Forwards IE Insp Rept 50-213/80-10 on 800519-23.No Noncompliance Noted
ML19321A435
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/11/1980
From: Martin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19321A436 List:
References
NUDOCS 8007230361
Download: ML19321A435 (2)


See also: IR 05000213/1980010

Text

.~

pfL Eff(j8

.

e

4

UNITED STATES

g

.

NUCLEAR REGULATORY COMMisslON

,,j

REGION I

<

p

't

631 PARK AVENUE

t

jyg j$$Q

KING OF PRUSSI A. PENNSYt,.VANI A 19406

Docket No. 50-213

Connecticut Yankee Atomic Power Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

.

Hartford, Connecticut 06101

'

Gentlemen:

Subject:

Inspection No. 50-213/80-10

This refers to the inspection conducted by Mr. R. H. Ladun of this office

on May 19-23, 1980 at the Haddam Neck Nuclear Power Station, Haddam Neck,

Connecticut of activities authorized by NRC License No. DPR-61 and to the

discussions of our findings held by Mr. Ladun with Mr. R. Graves and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selectivo examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Our inspector also verified the steps you have taken to correct the items

of noncompliance brought to your attention in letters dated August E, 1979

and February 21, 1980.

We have no further questions regarding your action

at this time.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, documentation of your control and

accounting procedures for safeguarding special nuclear materials and your

facility security procedures are exempt from disclosure; therefore, the

enclosed inspection report will not be placed in the Public Document Room

and will receive limited distr.ibution.

i

8007ss0361

.

r

eL

Connecticut Yankee Atomic

Power Company

2

.1 i Jut! 1980

.

-No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

~

Walter G. Martin, Chief

Safeguards Branch

.

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-213/80-10 CONTAINS 2.790(d) INFO

cc (w/ report cover sheet only):

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

.

r

,

,

. , _ , ,

. . ,

-.