ML19323C333

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-213/80-03 on 800220-22.No Noncompliance Noted
ML19323C333
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 03/24/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19323C334 List:
References
NUDOCS 8005150357
Download: ML19323C333 (2)


See also: IR 05000213/1980003

Text

..

.. -

- . . _ _-

.

.

. _ . .

-

.-

YM

  • -

.

80051503S 7

'

,n og

UNITED STATES

I

p

NUCLEAR REGULATORY COMMisslON

[

o

REGION 1

$

g

631 PARK AVENUE

E

KING OF PRUSSI A, PENNSYLVANIA 19406

\\ *****/

'

MAR 2 41980

Docket No. 50-213

Connecticut Yankee Atomic Power Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

,

P. O. Box 270

'

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 80-03

This refers to the inspection conducted by Mr. T. H. Smith of this

office on February 20-22, 1980 at Haddam Neck Plant, Haddam, Connecticut

of activities authorized by NRC License No. DPR-61 and to the discussions

of our findings held by Mr. Smith with Mr. R. Graves and others of your

l

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

i

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any infonnation that you (;or your contractor)

believe to be proprietary, it is necessary that you make a written

.

application within 20 days to this office to withhold such information

!

from public disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

l

of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as

1

far as possible into a separate part of the affidavit.

If we do not

i

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

f

i

!

l

l

i

l

. . . - -

,

_

. .

.

. -

.

- _ _

. , . _ _ _ .

, . - _ . . . . _ , - . . .

. .

__

o

.

Connecticut Yankee Atomic Power Company

MAR 2 4 1980

2

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

.

.e

-

El o

. Brunner, Chief

Reactor Operations and Nuclear

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-213/80-03

cc w/ encl:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer