NOY l 0 l992 Docket Nos.
50-250, 50-251 License Nos.
DPR-31, DPR-41 EA 92-213 Florida Power and Light Company ATTN:
Mr. J.
H. Goldberg President
- Nuclear Division Nuclear Energy Department P. 0.
Box 14000 Juno Beach, FL 33408 Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-250/92-20 and 50-251/92-20 This refers to the inspection conducted by Mr. R.
C. Butcher of this office on August 23 through October 2, 1992.
The inspection included a review of activities authorized for your Turkey Point facility.
At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed Inspection Report.
Areas examined during the inspection are identified in the report.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.
This repair also examines your actions during hurricane Andrew whereby you deviated from Technical Specifications under the provisions of 10 CFR 50.54(x).
The NRC has determined that your actions taken to protect the health and safety of the public were appropriate and that no enforcement action will be taken.
There are two instances addressed where Technical Specification deviations occurred due to events beyond your control and, as provided in Section VI.A of the NRC Enforcement Policy, no enforcement action will be taken.
The enclosed Inspection Report identifies activities that violated NRC requirements that will not be subject to enforcement action because the licensee's efforts in identifying and/or correcting the violation meet the criteria specified in Section VII.B of the Enforcement Policy.
Therefore, a
response is not required.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of this letter and its enclosure will be placed in the NRC Public Document Room.
9212020059 921110 PDR ADOCK 05000250 Q
Florida Power and Light Company NOY I 0 $92 Should you have any questions concerning this letter, please contact us.
Sincerely, Original signed by Jon R. Johnson (for)
Ellis W. Herschoff, Director Division of Reactor Projects Enclosure:
NRC Inspection Report cc w/encl:
T. F. Plunkett, Site Vice President Turkey Point Nuclear Plant P. 0.
Box 029100 Hiami, FL 33102 L.
W. Pearce, Plant General Manager Turkey Point Nuclear Plant P. 0.
Box 029100 Miami, FL 33102 T. V. Abbatiello, Site guality Manager Turkey Point Nuclear Plant P. 0.
Box 029100 Miami, FL 33102 R.
E. Grazio, Nuclear Licensing Director P. 0.
Box 14000 Juno Beach, FL 33408 E. J.
Weinkam, Licensing Manager Turkey Point Nuclear Plant P. 0.
Box 029100 Miami, FL 33102 Harold F. Reis, Esq.
Newman and Holtzinger, P.C.
)6)5 L Street, NW Washington, D.C.
20036 John T. Butler, Esq.
Steel, Hector, and Davis 4000 Southeast Financial Center Miami, FL 33)31-2398 cc w/encl:
{Cont'd on page 3)
Florida Power and Light Company NOY l 0 l992 cc w/encl cont'd:
Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, FL 32304 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida Twin Towers 2600 Blair Stone Road Tallahassee, FL 32301 Joaquin Avino County Hanager of Metropolitan Dade County ill NW 1st Street, 29th Floor Niami,'L 33128 Intergovernmental Coordination and Review Office of Planning and Budget Executive Office of the Governor The Capitol Building Tallahassee, FL 32301 State of Florida bcc w/encl:
(See page 4)
Florida Power and Light Company NOV l 0 l992 bcc w/encl:
Rajender Auluck, NRR Kerry D. Landis, RII Jon R. Johnson, RII Document Control Desk Ross C. Butcher, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O.
Box 1448 Homestead, FL 33090 F5'+~4 RII:DRP RII:DRP RSchin KLandis 10/
/92 10/
/92 RII:DRP HSinkul e 10/0 /92 tl RII:EICS g~
GJenkins g~ /Igsp~~pp/
+~/~
10/
/92 g I)Jq/q~~~ @~7M~ >7~"'"".
//g-. c 4-
Florida Power and Light Company Rajender Auluck, NRR Kerry D. Landis, RII Jon R. Johnson, RII Document Control Desk Ross C. Butcher, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O.
Box 1448 Homestead, FL 33090 RI 'RP RII:
R t
)
RSc in KL s
10/~/92 10/yP/92 RII:DRP HSinkul e 10/I
/92 RI GJen s
10/ o/92