Text
_
.
80051503(p0
-
.
k
'
U.S. NfjCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I 0-213/80-03 Report No.
0-213 Docket No.
C
~
~~
License No.
Priority Category Licensee:
Connecticut Yankee Atomic Power Company P. O. Box 270 Hartford, Connecticut 06101 Haddam Neck Plant Facility Name:
Inspection at: Haddam Neck, Connecticut Inspection conducted: February 20-22, 1980 Inspectors:
Y/ 8 6, cf/2//fC g
w f.H. Smit ('ReactorInspector date signed
$28?O, 3/e//60
_
s.+
D. F. Johffs' tin, R(actor Inspector date signed date signed Approved by: / / [ M,,3 c9/.v///o
.h T!. R. Keim*(,' Chi (f, Reactor Projects date signed Section No.1, R0&NS Branch Inspection Summary:
Inspection on February 20-22,1980 (Report No. 50-213/80-03)
Areas Inspected:
Routine, unannounced inspection by two region based inspectors (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) of plant operations and review of monthly operating reports received in the RI office.
Resul ts: No items of noncompliance were identified.
Region I Form 12 (Rev. April 77)
_ _.
_
-
.
-.
...
....
__
-
-
<
\\
,
i DETAILS
,
1.
Persons Contacted
- .1. Feruson, Station Services Superintendent
{
- R. Gracie, Operations Assistant
,
i
- R. Graves, Station Superintendent l
R. Traggio, Unit Superintendent The inspectors also interviewed other plant personnel including shift operators, engineering staff, and administrative personnel.
- Denotes those present at the exit interview.
I 2.
Licensee Reporting Requirements The inspectors delivered a copy to the licensee of the pending addition to 10 CFR Part 50,10 CFR 50.72, " Notification of Significant
Events".
Each item of the proposed regulation was discussed with
'
licensee management personnel.
3.
Shift Logs and Operating Records
-
I a.
The inspectors reviewed the following plant procedures to determine the licensee's established administrative requirements
!
in this area in preparation for a review of selected logs and
'
records:
ADM 1.1-5, Control Room Operating Log, Original.
--
ADM 1.1-44, Shift Relief and Turnover, Revision 1.
--
QA 1.2-16.1, Plant Information Reports, Revision 6.
--
'
b.
Shift logs and operating records were reviewed to verify that:
Shift Supervisor and Control Room log entries involving
--
abnormal conditions provide sufficient detail to communicate equipment status, lockout status, correction and restoration; Proper reviews are being conducted by the staff;
--
Operating orders do not conflict with Technical Specification
--
requirements; and,
" Plant Information Reports" confirm there are no violations
--
of Technical Specification or LCO reporting requirements.
I
)
. - - -.
m.
-
-
-,
.,--, _--
,,
-, _ _,
.,
..
c.
The review included the following records and discussions with licensee personnel:
Control Room Log Book for the period February 4-20, 1980.
--
Night Orders Book for the period January 1,1980 - February
--
20, 1980.
Plant Information Reports for the period November 20, 1979 -
--
February 16, 1980.
No items of noncompliance were identified. Several administrative type discrepancies were identified in the Plant Information Report system. These items were discussed with appropriate plant personnel at the exit meeting.
4.
In-Office Review of Monthly Operating Reports The inspector reviewed the licensee's Monthly Operating Report for January 1980 in the RI office to verify that reporting requirements were met.
No discrepancies were identified.
5.
Exit Interview The inspectors met with licensee representatives (denoted in Paragraph 1) at the conclusion of the inspection.
The inspector summarized the scope and findings of the inspection as detailed in this report.