IR 05000237/1991030
| ML17174B054 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 12/18/1991 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML17174B053 | List: |
| References | |
| 50-249-91-32, NUDOCS 9112240137 | |
| Download: ML17174B054 (3) | |
Text
Docke~ No. 50-249 License N DPR~25 EA 91-165 Dt.C l 8 199\\
.*Commonwealth Edison *company.
. ATTN:
Mr. Cordell Reed Senior Vica President Opus West III
.1400 Opus Place Downers Grove, IL 60515 SUBJECT:. CHANGE TO NRC INSPECTION REPORT NO. 50-249/91032(DRS)
Enclosure:.,Page 7 of
Inspection Report
No. 50-249/91032{DRS)
Sincerely,
Hubert J. Miller, Director
Division of Reactor Safety
See Attached Distri~ution
RIII. *
(j'N\\J..1:,(
- Phillips
. 12/l\\p /91
RIII
VW'
Martin
12/\\\\c /91
9112240137 911218
ADOCK 05000249 PDR
Rlrlf,f
'f':Vi~*,)
1t!a
B.'-*,.; urgess
12/ tlv /91
RIII
See Previous Page
Miller
12/ /91
RIII
<)MJ.;r
Wright
12/ /ip/91
.
'.. _;*
. ;. ~
I..
.,
Commonwealth Edison Company
Distribution
cc w/enclosure:
D. Galle, Vice President -
Operations
~-
Kovach, Nuclear
Licen~irig Manager
c. Schroeder, Station Manager
DCD/DCB (RIDS)
OC/LFDCB
Resident-Inspectors LaSalle,
Dresden, Quad Cities
Richard Hubbar J. w. Mccaffrey, Chief, Public
Utilities Division
. Robert Newmann, Office of Public
Coun~el, ~tate -0f Illinois Center
Licensing Project.Manager, NRR
B. Berson, Regiofial*counsel~ RIII
J. Liaberman, OE
~. Goldberg, OGC
J. Partlow, NRR * *
DEC l. 8 1991
~-
pending detailed inspections of the fuel handling
- equipment for missing part Initial inspections of
the spent fuel racks and the upper tie plates of the
affected fuel bundles did not identify. additional
damage or loose parts from the mas:t/grappl *
.
.
.
.. An assessment of fuel assembly damage was conducted by
the _fuel vendor, who confirmed fuel integrity *. The
. fuel bundles* with the damaged bail handles were thrice-
burned assemblies which.were to be used for Unit 3
reloa While these bundles will not be reused in 'the
reactor, they need to be moved from their current
locati.ons in *the SFP since they appear to *obstruct
removal of adjacent bundles required for reload. *The
Unit 3 cor~ reload design was being revised to replace
the two damaged assemble *
NRC review of the -licensee's completed corrective actions
and response to the CAL will be addressed in subsequent NRC
Resident inspection reports *
. Exit Meeting
The inspector met ~ith licensee representatives (denoted in
- Paragraph 1) on November 12, 199 The inspector summarized *
the purpose~ sc6pe, and findings of the inspection and the
likely informational content of the. inspection repor The
licensee acknowledged this information and did not identify
.. any information as. proprietar *
.,.
7