IE Insp Rept 50-213/81-10 on 810816-21.No Noncompliance Noted.Major Areas Inspected:Security Organization Re Physical Barriers & Access Control.Details Withheld (Ref 10CFR2.790)
ML20039F332
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/30/1981
From: Cogan N, Devlin J, Ladun R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20039F330 List:
References
50-213-81-10, NUDOCS 8201120350
Download: ML20039F332 (2)


Text

x.

.

I U.S. NUCLEAR REGULATORY COMMISSION OFFICE 0F INSPECTION AND ENFORCEMENT Region I Report No. 50-213/81-10 Safeguards Group ~IV Docket No. 50-213 License No. DPR-61 Category C

Licensee:

Connecticut Yankee Atomic Power Company P.O. Box 270 Hartford, Connecticut 06101 Facility Name:

Haddam Neck Nuclear Power Station Inspection At:

Haddam Neck, Connecticut Inspection Conducted:

August 16-21, 1981 Date of Last Physical Protection Inspection:

April 27-May 1, 1981 Type of Inspection:

Routine, Unannounced Physical Protection Inspectors:

f//.

.In)

//-de-//

i

'R.H. Ladun, Physical Protection Inspector date signed k

lh'~ ?Y M

N 0./Coga n Phys cal Protection Inspector date signed Approved By:

//

wCdv

//!b [!

[J.K. ~ Devlin, Chief, Physical Protection dat4 signed vSection, Technical Inspection Granch Inspection Summary:

Routine Inspection on August 16-21, 1981 (Report No. 50-213/81-10)

Areas Inspected:

Security Plan; Security Organization; Physical Barriers (Protected Area); Physical Barriers (Vital Areas); Lighting; Access Control (Identification, Authorization, and Badging); Access Control (Search); Access Control (Vital Areas); Access Control (Escorting); Detection Aids; Alarm Stations; Assessment Aids; Communications; Testing and Maintenance; Com-pensatory Measures; Response; Locks, Keys and Combinations; Records and Reports. The inspection involved 70 inspector hours onsite by two NRC regional based inspectors. The inspection was initiated during an offshift period; 6 inspector hours were accomplished during offshift periods.

Results: The licensee was found to be in compliance with NRC requirements in all 18 functional areas examined.

THE INFORMATION ON THIS PAGE IS DEEMED TO BE APPROPRIATE FOR PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.790.

10 CFR 2.790 INF0FJJ!ATION S-F1 -81 -142 Copy d'

of

[ Copies 8201120350 811231

--,,.,

,... _ _ _ _ _ _ _....

_

PDR ADOCK 05000213 4. Pages G

PDR

_.

-

-