.. _.
_
_
.
.m
_
.. _
_ _.. _..
.
e 8800 UNITED STATES n
g o,,
NUCLEAR REGULATORY COMMISSION
.
.
n REGloN tl 5,
.$
101 M ARIETTA STREET,N.W.
ATLANTA, GEORGI A 30303
i
%,
,o
.....
t Report Nos. 50-259/82-35, 50-260/82-35 and 50-296/82-35 Licensee: Tennessee Valley Authority
-
500A Chestnut Street Chattanooga, TN 37401 Facility Name: Browns Ferry l
Docket Nos. 50-259, 50-260 and 50-296 i
License Nos. DPR-33, DPR-52 and DPR-68
,
Inspection at Browns Ferry site near Decatur, Alabama Inspector: 8[
/C 3/8L P. E. Fredri son g Dite Yigned j
i Approved by:
M/47 hor fo[/.f/t L P
C. M. Upright,' psctio ' Chief
'Da,(e Sfgned Engineering Inspect, n Branch Division of Engineering and Technical Programs
!
!,
SUMMARY Inspection on September 20-24. 1982
,
I Areas Inspected This routine, unannounced inspection involved 32 inspector-hours on site and at TVA headquarters in the areas of licensee action on previous enforcement matters; the QA/QC administration program; procurement; receipt, storage, and handling of materials; and the housekeeping and cleanliness program.
Results Of the five areas inspected, no violations or deviations were identified.
- l
4
__
ok1150475 821015
'
ADOCK 05000
-
G
.
- - - - -
- -
-
.
, - -.., - -. _. _, _ _ _., -
..*
,-r,
... ~ -,,,
.
_,n
.,
..._y,
,, - -. _. - - - - - -
_
__
.
.
_
._ _. _ _ _ _ _ - _ _..
_ - -
_
.-
.
.
.
i
.
i REPORT DETAILS
1.
Persons Contacted
'
Licensee Employees
- W. Andrews, Nuclear Power QA
.
- J. Bynum, Assistant Plant Superintendent (Operations)
'
- G. Campbell, Plant Services Supervisor
- E. Ennis, Assistant Plant Supervisor (Operations)
- L. Jones, Supervisor, Plant QA Staff G. Killian, Supervisor, Quality Planning and Engineering Section, QAAS F. Lewis, QA Engineer
- C. McWherter, Head, Procurement Programs Group, QAAS
- J. Pittman, Assistant Plant Superintendent
- B. Weeks, Supervisor Power Stores Unit Other licensee employees contacted included technicians and office personnel.
<
NRC Resident Inspector
- J. Chase, Senior Resident Inspector
- 3. Paulk, Resident Inspector
- Attended exit interview at the site on September 23.
- Attended exit interview at TVA Headquarters on September 24.
2.
Exit Interview The inspection scope and findings were summarized on September 23 and 24, 1982, with those persons indicated in paragraph 1 above. The licensee acknowledged the inspection findings.
The following new items were discussed:
-
Inspector Followup Item, 259, 260, 296/82-35-01, Implementation of Revision 5 to the Accepted QA Program, paragraph 5.
,
-
Inspector Followup Item, 259, 260, 296/82-35-02, Conduct of Annual Supplier Evaluation, paragraph 6.
-
Inspector Followup Item, 259, 260, 296/82-35-03, Use of Protective Coverings During Materials Storage, paragraph 7.
3.
Licensee Action on Previous Enforcement Matters
a.
(Closed) Unresolved Item (259,260, 296/82-04-02): Valve Storage Condi-tion. The inspector noted that the eight valves had been moved into a
_ _
_
-
..
_
_ _ _ _
- -
._
.
.
- ~.
-
-
.
.
._
.
,.
warehouse. A review of the Engineering Change Notice (ECN) for which these valves had been ordered revealed that, although the valves had been ordered as safety-related for Hartsville, the valves were now being used in a nonsafety related design change. The valves are being stored properly.
b.
(Closed) Violation (259,260, 296/82-10-03): Failure to Implement QA Program On Receipt Inspections. TVA's response dated June 10, 1982, is considered acceptable by Region II.
The inspector reviewed BF 16.4 revised July 1982 and verified that QC receipt inspectors are now inspecting both material and procurement documents as required by the N-00AM.
The inspector concluded that TVA had determined the full extent of the violation, performed the necessary survey and followup i
actions to correct the present conditions, and developed the necessary corrective actions to preclude recurrence of similar violations.
Corrective actions stated in the response have been implemented.
'
Unresolved Items Unresolved items were not identified during this inspection.
5.
QA/QC Administrative Program (35751)
References:
(a) Topical Report TVA-TR75-1, Revision 5 (b) N-0QAM. Appendix A, Browns Ferry Critical Structures, Systems and Components (CSSC) List, revised 5/82 (c) BF 2.2, Source Document Implementation, revised 8/82 The following aspects of the QA/QC program were verified:
-
QA Program documents clearly define the structures, systems, components, and activities to which the program applies.
!
Administrative controls of QA/QC Department procedures exist that
-
provide for review and approval of procedures prior to implementation; controls for changes and revisions to procedures exist and controls
,
exist for distribution and recall of procedures.
-
Responsibilities have been established to assure overall review of the effectiveness of the QA Program.
Methods exist to modify the QA Program to provide increased emphasis in
-
problem areas identified during audit activities.
Within this area, one inspector followup item was identified. Based on the
,
recent change to the accepted QA Program (reference (a)), the inspector reviewed the licensee's action taken to modify the Nuclear Operational Quality Assurance Manual (N-00AM) in order to reflect this new revi:, ion,
,
i The Nuclear Power QA staff is in the process of conducting a program require-ments review which will link requirements in the accepted QA Program to the N-00AM, which procedurally implements the program. This review should
. _ -. - - - -
.
.
_
.
.
.
.
-
-
,
.
assure that all aspects of the program, except the audit function, are addressed and documented in subtier documents. The Office of Power Quality Assurance and Audit Staff has responsibliity for the audit f unction and has reviewed that portion of tne program change. The licensee stated that the program requirements review would be completed and N-0QAM changes written and approved by January 1, 1983. Completion of this review and integration of the program change into the N-00AM is identified as an inspector followup item (259, 260, 296/82-35-01) and will be reviewed during a subsequent inspection.
'
6.
Procurement (38701)
References:
(a) N-00AM, Part III, Section 2.1, Procurement of Materials, Components, Spare Parts and Services, revisad 8/82 (b) N-00AM, Part III, Section 2.4, Preparation Performance and Reporting of Supplier Quality Assurance Audits and Evaluations by the Nuclear Central Office Quality Assurance Staff, revised 5/81 (c) DPM N72A14, General Procurement Procedure for the Division of Nuclear Power, revised 7/82 (d) DPM N756A4, Standards and Substitution Guides for Quality Assurance Level III Items, revised 6/82 (e) BF 16.2, Prccurement, revised 9/82 (f) BF 16.3, Quality Control of Material, Components, Spare Parts, and Services, revised 7/82 (g) Division of Power Qualified Supplier List The inspector reviewed the licensee's procurement program with respect to selected elements of the accepted QA Program. The inspection was to verify that administrative controls had been established for the preparation, review, approval, and revision of procurement documents. Implementation of the procurement program was verified by reviewing the procurement documents of several safety-related items and verifying that they were prepared in accordance with administrative controls, that they were purchased from qualified vendors, and that they required the vendor to supply appropriate documentation of quality. The following specific items were reviewed:
Contract Number Quality Level 3285682
332419
825344
252643
291023
The inspector also reviewed the licensee's procedures to verify that acceptable methods were being used to qualify vendors which provide quality goods or services, that these procedures required maintenance of records of supplier qualifications and audits, and that responsibilities have been
..
.
assigned to perform the vendor qualification program. To verify implementa-tion, the inspector selected several vendors for review of their TVA quali-fication determination and also to verify that these vendors were documented on the qualified vendors list.
Within this area, one inspector followup item was identified. The vendor audit function had recently been transferred from Nuclear Power QA to Office of Power QA.
The vendor audit personnel were still complying with reference (b), but provided the inspector with a draft procedure QAAS-QAP-3.5, Supplier Quality Evaluation Program, to be used during sub-sequent vendor audits by the Office of Power. During the review of annual vendor evaluations required by reference (b), the inspector found that several evaluations specified by the licensee's controlling procedure were late by 1 or 2 months. The Procurement Programs Group Head stated that he was aware of this problem and that corrective measures were in progress to perform the delinquent evaluations.
The late evaluations were apparently due to the reorganization and personnel relocations. The licensee provided a date of January 1,1983 for implementing an approved procedure ard for conducting the annual evaluation within the required time frame. This area is identified as an inspector followup item (259, 260, 296/82-35-02) and will be reviewed during a subsequent inspection.
7.
Receipt, Storage, and Handling of Materials (38702)
References:
(a) N-00AM, Part III, Section 2.2, Receipt Inspection, Handling, Storage of Materials, Components and Spare Parts, revised, 3/81 (b) N-00AM, Part III, Section 2.3, Issuing of Material, Components and Spare Parts, revised 7/81 (c) DPM N77A2, Storage and Shelf Life Consideration for Materials with Natural Aging Lite, revised 4/81 (d) BF 16.4, Material, Components and Spare Parts Receipt, Handling, Storage, Issuing, Return to Storeroom and Transfer, revised 7/82 (e) BF 16.5, Nonconforming Material, Components and Spare Parts, revised 2/82 (f) MAI-15, Receiving, Inspection, Storage and Withdrawal of ECN Material, revised 5/82 The inspector reviewed the licensee's program for the receipt, storage, and handling of equipment and material with respect to selected elements of the licensee's accepted QA Program. The inspection veri fied that administrative controls had been established concerning receipt inspection of safety-related materials, preparation and retention of required documenta-tien, control of acceptable nonconforming and conditional release items, and control of items in storage. Implementation of the program was reviewed by selecting several safety-related items in storage and verifying document and item control to be in accordance with the program. The following specific items were reviewed:
. -
._
_
_ _ _ -. -
.
._.
_
_ _.
_ _ _
_._
,_
-
j-.
.
Item Contract Number Selector Switch 230788 Printed Circuit Module 252643 1" Steel Bar 3285682
Square D Relay 291023 l
Valve Seat Ring 20702 Coil 300444
i Flcat Switch RD 859532
'
Neutron Monitor O' Ring 332419
,
Reactor Protection Cabinets 829413 i
6", 600# Gate Valve 825344 Within this area, one inspector followup item was identified. During the
'
review of the Engineering Change Notice (ECN) warehouse complex, several
CSSC valves and sections of pipe were observed to be missing protective coverings as required by ANSI N45.2.2 and reference (d). This problem had
previously been identified by the onsite QA staff in a QA survey conducted on April 20, 1982. Corrective Action Report (CAR) 82-30-PS was written and protective covers were ordered for the material. The material does not appear to be damaged.
This licensee identified problem is noted as an inspector followup item (259, 260, 296/82-35-03).
The resolution of CAR 82-30-PS and a reinspection of the ECN warehouse will be conducted during a subsequent inspection.
8.
Housekeeping and Cleanliness Program (54701)
,
i References:
(a) N-00AM, Part II, Section 1.2, Housekeeping in Nuclear l
Power Plants, revised 12/81 (b) DPM N73ES, Cleanliness Criteria for Plant Components and Piping Systems-All Nuclear Plants, revised 3/82 (c) DPM N79M3, Foreign Objects In The Primary Coolant System, revised 10/81 (d) BF 3.10, Cleanliness of Piping Systems, revised 6/82 (e) BF 14.3, Housekaeping, revised 4/82 l
The inspector reviewed the referenced material with respect to the l
licensee's accepted QA program. The inspection verified that administrative
!
controls for general housekeeping and cleanliness practices have been
established which include the following specific items: control of house-j keeping during work activities; requirements that excessive equipment and materials are returned to storage areas; requirements for the prompt removal i
from the facility of combustible materials or debris; requirements for cleaning safety-related components and systems; establishment of cleanliness
classifications for plant systems; establishment of requirements for material accountability in critical areas; requirements for cleaning primary system components that have been repaired or replaced; and requirements for j
maintaining the cleanliness of previously cleaned systems.
Within the area, no violations or deviations were identified.