IR 05000220/1980012

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-220/80-12 on 800922-26.No Noncompliance Noted.Major Areas Inspected:Physical Security Plan Implementation.Details Withheld (Ref 10CFR2.790)
ML19345D922
Person / Time
Site: Nine Mile Point 
Issue date: 10/23/1980
From: Bailey R, Devlin J, Matthew Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19345D921 List:
References
50-220-80-12, NUDOCS 8012220069
Download: ML19345D922 (1)


Text

._

_____

_ _.__

_ _ _

_.

. _..

.__

_ _ _. _ _ _

_.

_._.

O U. S. NUCLEAR REGULATORY CCMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT

.

-

REGION I

,

!

Report No.

50-220/80-12

'

Docket No.

50-220 License No.

OPR-63 Safeguards Group

j Licensee:

Niacara Mohawk Power Corooration 300 Erie Boulevard, West Syracuse, New York 13202 Facility Name:

Nine Mile Point, Unit #1 Inspection At:

Scriba, New York Inspection Conducted:

September 22-26, 1980 Date of Last Physical Security Inspection Visit:

June 23-27, 1980

,

Type of Inspectio :

Routine, Urannounced, Physical Security Inspectors:

/ de ([If

// /#'d

/

4t. J. Bailey,g hysical S4curity Inspect.or date

'

.

.

SL uh' /Yh

?d M. Smitn, HQ fi;RC (IE) Secut ity Specialist date

/

!

I i

date

Approved by 4b t. "

M(

_. ~

/J.W. Devlin, Chief,SecurityandInvestigation date

.A ection, Safeguards Branch

Insoection Summary:

Physical Security Inspection on Seotember 22-26, 1980 (Report No. 50-220/80-12)

,

Areas Inspected:

Routine, unannounced inspection by one regional based inspector

'

and a HQ Security Specialist of the implementation of the approved Physical Security Plan relative to Security Program Audit, Security Organization, Physical Barriers (PA/VA), Lighting, Access Control (PA/VA), Alarm Stations, Detection Aids, Assessment Aids, Communications Testing and Maintenance, Compensatory Measures, Response, Locks, Keys and Combinations and Records and Reports.

Followup on previous items of noncompliance related to physical security.

The inspection' involved 72 inspector-hours on site by two NRC inspectors.

The inspection was begun during regular hours; 6 inspection hours were accomplished during offshift periods.

Results:

The licensee was found to be in compliance with NRC requirements within the 21 areas examined during the inspection.

.

Region I Form 167 (August 1979)

g

.- - -. - -. - - -.. - -,

-.. -. - -. -

-..

.

- -. - -.

-

- _ _ _.