IR 05000237/1991030

From kanterella
Jump to navigation Jump to search
Amended Page 7 to Insp Rept 50-249/91-32,reflecting Deletion of Ref to Insp Repts 50-237/91-30 & 50-249/91-39 Which Have Been Canceled
ML17174B054
Person / Time
Site: Dresden Constellation icon.png
Issue date: 12/18/1991
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17174B053 List:
References
50-249-91-32, NUDOCS 9112240137
Download: ML17174B054 (3)


Text

Docke~ No. 50-249 License N DPR~25 EA 91-165 Dt.C l 8 199\\

.*Commonwealth Edison *company.

. ATTN:

Mr. Cordell Reed Senior Vica President Opus West III

.1400 Opus Place Downers Grove, IL 60515 SUBJECT:. CHANGE TO NRC INSPECTION REPORT NO. 50-249/91032(DRS)

Enclosure:.,Page 7 of

Inspection Report

No. 50-249/91032{DRS)

Sincerely,

Hubert J. Miller, Director

Division of Reactor Safety

See Attached Distri~ution

RIII. *

(j'N\\J..1:,(

  • Phillips

. 12/l\\p /91

RIII

VW'

Martin

12/\\\\c /91

9112240137 911218

PDR

ADOCK 05000249 PDR

Rlrlf,f

'f':Vi~*,)

1t!a

B.'-*,.; urgess

12/ tlv /91

RIII

See Previous Page

Miller

12/ /91

RIII

<)MJ.;r

Wright

12/ /ip/91

.

'.. _;*

. ;. ~

I..

.,

Commonwealth Edison Company

Distribution

cc w/enclosure:

D. Galle, Vice President -

BWR

Operations

~-

Kovach, Nuclear

Licen~irig Manager

c. Schroeder, Station Manager

DCD/DCB (RIDS)

OC/LFDCB

Resident-Inspectors LaSalle,

Dresden, Quad Cities

Richard Hubbar J. w. Mccaffrey, Chief, Public

Utilities Division

. Robert Newmann, Office of Public

Coun~el, ~tate -0f Illinois Center

Licensing Project.Manager, NRR

B. Berson, Regiofial*counsel~ RIII

J. Liaberman, OE

~. Goldberg, OGC

J. Partlow, NRR * *

DEC l. 8 1991

~-

pending detailed inspections of the fuel handling

  • equipment for missing part Initial inspections of

the spent fuel racks and the upper tie plates of the

affected fuel bundles did not identify. additional

damage or loose parts from the mas:t/grappl *

.

.

.

.. An assessment of fuel assembly damage was conducted by

the _fuel vendor, who confirmed fuel integrity *. The

. fuel bundles* with the damaged bail handles were thrice-

burned assemblies which.were to be used for Unit 3

reloa While these bundles will not be reused in 'the

reactor, they need to be moved from their current

locati.ons in *the SFP since they appear to *obstruct

removal of adjacent bundles required for reload. *The

Unit 3 cor~ reload design was being revised to replace

the two damaged assemble *

NRC review of the -licensee's completed corrective actions

and response to the CAL will be addressed in subsequent NRC

Resident inspection reports *

. Exit Meeting

The inspector met ~ith licensee representatives (denoted in

  • Paragraph 1) on November 12, 199 The inspector summarized *

the purpose~ sc6pe, and findings of the inspection and the

likely informational content of the. inspection repor The

licensee acknowledged this information and did not identify

.. any information as. proprietar *

.,.

7