Insp Repts 50-220/91-05 & 50-410/91-05 on 910211-15.No Violations Noted.Major Areas Inspected:Radioactive Liquid & Gaseous Effluents Monitoring & Radiological Environment Monitoring Programs
ML17058A670
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 03/08/1991
From: Bores R, Jang J, Peluso L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17058A669 List:
References
50-220-91-05, 50-220-91-5, 50-410-91-05, 50-410-91-5, NUDOCS 9103220083
Download: ML17058A670 (18)


Text

U.S.

NUCLEAR REGULATORY COMMISSION

REGION I

Report Nos. 50-220/91-05

~5-44 91-55 Docket Nos.

50-220 50-410 License Nos.

DPR-63

~PF-69 Licensee:

Nia ra Mohawk ower Cor oration 301 Plainfield Road S racuse New York 13212 Facility Name:

Nine-Mile Point Units 182 Inspection At: Scriba New York Inspection Conducted:

Februar 11-15 1991 Inspectors:

L. Peluso, Radiation Specialist, Effluents Radiation Protection Section (ERPS)

date J.

Jang, ior Ra iati on Speci al ist, ERPS da e

Approved By~.

Bores, ref, ERPS, Facilities Radiological Safety d Safeguards Branch, Division of Radiation Safety and Safeguards date Ins ection Summar

Ins ection on Februar 11-15 1991 Combined Ins ection Re ort Nos.

50-220 91-05 50-410 91-05 Areas Ins ected:

Routine, announced inspection of the radioactive liquid and gaseous effluents monitoring and radiological environmental monitoring programs including: management controls, audits, quality assurance, and implementation of the above programs.

Results: Within the scope of this inspection, no violations were identified.

The licensee was implementing an excellent radiological environmental monitoring program.

With regard to the effluent control program, the recent management commitment and initiatives to improve the operability of liquid and gaseous effluent monitors were noteworth.0 Individuals Contacted DETAILS 1.1 Licensee Personnel

  • W. Allen, HATS Radiation Assessment Hanager J. Blasiak, Chemistry Hanager, Unit 2 J. Burton, Supervisor, guality Assurance Audits
  • H. Carson, Regulatory Compliance
  • J. Conway, Hanager, Technical Support, Unit 2
  • G. Corell,'anager, Chemistry, Unit

H. Cu'mmins, 18C Supervisor, Unit 2

  • K. Dahlberg, Plant Hanager, Unit
  • H. Flanagan, Supervisor, Environmental Protection
  • T. Galletta, Environmental Protection Coordinator-Heteoro T. Kurtz, Supervisor, Chemistry, Unit 2 B. Langille, Radiological Engineering Supervisor, Unit 2
  • E. Leach; Sr.

General Specialist-Chemistry

  • M. HcCormick, Plant Hanager, Unit 2
  • J. Pavel, Licensing Engineering.
  • J. Ryan, Site Engineering
  • C. Senska, Supervisor Chemistry, Unit
  • R. Smith, Hanager, Training
  • P. Swafford, Radiation Protection Hanager, Unit 2
  • E. Thomas, Associate Health Physicist
  • K. Thomas, Supervisor, Site Licensing
  • B. Thomson, Radiation Protection Hanager, Unit
  • D. White, Site Licensing
  • C. Widay, Supervisor, gA Surveillance
  • S. Wilczek, Jr.,

Yice President, Nuclear Support

  • B. Zacharek, Environmental Protection Coordinator-Radiolo 1.2 New York Power Authorit NYPA logical gical B.

Gorman, Environmental Supervisor 1.3 NRC Personnel

  • W. Cook, Senior Resident Inspector
  • J. Linville, Chief, Projects Branch No. 1
  • R. Temps, Resident Inspector
  • Denotes those present at the exit interview on February 15, 1991. Other licensee employees were contacted and interviewed during this inspectio.0

~Pur ose The purpose of this routine inspection was to review the licensee's programs in the following areas.

The licensee's ability to conduct the Radiological Environmental Monitoring Program (REHP)

and the Meteorological Honitoring Program.

The licensee's ability to implement liquid and gaseous radioactive effluent control programs during normal and emergency operations.

3.0 Audits The inspector reviewed the following licensee's gA audit reports to determine the scope and depth of the licensee's self-assessment of the implementation of the REHP and radioactive effluent control programs.

gA/SRAB Audit 90016 RG/IN, "Radiological and Chemistry Controls",

November 26-December 17, 1990 gA/SRAB Audit 89023 RG/IN, "Chemistry and Radiation Management",

January 11-25, 1990 1989 SRAB Audit K, "Offsite Dose Calculation Manual (ODCH)"

These audits were conducted by the licensee's guality Assurance Department in the areas of REMP, ODCM, and radioactive liquid and gaseous effluent control programs.

All audits appeared to cover the stated objectives and to be of excellent technical depth to assess the licensee's radioactive effluent control programs and the REHP.

There were no audit findings but there were 27 observations (recommendations),

none of which had any safety significance.

The appropriate department responded to these observations in a timely manner.

No violations were identified.

4.0 Radiolo ical Environmental Monitorin Pro ram 4.1 Or anizational Chan es The inspector reviewed the licensee's organization for the management of the REMP and discussed any changes made since the last inspection of this area.

The inspector determined that there were no significant changes in the REMP since the inspection conducted on December 11-15, 198.2 Direct Observations The inspector examined selected environmental sampling stations.

These stations included all the air particulate and iodine'onitoring stations, a milk sampling location and a number of thermoluminescent dosimetry (TLD) stations for di'rect ambient radiation measurements.

.All the air monitoring equipment was operable and was in calibration at the time of the inspection.

TLDs were placed at their designated locations, and the milk sampling station was also at the location designated by the Offsite Dose Calculation Hanual.

4.3 Review of Annual Re ort The inspector reviewed the Annual Radiological Environmental Report for 1989 as well as the available 1990 analytical data for the REHP.

The report provided a comprehensive summary of.the analytical results of the REHP around the Nine Mile Point and FitzPatrick site and met Technical Specification requirements.

Records of the analytical results for 1990 indicated that all samples were taken as required and the lower limits of detection (LLDs) specified in the licensee's Technical Specifications were met.

No anomalous data were noted.

4,4 Im lementation of the REMP The inspector reviewed the following procedures as part of the examination of the implementation of the REMP as described in the Technical Specifications.

o S-ENVSP-4 1989

"Environmental Air Station Inspection and Sample Collection" o S-ENVSP-5 1988

"Analysis of Environmental Samples" o S-ENVSP-7 1987

"Calibration'f Environmental Monitors" The above procedures included requirements for sampling techniques for various environmental sample media, sampling frequency, maintenance and calibration records of air samplers, and the land use census.

Based on the above reviews and discussions with the licensee's representatives, the inspector determined that the licensee implemented the REMP effectively.

The Nine Hile Point station conducts the REHP program in cooperation with the New York Power Authority's (NYPA) James A. FitzPatrick (JAF)

Generating Station.

The environmental. samples collected by the l.icensee and the contractor, Ecological Analysts Science and Technology were sent to JAF Environmental Radiation Laboratory (JAF-ERL) for analyses.

The TLDs and milk samples for strontium 89/90 analyses were sent to Teledyne

Isotopes for analyses.

The licensee stated however,. that JAF-ERL will assume responsibility for analyzing the environmental TLDs in the near future.

The inspector toured the.JAF-ERL where the environmental samples were analyzed.

The laboratory was equipped with five germanium counting systems, two low-level alpha/beta counters and a liquid scintillation counter.

The inspector reviewed quality control (gC) charts including those for efficiency and resolution checks.

Calibration records.for the counting equipment and the gA schedule for 1990 and 1991 were also examined.

The gA control charts and calibration of the counting equipment appeared to be within the JAF-ERL's set criteria and sampling appeared to be performed according to the gA schedule.

The results for the interlaboratory -and intralaboratory comparisons were compiled in the Annual JAF/Nine Hile Point Plant Environmental Laboratory gA Report, which had been provided to Nine Hile Point for review.

The results examined by the inspector were determined to be within the licensee's acceptance criteria.

The JAF-ERL also participates in the Environmental Protection Agency's cross-check program.

Upon review of the results, the inspector determined that the JAF-ERL results were in good agreement with the EPA.

Based on the above reviews, the inspector determined that the licensee was implementing an excellent program for the REHP.

No violations were identified in this area.

5.0 Heteorolo ical Honitorin Pro ram The inspector reviewed the licensee's meteorological monitoring program to determine whether the instrumentation a'nd equipment were operable, calibrated, and maintained.

Calibrations were performed semiannually as required by the Technical Specifications and the system checks were performed on a weekly basis.

The inspector reviewed the most recent calibration results for wind speed, wind direction, temperature, and delta temperature.

All calibration results were within the licensee's acceptance criteria.

The licensee also performed comparisons of indicated monitoring results for various parameters between the meteorological equipment room and the control rooms.

The inspector reviewed the analog chart recorders and computer data in the meteorological equipment room, as well as those in control rooms, Units 1 and 2, and determined that the comparisons were in good agreement.

Based on the above reviews, the inspector determined that the licensee implemented an effective meteorological monitoring program.

No violations were identifie r

6.0

Radioactive Li uid and Gaseous Effluent Control Pro rams 6.1 Pro ram Chan es 6.2 Due to a recent reorganization effective in September 1990, the inspector reviewed the site organization chart to determine the effectiveness for administration of the radioactive liquid and gaseous effluent control programs.

The major change of the reorganization was to divide the responsibility between Units 1 and 2.

Each unit now had responsibility to perform the effluent control program at its respective unit, including chemistry, radiation protection, maintenance (IKC), and radwaste operations.

Calibrations of effluent/process radiation monitors were performed by chemistry, maintenance, and radiation protection staff at each unit.

Radioactive liquid and gaseous releases were performed by chemistry and radwaste operations.

Preparation of the radioisotope standards for the calibration, effluent sample analyses, and semiannual effluent reports were performed by the Chemistry Department.

Managers of Chemistry, Operations, Radiation Protection, and Naintenance of each unit reported to the Vice President, Nuclear Generation through the Unit Plant Hanager.

Based on the review of the new organization, the inspector determined that the reorganization did not reduce responsibility to conduct the

. effluent control programs.

In fact, it appeared to enhance the performance relative to the management of the effluent control programs.

Review of Semiannual Effluent Re orts 6.3 The inspector reviewed the Semiannual Effluent Reports for the second half of 1989 and the first half of 1990 for both units.

These reports provided total released radioactivity for liquid and gaseous effluents, including projected radiation dose to the public as required.

The inspector also noted that the licensee reported inoperable effluent monitors in the Semiannual Effluent Reports as required by the Technical Specifications.

No violations were identified.

Radioactive Li uid and Gaseous Effluent Controls The inspector reviewed the licensee's procedures as part of the determination of the implementation of the following Technical Specification (TS) requirements for both units.

o Unit 1, TS 3/4.6. 15, "Radioactive Effluents (Liquid and Gaseous)"

o Unit 2, TS 3/4. 11. 1, "Liquid Effluents" TS 3/4. 11.2,

"Gaseous Effluents"

o Units

8 2, "Offsite Dose Calculation Manual (ODCM)"

The inspector also reviewed selected liquid and gaseous discharge permits including sampling frequencies, analytical data, dose assessment results, and appropriate procedures for both units.

The inspector noted that the licensee followed procedures to comply with the above Technical Specification requirements.

During this inspection, the inspector performed dose calculations using the ODCH while the licensee used separate procedures at each unit to perform the calculations.

The licensee's procedures were established to comply with the ODCN requirements.

Total body doses for liquid effluents and gamma air dose for gaseous effluents were calculated and results were compared.

The results for both units indicated an excellent agreement with the inspectors calculations.

Based on the above reviews including dose calculation comparisons, the inspector determined that the licensee conducted a very good liquid and gaseous effluent control programs.

No violations were identified.

6.4 Calibration of Effluent Process Radiation Monitors Unit 1:

The inspector reviewed the most recent calibration results for both units as part of the determination of the implementation. of the Technical Specification requirements for the following monitors.

o Liquid Radwaste Effluent Monitor o Service Water Effluent Monitor o Stack Gaseous Effluent Monitor o Hain Steam Line Monitors o Emergency Condenser Vent Monitor o Offgas Radiation Monitor o Radwaste Discharge to Tunnel Radiation Monitor Unit 2:

o Liquid Radwaste Effluent Line Monitor o Cooling Tower Blowdown Line Monitor o Service Water Effluent Line Liquid Monitor o Main Steam Line Monitors o Radwaste/Reactor Building Vent Monitor o Hain Stack Gaseous Effluent Monitor o

RHR Heat Exchange Service Water Monitor During the review of calibration results of the above effluent and process monitors, the inspector noted that the calibrations were performed at the frequency required and the results were within the licensee's acceptance criteria.

The inspector also reviewed quarterly

channel function tests for the Radwaste and'Reactor Building Vent, and Hain Stack Gaseous Effluent Monitors, and source checks for several monitors for Unit 2. Quarterly channel function tests and source checks were found to meet or exceed the Technical Specification'equirements.

Based on the above review, the inspector determined that the licensee conducted an excellent monitor calibration program.

No violations were identified in this area.

6.5 0 erabilit of Effluent Monitors During the previous inspection (Combined Inspection Nos. 50-220/89-34 and 50-410/89-23)

conducted in December 1989, the inspector evaluated the status of inoperable effluent monitors for both units.

The inspector concluded that the lead times for repairs seemed indicative of inadequate management attention to this important area.

The licensee had many inoperable effluent monitors prior to the inspection.

During this inspection, the inspector reviewed the operability of liquid and gaseous effluent monitors for both units, as well as the Special Report (Unit 2) submitted to the NRC on February 4,

1991.

This 'Special Report contained information regarding inoperability of the Unit 2 Gaseous Effluent Monitoring System (GENS).

The cause for the recent inoperability of the GEMS instrumentation was determined to be a

lightning strike to the Hain Stack, which led to multiple component failures within the GEMS.

This GENS was repaired and operable at the time of this inspection.

The inspector examined the GEMS to verify the corrective actions, including grounding modifications to prevent lightning strike and operability.

The inspector noted that all liquid and gaseous effluent monitors for both units were operable at the time of inspection, with exception of the Unit 2 Service Water Effluent Monitor, which was out of service for modification.

Based on the reviews, the inspector determined that the licensee had initiated a good program to ensure the operability for effluent monitors.

The inspector also noted that the licensee had recently assigned personnel who had good technical knowledge and were now using tools (trending analysis)

to better maintain the operability of effluent monitors.

The recent management commitments and initiatives to maintain the operability of effluent monitors were noteworthy and should be continued.

7.0 Air Cleanin S stems The inspector reviewed the licensee's most recent inspection and test results in examining the implementation of the following Technical

Specification (TS) requirements for both units.

Unit 1:

Unit 2:

TS 3/4.4.4,

"Emergency Ventilation Systems" TS 3/4.4.5,

",Control Room Air Treatment System" TS 3/4.6.5.3,

"Standby Gas Treatment System" TS 3/4.7.3,

"Control Room Outdoor Air Special Filter Train System" The inspector determined that these systems were being maintained in accordance with the requirements.

The inspector also reviewed the following inspection and test results.

o Visual Inspections o In-Place Leak Tests for HEPA o In-Place Leak Tests for Charcoal'

Pressure Drop Tests o Air Capacity Tests o Laboratory Tests for the Iodine Collection Efficiency The above test results reviewed by the inspector were within the Technical Specification requirements.

No violations were identified.

8.0 Exit Interview The inspector met with licensee representatives (denoted in Section 1.1)

at the conclusion of the inspection on February 15, 1991.

The inspector summarized the purpose, scope, and-.findings of the inspection.