Similar Documents at Ginna |
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000244/19990071999-09-20020 September 1999 Insp Rept 50-244/99-07 on 990719-23 & 0802-06.NCVs Noted. Major Areas Inspected:Maint & Engineering IR 05000244/19970081997-07-16016 July 1997 Insp Rept 50-244/97-08 on 970527-30.Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected: Conduct of Security & Safeguards Activities,Status of Security Facilities & PA Barriers & Vehicles Barrier Sys IR 05000244/19900211990-10-24024 October 1990 Physical Security Insp Rept 50-244/90-21 on 900910-14. No Violations Noted.Major Areas Inspected:Onsite follow-up of Previously Indentified Items,Mgt Support & Security Program Plans & Audits IR 05000244/19870281988-01-25025 January 1988 Partially Withheld Physical Security Insp Rept 50-244/87-28 on 871116-20 (Ref 10CFR2.790 & 73.21).No Violations Noted. Major Areas Inspected:Plan & Implementing Procedures, Organization,Program Audits & Records & Repts IR 05000244/19870211987-09-29029 September 1987 Insp Rept 50-244/87-21 on 870831-0904.No Violations Noted. Major Areas Inspected:Review of Licensee Action on Previously NRC Identified Concerns,Followup of Generic Ltr 83-28,Item 4.1 & Qa/Qc Interfaces IR 05000244/19870191987-08-28028 August 1987 Insp Rept 50-244/87-19 on 870727-31.Violation Noted.Major Areas Inspected:Occupational Radiation Protection Program, Including Status of Previously Identified Items,Organization & Mgt Controls,Audits & External Exposure Control IR 05000244/19870051987-03-24024 March 1987 Insp Rept 50-244/87-05 on 870224-27.No Violations Noted. Major Areas Inspected:Status of Previously Identified Items, Organization & Mgt Controls,Training & Qualification of New Personnel,External & Internal Exposure Control & ALARA IR 05000244/19870061987-03-24024 March 1987 Insp Rept 50-244/87-06 on 870224-27.No Violations Noted. Major Areas Inspected:Activities Associated W/Steam Generator Exams & Maint,Inservice Insp & Licensee Actions on Previous Insp Findings IR 05000244/19870021987-02-18018 February 1987 Insp Rept 50-244/87-02 on 870104-0207.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Findings, Review of Plant Operations,Operational Safety Verification, Surveillance Testing,Plant Maint & LERs IR 05000244/19870011987-02-0404 February 1987 Insp Rept 50-244/87-01 on 870105-09.No Violations Noted. Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Matl & Contamination & Surveys & Monitoring ML20212M1901987-01-16016 January 1987 Safety Insp Rept 50-244/86-22 on 861215-19.No Violations or Deviations Noted.Major Areas Inspected:Licensee Response to Previous Insp Findings & Effectiveness of Licensee Correction Action Program IR 05000244/19860211987-01-12012 January 1987 Insp Rept 50-244/86-21 on 861109-870103.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Review of Plant Operations,Operational Safety Verification, Surveillance Testing & Plant Maint IR 05000244/19860121986-10-0909 October 1986 Emergency Preparedness Insp Rept 50-244/86-12 on 860826-29. Violation Noted Re Ability to Fully Staff & Augment Emergency Response Organization in Timely Manner IR 05000244/19860131986-10-0202 October 1986 Insp Rept 50-244/86-13 on 860909-11.No Violation Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise Performed on 860910 IR 05000244/19850201985-10-22022 October 1985 Insp Rept 50-244/85-20 on 850925-27.No Violation Noted.Major Areas Inspected:Emergency Preparedness & Annual Emergency Exercise Performed on 850926 IR 05000244/19820131982-07-20020 July 1982 IE Insp Rept 50-244/82-13 on 820628-0701.No Noncompliance Noted.Major Areas Inspected:Followup on IE Circular 80-21, Verification of Core load,post-refueling Startup Testing & Control Rod Worth Measurements & Predications IR 05000244/19820111982-06-18018 June 1982 IE Insp Rept 50-244/82-11 on 820517-19.No Noncompliance Noted.Major Areas Inspected:Environ Monitoring Programs for Operation Including Mgt Controls & QC of Analytical Measurements IR 05000244/19820101982-06-15015 June 1982 IE Insp Rept 50-244/82-10 on 820501-31.Noncompliance Noted: Failure to Properly Implement & Track QA Surveillance Repts 1999-09-20
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000244/19990071999-09-20020 September 1999 Insp Rept 50-244/99-07 on 990719-23 & 0802-06.NCVs Noted. Major Areas Inspected:Maint & Engineering IR 05000244/19970081997-07-16016 July 1997 Insp Rept 50-244/97-08 on 970527-30.Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected: Conduct of Security & Safeguards Activities,Status of Security Facilities & PA Barriers & Vehicles Barrier Sys IR 05000244/19900211990-10-24024 October 1990 Physical Security Insp Rept 50-244/90-21 on 900910-14. No Violations Noted.Major Areas Inspected:Onsite follow-up of Previously Indentified Items,Mgt Support & Security Program Plans & Audits IR 05000244/19870281988-01-25025 January 1988 Partially Withheld Physical Security Insp Rept 50-244/87-28 on 871116-20 (Ref 10CFR2.790 & 73.21).No Violations Noted. Major Areas Inspected:Plan & Implementing Procedures, Organization,Program Audits & Records & Repts IR 05000244/19870211987-09-29029 September 1987 Insp Rept 50-244/87-21 on 870831-0904.No Violations Noted. Major Areas Inspected:Review of Licensee Action on Previously NRC Identified Concerns,Followup of Generic Ltr 83-28,Item 4.1 & Qa/Qc Interfaces IR 05000244/19870191987-08-28028 August 1987 Insp Rept 50-244/87-19 on 870727-31.Violation Noted.Major Areas Inspected:Occupational Radiation Protection Program, Including Status of Previously Identified Items,Organization & Mgt Controls,Audits & External Exposure Control IR 05000244/19870051987-03-24024 March 1987 Insp Rept 50-244/87-05 on 870224-27.No Violations Noted. Major Areas Inspected:Status of Previously Identified Items, Organization & Mgt Controls,Training & Qualification of New Personnel,External & Internal Exposure Control & ALARA IR 05000244/19870061987-03-24024 March 1987 Insp Rept 50-244/87-06 on 870224-27.No Violations Noted. Major Areas Inspected:Activities Associated W/Steam Generator Exams & Maint,Inservice Insp & Licensee Actions on Previous Insp Findings IR 05000244/19870021987-02-18018 February 1987 Insp Rept 50-244/87-02 on 870104-0207.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Findings, Review of Plant Operations,Operational Safety Verification, Surveillance Testing,Plant Maint & LERs IR 05000244/19870011987-02-0404 February 1987 Insp Rept 50-244/87-01 on 870105-09.No Violations Noted. Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Matl & Contamination & Surveys & Monitoring ML20212M1901987-01-16016 January 1987 Safety Insp Rept 50-244/86-22 on 861215-19.No Violations or Deviations Noted.Major Areas Inspected:Licensee Response to Previous Insp Findings & Effectiveness of Licensee Correction Action Program IR 05000244/19860211987-01-12012 January 1987 Insp Rept 50-244/86-21 on 861109-870103.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Review of Plant Operations,Operational Safety Verification, Surveillance Testing & Plant Maint IR 05000244/19860121986-10-0909 October 1986 Emergency Preparedness Insp Rept 50-244/86-12 on 860826-29. Violation Noted Re Ability to Fully Staff & Augment Emergency Response Organization in Timely Manner IR 05000244/19860131986-10-0202 October 1986 Insp Rept 50-244/86-13 on 860909-11.No Violation Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise Performed on 860910 IR 05000244/19850201985-10-22022 October 1985 Insp Rept 50-244/85-20 on 850925-27.No Violation Noted.Major Areas Inspected:Emergency Preparedness & Annual Emergency Exercise Performed on 850926 IR 05000244/19820131982-07-20020 July 1982 IE Insp Rept 50-244/82-13 on 820628-0701.No Noncompliance Noted.Major Areas Inspected:Followup on IE Circular 80-21, Verification of Core load,post-refueling Startup Testing & Control Rod Worth Measurements & Predications IR 05000244/19820111982-06-18018 June 1982 IE Insp Rept 50-244/82-11 on 820517-19.No Noncompliance Noted.Major Areas Inspected:Environ Monitoring Programs for Operation Including Mgt Controls & QC of Analytical Measurements IR 05000244/19820101982-06-15015 June 1982 IE Insp Rept 50-244/82-10 on 820501-31.Noncompliance Noted: Failure to Properly Implement & Track QA Surveillance Repts 1999-09-20
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000244/19990071999-09-20020 September 1999 Insp Rept 50-244/99-07 on 990719-23 & 0802-06.NCVs Noted. Major Areas Inspected:Maint & Engineering IR 05000244/19970081997-07-16016 July 1997 Insp Rept 50-244/97-08 on 970527-30.Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected: Conduct of Security & Safeguards Activities,Status of Security Facilities & PA Barriers & Vehicles Barrier Sys IR 05000244/19900211990-10-24024 October 1990 Physical Security Insp Rept 50-244/90-21 on 900910-14. No Violations Noted.Major Areas Inspected:Onsite follow-up of Previously Indentified Items,Mgt Support & Security Program Plans & Audits IR 05000244/19870281988-01-25025 January 1988 Partially Withheld Physical Security Insp Rept 50-244/87-28 on 871116-20 (Ref 10CFR2.790 & 73.21).No Violations Noted. Major Areas Inspected:Plan & Implementing Procedures, Organization,Program Audits & Records & Repts IR 05000244/19870211987-09-29029 September 1987 Insp Rept 50-244/87-21 on 870831-0904.No Violations Noted. Major Areas Inspected:Review of Licensee Action on Previously NRC Identified Concerns,Followup of Generic Ltr 83-28,Item 4.1 & Qa/Qc Interfaces IR 05000244/19870191987-08-28028 August 1987 Insp Rept 50-244/87-19 on 870727-31.Violation Noted.Major Areas Inspected:Occupational Radiation Protection Program, Including Status of Previously Identified Items,Organization & Mgt Controls,Audits & External Exposure Control IR 05000244/19870051987-03-24024 March 1987 Insp Rept 50-244/87-05 on 870224-27.No Violations Noted. Major Areas Inspected:Status of Previously Identified Items, Organization & Mgt Controls,Training & Qualification of New Personnel,External & Internal Exposure Control & ALARA IR 05000244/19870061987-03-24024 March 1987 Insp Rept 50-244/87-06 on 870224-27.No Violations Noted. Major Areas Inspected:Activities Associated W/Steam Generator Exams & Maint,Inservice Insp & Licensee Actions on Previous Insp Findings IR 05000244/19870021987-02-18018 February 1987 Insp Rept 50-244/87-02 on 870104-0207.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Findings, Review of Plant Operations,Operational Safety Verification, Surveillance Testing,Plant Maint & LERs IR 05000244/19870011987-02-0404 February 1987 Insp Rept 50-244/87-01 on 870105-09.No Violations Noted. Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Matl & Contamination & Surveys & Monitoring ML20212M1901987-01-16016 January 1987 Safety Insp Rept 50-244/86-22 on 861215-19.No Violations or Deviations Noted.Major Areas Inspected:Licensee Response to Previous Insp Findings & Effectiveness of Licensee Correction Action Program IR 05000244/19860211987-01-12012 January 1987 Insp Rept 50-244/86-21 on 861109-870103.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Review of Plant Operations,Operational Safety Verification, Surveillance Testing & Plant Maint IR 05000244/19860121986-10-0909 October 1986 Emergency Preparedness Insp Rept 50-244/86-12 on 860826-29. Violation Noted Re Ability to Fully Staff & Augment Emergency Response Organization in Timely Manner IR 05000244/19860131986-10-0202 October 1986 Insp Rept 50-244/86-13 on 860909-11.No Violation Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise Performed on 860910 IR 05000244/19850201985-10-22022 October 1985 Insp Rept 50-244/85-20 on 850925-27.No Violation Noted.Major Areas Inspected:Emergency Preparedness & Annual Emergency Exercise Performed on 850926 IR 05000244/19820131982-07-20020 July 1982 IE Insp Rept 50-244/82-13 on 820628-0701.No Noncompliance Noted.Major Areas Inspected:Followup on IE Circular 80-21, Verification of Core load,post-refueling Startup Testing & Control Rod Worth Measurements & Predications IR 05000244/19820111982-06-18018 June 1982 IE Insp Rept 50-244/82-11 on 820517-19.No Noncompliance Noted.Major Areas Inspected:Environ Monitoring Programs for Operation Including Mgt Controls & QC of Analytical Measurements IR 05000244/19820101982-06-15015 June 1982 IE Insp Rept 50-244/82-10 on 820501-31.Noncompliance Noted: Failure to Properly Implement & Track QA Surveillance Repts 1999-09-20
[Table view] Category:UTILITY
MONTHYEARIR 05000244/19870281988-01-25025 January 1988 Partially Withheld Physical Security Insp Rept 50-244/87-28 on 871116-20 (Ref 10CFR2.790 & 73.21).No Violations Noted. Major Areas Inspected:Plan & Implementing Procedures, Organization,Program Audits & Records & Repts IR 05000244/19870211987-09-29029 September 1987 Insp Rept 50-244/87-21 on 870831-0904.No Violations Noted. Major Areas Inspected:Review of Licensee Action on Previously NRC Identified Concerns,Followup of Generic Ltr 83-28,Item 4.1 & Qa/Qc Interfaces IR 05000244/19870191987-08-28028 August 1987 Insp Rept 50-244/87-19 on 870727-31.Violation Noted.Major Areas Inspected:Occupational Radiation Protection Program, Including Status of Previously Identified Items,Organization & Mgt Controls,Audits & External Exposure Control IR 05000244/19870061987-03-24024 March 1987 Insp Rept 50-244/87-06 on 870224-27.No Violations Noted. Major Areas Inspected:Activities Associated W/Steam Generator Exams & Maint,Inservice Insp & Licensee Actions on Previous Insp Findings IR 05000244/19870051987-03-24024 March 1987 Insp Rept 50-244/87-05 on 870224-27.No Violations Noted. Major Areas Inspected:Status of Previously Identified Items, Organization & Mgt Controls,Training & Qualification of New Personnel,External & Internal Exposure Control & ALARA IR 05000244/19870011987-02-0404 February 1987 Insp Rept 50-244/87-01 on 870105-09.No Violations Noted. Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Matl & Contamination & Surveys & Monitoring ML20212M1901987-01-16016 January 1987 Safety Insp Rept 50-244/86-22 on 861215-19.No Violations or Deviations Noted.Major Areas Inspected:Licensee Response to Previous Insp Findings & Effectiveness of Licensee Correction Action Program IR 05000244/19860211987-01-12012 January 1987 Insp Rept 50-244/86-21 on 861109-870103.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Review of Plant Operations,Operational Safety Verification, Surveillance Testing & Plant Maint IR 05000244/19860121986-10-0909 October 1986 Emergency Preparedness Insp Rept 50-244/86-12 on 860826-29. Violation Noted Re Ability to Fully Staff & Augment Emergency Response Organization in Timely Manner IR 05000244/19860131986-10-0202 October 1986 Insp Rept 50-244/86-13 on 860909-11.No Violation Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise Performed on 860910 IR 05000244/19850201985-10-22022 October 1985 Insp Rept 50-244/85-20 on 850925-27.No Violation Noted.Major Areas Inspected:Emergency Preparedness & Annual Emergency Exercise Performed on 850926 IR 05000244/19820131982-07-20020 July 1982 IE Insp Rept 50-244/82-13 on 820628-0701.No Noncompliance Noted.Major Areas Inspected:Followup on IE Circular 80-21, Verification of Core load,post-refueling Startup Testing & Control Rod Worth Measurements & Predications IR 05000244/19820111982-06-18018 June 1982 IE Insp Rept 50-244/82-11 on 820517-19.No Noncompliance Noted.Major Areas Inspected:Environ Monitoring Programs for Operation Including Mgt Controls & QC of Analytical Measurements IR 05000244/19820101982-06-15015 June 1982 IE Insp Rept 50-244/82-10 on 820501-31.Noncompliance Noted: Failure to Properly Implement & Track QA Surveillance Repts 1988-01-25
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000244/19990071999-09-20020 September 1999 Insp Rept 50-244/99-07 on 990719-23 & 0802-06.NCVs Noted. Major Areas Inspected:Maint & Engineering ML20217L9861997-08-15015 August 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Vehicle Barriers Deployed Outside Outer Isolation Zone Would Not Prevent Malicious Use of Vehicle to Gain Entry to Protected Areas IR 05000244/19970081997-07-16016 July 1997 Insp Rept 50-244/97-08 on 970527-30.Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected: Conduct of Security & Safeguards Activities,Status of Security Facilities & PA Barriers & Vehicles Barrier Sys ML20132H0791996-12-13013 December 1996 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Violation Noted:Prior to 960803, Measures Not Established to Assure That Certain Conditions Adverse to Quality Not Promptly Identified & Corrected IR 05000244/19900211990-10-24024 October 1990 Physical Security Insp Rept 50-244/90-21 on 900910-14. No Violations Noted.Major Areas Inspected:Onsite follow-up of Previously Indentified Items,Mgt Support & Security Program Plans & Audits ML20246E2561989-04-28028 April 1989 Notice of Violation from Insp on 890313-17.Violation Noted: Design Criteria & Safety Analysis for PORV Block Valve Replacement,To Be Performed During 1989 Outage,Did Not Address Operability Qualification of Replacement Valves PNO-I-88-057A, identified Radioactive Contamination on Contractor Exiting Facility Protected Area.Contamination Also Identified in Individual Home & co-worker Car.Caused by Inadequate Monitoring Before Leaving Restricted Area1988-06-22022 June 1988 PNO-I-88-057A:identified Radioactive Contamination on Contractor Exiting Facility Protected Area.Contamination Also Identified in Individual Home & co-worker Car.Caused by Inadequate Monitoring Before Leaving Restricted Area IR 05000244/19870281988-01-25025 January 1988 Partially Withheld Physical Security Insp Rept 50-244/87-28 on 871116-20 (Ref 10CFR2.790 & 73.21).No Violations Noted. Major Areas Inspected:Plan & Implementing Procedures, Organization,Program Audits & Records & Repts IR 05000244/19870221987-11-24024 November 1987 Exam Rept 50-244/87-22OL During Week of 871005.Exam Results: Six Senior Reactor Operators & Four Reactor Operators Passed All Exams & One Reactor Operator Failed Written Exam IR 05000244/19870211987-09-29029 September 1987 Insp Rept 50-244/87-21 on 870831-0904.No Violations Noted. Major Areas Inspected:Review of Licensee Action on Previously NRC Identified Concerns,Followup of Generic Ltr 83-28,Item 4.1 & Qa/Qc Interfaces IR 05000244/19870191987-08-28028 August 1987 Insp Rept 50-244/87-19 on 870727-31.Violation Noted.Major Areas Inspected:Occupational Radiation Protection Program, Including Status of Previously Identified Items,Organization & Mgt Controls,Audits & External Exposure Control ML20212R5131987-04-20020 April 1987 PNS-i-87-006:on 870420,bomb Threat Received by Monroe County Police Emergency Notification Dispatcher.Security Personnel Posted on Plant Access Roads to Verify Id Prior to Access to Plant.State & Local Police Patrolled Area IR 05000244/19870061987-03-24024 March 1987 Insp Rept 50-244/87-06 on 870224-27.No Violations Noted. Major Areas Inspected:Activities Associated W/Steam Generator Exams & Maint,Inservice Insp & Licensee Actions on Previous Insp Findings IR 05000244/19870051987-03-24024 March 1987 Insp Rept 50-244/87-05 on 870224-27.No Violations Noted. Major Areas Inspected:Status of Previously Identified Items, Organization & Mgt Controls,Training & Qualification of New Personnel,External & Internal Exposure Control & ALARA IR 05000244/19870021987-02-18018 February 1987 Insp Rept 50-244/87-02 on 870104-0207.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Findings, Review of Plant Operations,Operational Safety Verification, Surveillance Testing,Plant Maint & LERs IR 05000244/19870011987-02-0404 February 1987 Insp Rept 50-244/87-01 on 870105-09.No Violations Noted. Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Matl & Contamination & Surveys & Monitoring ML20212M1901987-01-16016 January 1987 Safety Insp Rept 50-244/86-22 on 861215-19.No Violations or Deviations Noted.Major Areas Inspected:Licensee Response to Previous Insp Findings & Effectiveness of Licensee Correction Action Program IR 05000244/19860211987-01-12012 January 1987 Insp Rept 50-244/86-21 on 861109-870103.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Review of Plant Operations,Operational Safety Verification, Surveillance Testing & Plant Maint IR 05000244/19860121986-10-0909 October 1986 Emergency Preparedness Insp Rept 50-244/86-12 on 860826-29. Violation Noted Re Ability to Fully Staff & Augment Emergency Response Organization in Timely Manner IR 05000244/19860131986-10-0202 October 1986 Insp Rept 50-244/86-13 on 860909-11.No Violation Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise Performed on 860910 PNO-I-86-058, on 860729,reactor Manually Tripped from 100% Power Due to Break in Drain Line from Main Steam Reheater 2A to Feedwater Heater 5A.Cause Under Investigation.Licensee Actions Under Review1986-07-29029 July 1986 PNO-I-86-058:on 860729,reactor Manually Tripped from 100% Power Due to Break in Drain Line from Main Steam Reheater 2A to Feedwater Heater 5A.Cause Under Investigation.Licensee Actions Under Review ML20140B0401986-01-0808 January 1986 Exam Rept 50-244/OL-85-23 on 851111-15.Exam Results:All Candidates Passed Both Written & Oral Portions of Exam PNO-I-85-085A, on 851106,licensee Secured from Unusual Event Declared Due to Automatic Actuation of Cable Tunnel Deluge Sys.Caused by Faulty Printed Circuit Card.Ground on Nonvital Bus Damaged by Deluge Sys Corrected1985-11-0707 November 1985 PNO-I-85-085A:on 851106,licensee Secured from Unusual Event Declared Due to Automatic Actuation of Cable Tunnel Deluge Sys.Caused by Faulty Printed Circuit Card.Ground on Nonvital Bus Damaged by Deluge Sys Corrected PNO-I-85-085, on 851106,fire Protection Deluge Sys in Cable Tunnel Automatically Actuated.Smoke Smelled at Scene.Sys Isolated After 10 Minutes of Operation.Visual Insp of Cable Tunnel Revealed No Apparent Damage1985-11-0606 November 1985 PNO-I-85-085:on 851106,fire Protection Deluge Sys in Cable Tunnel Automatically Actuated.Smoke Smelled at Scene.Sys Isolated After 10 Minutes of Operation.Visual Insp of Cable Tunnel Revealed No Apparent Damage IR 05000244/19850201985-10-22022 October 1985 Insp Rept 50-244/85-20 on 850925-27.No Violation Noted.Major Areas Inspected:Emergency Preparedness & Annual Emergency Exercise Performed on 850926 ML20128L0521985-07-18018 July 1985 PNS-I-85-010:on 850718,safeguards Contingency Plan Drill Will Be Held.Exercise Will Test Command/Control, Communications & Response Force Mobilization Developed by State of Ny Emergency Mgt Agency IR 05000244/19850111985-07-11011 July 1985 Exam Rept 50-244/85-11 on 850624.Exam Results:All Candidates Passed.No Generic Deficiencies Noted IR 05000244/19820131982-07-20020 July 1982 IE Insp Rept 50-244/82-13 on 820628-0701.No Noncompliance Noted.Major Areas Inspected:Followup on IE Circular 80-21, Verification of Core load,post-refueling Startup Testing & Control Rod Worth Measurements & Predications IR 05000244/19820111982-06-18018 June 1982 IE Insp Rept 50-244/82-11 on 820517-19.No Noncompliance Noted.Major Areas Inspected:Environ Monitoring Programs for Operation Including Mgt Controls & QC of Analytical Measurements ML20054K9011982-06-16016 June 1982 Notice of Violation from Insp on 820501-31 IR 05000244/19820101982-06-15015 June 1982 IE Insp Rept 50-244/82-10 on 820501-31.Noncompliance Noted: Failure to Properly Implement & Track QA Surveillance Repts ML20236L5201979-10-24024 October 1979 PNS-I-79-005:on 791023,unidentified Male Called Rochester Gas & Electric Corp Switchboard in New York,Stating That Bomb Planted in Ginna Plant in Retaliation for Attempted Murder on Highway 490 ML20249A0931978-01-25025 January 1978 PNO-78-013:on 770125,unit Was Shutdown from 100% Power Due to Leak in One Steam Generator.Licensee Made Decision to Shutdown for Repairs,Although Leak Rate Did Not Exceed TS Limit.State of Ny Informed ML20207G5861977-11-17017 November 1977 PNO-77-201:on 771116,urgent Failure Alarm Occurred on Rod Control Sys,Indicating Logic Problem in CRD Sys.Reactor Shutdown from 100 Percent Power to Cold Shutdown Condition commenced.In-motion of Control Rods Determined Operable ML20236E9101977-08-18018 August 1977 PNS-77-032:on 770816,canoe Capsized W/Two Men Aboard About 100 Feet Offshore Near Plant Discharge Canal to Lake Ontario.One Man Swam Ashore & Climbed Over Security Fence & Called for Help Over Loudspeaker.Other Man Was Rescued ML20151X7111977-07-0606 July 1977 PNO-77-121:on 770705,unit Was Shutdown from 100% Power,Due to Identified Tube Leakage from RCS to Secondary Sys in One of Two Sgs.Outage Duration Expected to Be Two Weeks.Media Interest Expected ML20249B0281976-01-29029 January 1976 PNO-76-018:on 760129,reactor Shutdown Due to Increase Vibration on Two Low Pressure Turbine Bearings.Extent of Problem Not Known.Exam of Bearings Will Be Accomplished During Weekend After Turbine Disassembly ML20236W7901975-12-30030 December 1975 PN-75-157:on 751230,unscheduled Shutdown Completed Due to Increasing Tube Leakage from B Sg.Load Reduction Initiated.Duration of Shutdown Expected to Be Approximately Six Days.State of New York Kept Informed ML20236U2371975-06-18018 June 1975 PN75-037:on 750617,turbine Was Manually Tripped as Result of Excessive Feedwater Piping Vibration.Visual Insp Revealed No Apparent Damage to Pipe Restraints or Containment Penetrations.Some Instrument Sensing Lines Inoperable 1999-09-20
[Table view] |
Inspection Report - Ginna - 1985020 |
---|
|
|
Text
_. -
.
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
Report N /85-20 Docket N License N DPR-18 Priority --
Category C Licensee: Rochester Gas & Electric Corporation 49 East Avenue Rochester, New York 14649 Facility Name:
'
R. E. Ginna Nuclear Power Plant Inspection At: Ontario and Rochester, New York
, Inspection Conducted: September 25-27, 1985 Inspectors: Team Leader, EPS, EP&RPB,
////F/F date W. Cook, Senior Resident Inspector, Ginna Station, DRP, RI J. Stair, DRP, RI S. Hudson, Senior Resident Inspector, Nine Mile Point Unit 1 G. Wehmann, Battelle, PNL J. Martin, Battelle, PNL ,
H. Larson, Ba elle, P L Approved by: /T u LO M'
T. L. HarffsVer, 'hief, Emergency
.
Preparedness y ction, RPB, DRSS, RI, NRC pty Inspection Summary: Inspecti(ti on September 25-27, 1985 (Report N '
50-244/85-20)
Areas Inspected: Routine announced emergency preparedness inspection and observation of the licensee's annual emergency exercise performed on September 26, 1985. The inspection involved 147 inspection-hours by a team of seven NRC and NRC contractor personne Results: No violations were identified, however, concerns were raised regarding the performance of the dose assessment team in the Emergency Operations Facility (EOF).
8511040324 e51030 PDR O ADOCK 05000244 PDR
- . . _ . . _ . ____ _ _ . _ . . _ . _ _ . _ . . . _ _ , _ _ _ . . , _ _ . _ _ . _ -,
.
.--
DETAILS 1. Persons Contacted
- Backus, Technical Assistant to the Operations Manager
, *D. Burke, Corporate Emergency Planner J. Bodine, Nuclear Assurance Manager
. *R. Kober, Vice President, Electric and Steam Production R. Morrill, Training Manager J. Meyer, Superintendent, Support Services o
- B. Snow, Superintendent, Nuclear Production
- S. Spector, Superintendent, Ginna Production The inspectors also interviewed and observed other emergency response personnel during the exercis * denotes those present at the exit interview on September 27, 198 . Emergency Exercise-A full-scale (involving FEMA, state, and local governments) emergency exercise was held at the R. E. Ginna Station on September 26, 1985, from about 6:30 a.m. to 5:00 Pre-Exercise Activities
. Prior to the exercise, the inspector reviewed the exercise objectives and scenario and discussed comments with the license In addition, NRC observers attended a licensee briefing for licensee controllers and observers on September 25, 1985, and participated in the discussion of emergency response actions expected during the various phases of the scenari The exercise scenario included the following events:
- Fire in the Oil Storage Roo *
Dropped control rod and turbine runback to 80% powe .
Reactor fails to trip following manual trip initiation (ATWS).
Fuel cladding failure from ATWS results in high reactor coolant fission product activit *
-Reactor coolant pump seals fail (loss-of-coolant-accident).
High head safety injection pumps fai .
. 3
Reactor core uncovers causing gross fuel cladding failur *
A hydrogen explosion occurs inside containment causing depressurization valves to stick ope The above events caused the activation of the licensee's emergency response facilities and permitted the state and counties to exercise their Emergency Plans, Exercise Observation During the conduct of the licensee's exercise, NRC team members made detailed observations of the activation and augmentation of the emergency organization; activation of the Technical Support Center (TSC), Operations ' Support Center (OSC), Emergency Operations Facility (EOF), and actions of emergency response personnel during the operation of these emerg. enc.y esponse facilities. In addition, periodic observations were made at the flews Media Center, and of
-
plant security and access control. The following activities were observed:
(1) Classification and assessment of scenario events; (2) Direction and coordination of the emergency response; (3) Notification of licensee. personnel and offsite agencies of pertinent information; (4) Communications /information flow, and record keeping; (5) Activation of Emergency Response Facilities; (6) Fire fighting pri.ctices; (7) Performance of offsite and inplant radiological surveys; (8) Assessment and projection of radiological (dose) data and consideration of protective actions;
'(9) Maintenance of security 4nd access control at the EOF; (10) Accountablitt'y'of personnel; (11) Preparation of information for dissemination it the flews Media Center; and .
(12) Management of Accident Recovery Operation .
Y
-
.
.
.
4 Exercise Findings The NRC team noted that the licensee's activation and augmentation of the emergency organization, activation of the offsite emergency response facilities, and actions in use of these facilities were generally consistent with their emergency response plan and implementing procedures. The team also noted the following areas where the licensee's activities were thoroughly planned and efficiently implemente * The objectives and scenario were submitted for review well in advance of the exercis * Emergency response facilities were activated and staffed in a timely manne *
Excellent team work, use of procedures, and good interaction among control room operators were note *
The Technical Support Center (TSC) Manager made timely,
conservative, decisions regarding recommendations to upgrade the emergency classificatio *
Off site survey teams were well trained and equippe * Recovery Manager in the Emergency Operations Facility (EOF)
kept everyone well informed of changing plant conditions through announcements and status board . TSC dose assessment team made an early dose calculation
.(9:25 a.m.) to verify that the current emergency classification was appropriat .
Protective action recommendations were made promptly based on plant condition * A comprehensive recovery plan was outline The following areas were identified and brought to the attention of the licensee as areas which could have degraded their response to an actual event, and which should be evaluated for corrective actio * There was some question as to the required event classification regarding the ATWS among control room operator (50-244/85-20-01).
- The TSC and-EOF did not update offsite agencies regarding plant conditions from about 9:00 a.m. - 10:50 a.m. (50-244/85-20-02).
>
.
.
.
-
The fire brigade captain and another me.aber did not respond with self-contained breathing equipment (SCBA) as require The fire brigade brought only one spare air bottle for SCBA's and ran out of air before entr The fire brigade did not check adjacent rcoms for involvement untti requested to do so by the control room. (50-244/85-20-03)
Dose Assessment
-
Prior to the release from the containment, the EOF dose assessment team did not perform any dose projection calculations based on the known source ter An error by the MIDAS computer operator inputting release rate data, resulted in an error of 10' which was promptly identified as erroneous, but a half-hour was lost in correcting the erro The EOF dose assessment team did not efficiently manage the offsite monitoring teams to obtain meaningful plume information in a timely manne '
-
The EOF dose assessment team did not stay current with changing plant conditions. The source term status board was not updated during the release. Available information was not utilized to characterize the source term in the containment prior to the releas Although appropriate protective actions were recommended based on plant conditions rather than dose assessment, the lack of effectiveness of the EOF dose assessment function is of concern. Had it been necessary to rely on prompt, accurate dose assessment data to determine appropriate protective actions, unacceptable delays may have resulted. The licensee has been requested to provide a written response within 30 days of receipt of this report, describing proposed improvements in this area. (50-244/85-20-05)
3. Exit Interview A meeting was held with the licensee at the conclusion of the inspection on September 27, 1985, to discuss the findings from the exercise observation as detailed in this repor '
No written material was provided to the licensee by the inspectors at any time during this inspectio