IR 05000244/1992007

From kanterella
Jump to navigation Jump to search
Requalification Exam Rept 50-244/92-07OL-RQ on 920422. Exam Results:Both Individuals Passed re-exam
ML17262A858
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/07/1992
From: Bissett P, Dantonio J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17262A857 List:
References
50-244-92-07OL, 50-244-92-7OL, NUDOCS 9205260022
Download: ML17262A858 (6)


Text

U. S. NUCLEAR REGULATORY COMMISSION REGION I OPERATOR LICENSING REQUALIFICATIONEXAMINATIONREPORT EXAMINATIONREPORT NO.:

FACILITYDOCKET NO.:

FACILITYLICENSE NO:

LICENSEE:

EXAMINATION DATE'0-244/92-07 (OL-RQ)

50-244 DPR-18 Rochester Gas & Electric Company April22, 1992 EXAMINER:

oseph D'Antonio, Operations Engineer ate APPROVED BY:

Paul Bissett, Acting Chief PWR Section Operations Branch, DRS Dae SUMMARY: Requalification retake examinations were administered to two Senior Reactor Operators (SRO) who had failed portions of a previously administered requalification examination.

Both individuals passed their reexamination.

920M&0022 9205i4 PDR ADOCK 05000244 V

PDR

I I

DETAILS TYPE OF EXAMINATION: Requalification 1.0 EXAMINATIONRESULTS:

Both individuals passed their examinations as graded by both the NRC and facility. There was 100% agreement between the facility and NRC evaluator.

2.0 PERSONS CONTACTED:

R ch ter

&El ric m

n

.

W. Marlow

  • G. Meier W. Schuler
  • R. Carroll
  • F. Maciuska
  • K. Masker Superintendent Ginna Production Production Division Training Dept. Manager Operations Manager Operations and Technical Training Manager Supervisor, License Training Senior License Instructor Nuclear Re ul o

Commis i n'J.

D'Antonio

"'E. Knutson Operations Engineer/Examiner Resident Inspector 3.0 GENERAL COMMENTS:

During the preexam review and validation, the following discrepancies were noted, (i)

The written examination contained several questions which were direct look ups of either Technical Specifications or Alarm Response procedures, The facility needs to upgrade the cognitive level of these questions.

(ii)

One question on the second simulator static exam answered an earlier question.

Required changes were made prior to conduct of the examination.

Overall, the number of changes and quality of examination material were average.

Facility personnel were very cooperative and all requested changes were accomplished.

  • Denotes those present at exit meeting conducted after the examinatio,0 EXITMEETING:

An exit meeting was held with the facility evaluators at the completion of the examination.

Examination and validation results, comments, and observations were discussed.

Formalized facility results were requested by the end of the week following the examination.

Attachment; Facility Examination Results Summary

ATTACHMENTI FA ILITYEXAMINATI N R LT SUMMARY

~

~

ES-601 -3 E

REV 6 06/Ol/gO PRIVACY ACT INFORMATION - FOR C POWER PLANT REQUALIFICATION RESULTS SUMMARY SHEET Faci lit:

R. E.

GINNA Exam Dote:

4/22/92 Examiners:

K. MASKER (RGE)

OVERALL RESULTS Reoctor 0 orator Senior 0 erator Total 0 eratin Crows TOTAL PASSED FAILED

/ 7.

2 /10

0 2 /10

0 Nome Dacket 55-Grader JPMs of JPM 7i Overall Written Results/Inltlals Total Wrltton Slmul Wlkthru NRC of APER4T A.

FAC 1 of 1 100 72.2 6.3 84.3 AS KM AS KM oP ~~qq +m NRC FAC NRC FAC FAC NRC FAC NRC FAC NRC FAC of of of of of of of of of of of 90.7 100 95.3 AS KM Examiner Standards PRIVACY ACT INFORMATION - FOR 32 of 34