP-08
Contingency Plan Implementing Procedures (CPIP)
(FP-S-FSIP-08), 1.19 Independent Spent Fuel Storage
Installation Contingency Response.
09/23/2024
FP-S-FSIP-09
Monticello Specific Alarm Response Matrix
QF1506
Software Test Plan, Computer Room Security Computer
System (SCS), Rev. 9 (FP-IT-SQA-10),
Document ID: STP - 611000005342
08/08/2024
QF1734
(FP-S-FSIP-04)
Weapons and Ammunition Disposition Log
Procedures
QF1763
(FP-S-FSIP-02): Post Orders, Zone 52 Offline - Dedicated
Observer, opened 06/16/24, closed 06/18/24.
QF1500
Computer Work Order: Bi-Weekly Cyber
Maintenance - (FP-IT-SQA-05),
Document ID: 61100005342.
WM-WO-1565
Quarterly Vehicle Barrier System Inspection
Annual Vehicle Barrier System Inspection
Work Orders
Preventative Maintenance SEC MO Gates and Barriers
(5-year Preventative Maintenance)
0