IR 05000237/1991001

From kanterella
Jump to navigation Jump to search
Final SALP Repts 50-237/91-01 & 50-249/91-01 for May 1990 - Jul 1991
ML17174A956
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 07/31/1991
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17174A954 List:
References
50-237-91-01-01, 50-237-91-1-1, 50-249-91-01, 50-249-91-1, NUDOCS 9111110377
Download: ML17174A956 (3)


Text

.

>

FINAL SALP REPORT *

U.*S. NUCLEAR REGULATORY COMMISSION.

REGION III

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANC Inspection Report Nos. 50-237/91001; 50-249/91001 9111110377 911104 PDR. ADOCK--0-500023-7----

Q

.

PDR Commonwealth Edison Company Dresden Nuclear Power Station May 1, 1990, through July 31, 1991 Enclosure 1 SALP '10

Enclosure 1 Dresden Nuclear Power Station Summary of Meeting with Commonwealth Edison Company on October 31, 1991 The findings and conclusions of the SALP Bo~rd are docum~rited in Reports No. 50-237/91001; No. 50-249/91001 and were discussed with the licensee on October 31, 1991; at Dresden Nuclear Power Statio WhJle the meeting w~s primarily a discussion between the licensee and NRC,_ it was ~pen to members of the public as observer The following license~. and NRC personnel. were in attendance, a~ well as the ~oted obs~rv~r Commonwealth Edison Company B. Thomas*

C. Reed 0. Galle

  • N. Kalivianakis J. Een i genburg C. Schroeder Nuclear Regulatory Commission A. Davis J. Z WO li n Ski E. Greenman R. Barrett W. Shafer B.. Burgess B. Siegel *

W. Rogers *

D. Hill M. *Peck Other R. Zuffa *

President Senior Vice President Vice ~resident -

BWR Operati6ns General Manager - BWRs

  • *

Plant Manager Production ~uperintenderit, LaSalle Regional Administrator, Region III

  • Assistant Directorj Division of Reactor Project~. NRR

Dir*ector, Division of reactor Projects NRR Director, Project Directorate III-2 Branch Chief, Branch 1 Chief, Project lB P~oject Manager, NRR Senior Resident Inspector Resident Inspector Resid~nt Inspector Resident Engineer, Illinois Department of Nuclear Safety

, '* * Enclosure 1 C6mments R~ceived from Licensee tommonwealth Edison Company's respon~e to the Dresden N~clear Power Plant Initial SALP 10 Report dated October 4, 1991, had no comments requiring

  • revision to the specific. content of the repor Because there is n r~vision~ the Initiai SALP Report is considered the ~inal SALP Repor