IE Insp Rept 50-213/80-10 on 800519-23.No Noncompliance Noted.Major Areas Inspected:Security Plan,Security Organization & Protected & Vital Areas Physical Barriers. Details Withheld (Ref 10CFR2.790)
ML19321A440
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/02/1980
From: Devlin J, Ladun R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19321A436 List:
References
50-213-80-10, NUDOCS 8007230366
Download: ML19321A440 (1)


Text

-.

l

.

.

_

%,f U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 50-213/80-10 Docket No. 50-213 SAFEGUARDS GROUP IV License No. DPR-61 Priority Category C

Licensee:

Connecticut Yankee Atomic Power Company

.

P.O. Box 270

'

Hartford, Connecticut 06101 Facility Name:

Haddam Neck Nuclear Power Station Inspection at:

Haddam Neck, Connecticut Type af Inspection:

Routine, Unannounced Physical Security Inspection conducted:

May 19-23, 1980 Date of Last Physical Security Inspection:

January 8-11, 1980 x.2/ 8 )u

$ yo-80 Inspectors:

/

R. H. [(d'un, Phy5ical Security Inspector date signed date signed date signed

.

Approved by:

-

[

![h

. W. Devlin, Chief, Security Section, ffate' si gned Safeguards Branch Inspection Summary:

Areas Inspected:

Security Plan; Security 0.rganization, Physical Barriers Protected Area); Physical Barriers (Vital Area); Lighting; Access Control (Identification, Authorization, Badging); Access Control (Search); Access Control (Escorting); Access Control (Vital Area); Detection Aids; Alarm Stations; Assessment Aids; Communications; Testing and Maintenance; Compensatory Measures; Power Supply; Response; Locks, Keys and Combinations; and Records The inspection involved thirty four (34) y identified items of noncomplianc and Reports. Also a followup on previousl inspector-hours onsite by one NRC Regional based inspector. The inspection was initiated during non-regular working hours, five (5) inspection hours were accomplished during offshift l

periods.

Results: The licensee was found to be in compliance with NRC requirements in all nineteen (19) areas examined.

l l

Region I Form 12

.

(Rev. April 77)

l 8007230386

)