IR 05000213/1981004
| ML20030B507 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 08/03/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W CONNECTICUT YANKEE ATOMIC POWER CO. |
| References | |
| NUDOCS 8108180222 | |
| Download: ML20030B507 (2) | |
Text
-
'
EfMLCSUICS TRANZf 11i TED HEE //iTH
'
~
.,
,
CONTAIN 10 CFR 2.790 INFORMATION
__
3 AUG 1981 Docket No. 50-213 Connecticut Yankee Atomic Power Company (s
%
F H,1 ATTN:
Mr. W. G. Counsil s
Vice President - Nuclear b
f j
\\
'
Engineering and Operations jU P. O. Box 270 84 M[d1 7198 % -2
,
'
Hartford, Connecticut 06101 u.a.
k
Gentlemen:
"
Subject:
Inspection 50-21'/81-04 m
Thi. refers to the routine physical protection inspection conducted by Mr.
R.H. Ladun of this office on April 27-May 1,1981 at the Haddam Neck Nuclear Power Station, Haddam Neck, Connecticut of activities authorized by NRC License No. DPR-51 and to the discussions of our findings held by Mr. Ladun with Mr. R. Graves of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
Within the scope of this inspectio;i, no items of noncompliance were observed.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, documentation of findings of your control and accounting procedures for safeguarding special nuclear materials and your facility security measures for physica' protection are deamed to
'
be commercial or financial information within the meanii.g of 10 CFR 9.5(a)(4)
and shall be subject to disclosure only in accordance with the provisions
.
of 10 CFR 9.12; therefore, the enclosed inspection report will n_ot be placed in the Public Document Room and will receive limited distribution.
)R1:DETI k.
JO
,<0
'
- Qn I R1:DETI R1:DETI
.
Ladun/wb b Devlin runner Joyner
'
5/29/81 7/M/81 7/3//81 7/11/81 fA'.
i 7/u/$/
OFFICIAL RECORD COPY
.
M"g$V i
g
.
8108180222 81cso3 -
ggulTTED HEpe!/lTH PDR ADOCK 05000213 Rf0 CFR 2.790 INFORMM G
_.
-
.___
_._- _
_
_
-,.
_ _ - _ _
ENCLOSURES TRANSMITTED HERE','llTH
.
CONTAIN 10 CFR 2.790 INFORMATl014
~
~
'
'.
-
~.
y Connecticut Yankee Atomic Power Company
' 3 NJG 1981 No reply to this letter is required; however, should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/
.
.
.-
w Eldon J. Brun
,ief, Projects Branch #1, Division of Resident and Project Inspection Enclosure: Office of Inspec'. ion and Enforcement Inspection Report Number 50-213/81-04 (Contains 2.790(d) Information)
cc: (with copy of report cover sheet only)
R. Graves, Plant Superintendent D. G. Diedrick, Manager of Quality Assurance J. R. Himmelwright, Licensing Safeguards Engineer Public Document Room (PDR)
Local Public Document Room (LPDR)
Nucle'.r Safety Information Center (NSIC)
State of Connecticut bcc:
Region I Docket Room (with concurrences) (w/ cy of encl)
NRC Resident Inspector (w/ cy of encl)