IR 05000155/1981004

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-155/81-04 on 810406-10.No Noncompliance Noted.Major Areas Inspected:Review of Security Plan,Program & Organization & Protected & Vital Area Physical Barriers. Details Withheld (Ref 10CFR2.790)
ML20003J149
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 04/23/1981
From: Creed J, Kniceley J, Pirtle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20003J143 List:
References
50-155-81-04, 50-155-81-4, NUDOCS 8105080503
Download: ML20003J149 (2)


Text

.

O U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-155/81-04 Docket No. 50-155 License No. DPR-6 Safeguards Group II Licensee: Consumers Power Company 212 West Michigan Avenue Jackson, MI 49201 Facility Name:

Big Rock Point Nuclear Power Plant Inspection At:

Big Rock Point Site, Charlevoix, MI Inspection Conducted: April 6-10, 1981 Date of Last Physical Security Inspection:

September 22-26, 1980 Type of Inspection: Unannounced Physical Security Inspectors:

O, (.

A d

L J P R. Kniceley C)

Date Physical Security Specialist

___2RA%

9 /2 r/at G. L.

tle Date Physical Security Specialist Approved by:

f 2 8/

.

R. Creed, Acting Chief Da t'e afeguards Section Inspection Summary Inspection on April 6-10, 1981 (Report No. 50-155/81-04)

Areas Inspected:

Included a review of the Security Plan; Security Program Audit; Security Organization; Protected Area Physical Barriers; Vital Area Physical Barriers; Lighting; Access Control (Identification, Authorization and Badging); Access Control (Search); Access Control Gscorting); Access Control (Vital Areas); Alarm Stations; Detection Aids; Assessment Aids; Com-munications; Testing and Maintenance; Compensatory Measures; Power Supply; Response; Locks, Keys, and Combinations; Records and Reports; Independent Inspection Effort; Followup on Previous Items of Noncompliance; and Followup 8105 08 oFv3 AII!6 GIL N 10 c: <- 17.,, e.sm,

__

_

.

-_.

__

_

_

_.

.

i

-on Unresolved items. The inspection involved 63 inspector-hours onsite by

two NRC inspectors. The inspection began during the offshift; eight inspec-tion hours were accomplished during offshift-periods.

I Results: The licensee was found to be in compliance with NRC requirements within the areas examined during the inspection.

>

/

6 h

1