IR 05000029/1975008
| ML19345A687 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 08/05/1975 |
| From: | Haynes R, Jernigan E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19345A679 | List: |
| References | |
| 50-029-75-08, 50-29-75-8, NUDOCS 8011240553 | |
| Download: ML19345A687 (5) | |
Text
!
.
.
,
D
.
.
.
.
IE:I Fom 12
.
.
(Jan 75) (Rev)
~.
.
i
?
.
!
l U. S. NUCLEAR REGULATORY CO.tISSION
.
OFFICE OF INSPECTION AND ENFORCD!EST REGION.I
.
I
,IE' Inspection Report No:
50-29/ 7s-nq Docket No:
Snq9 Licensee:
Yankee Atomic Electric Cennanv License No: Dpr-1
20 Turnpike Road Priority:
_
'
Westborough. !!assachusetts 01581 Category:
C Safeguards
.
Loca tion:
Rowe,Ifassachusetts Type of Licensee:
pt.m 17s m7n t.n.
- e of Inspection *
w n,.,. e., o _
Announcna
-
.
Dates of Inspection:
Julv 10-11. 1975 Dates of Previous Inspection:
Mav 19-21. 1975 f
+t abb k N!E Reporting Inspector:
h, M/ L
.
! ! n i/ - -- I /d' oc -
(
v
, DAIE Ernest P. Jernigan,LReactor Inspector
-
'
'
,
Acco=panying Inspectors:
.._
j DATE
!
-
.
DATE
.
,
!
DATE
'
l-Other Accompanying Personnel: _
DATE N/A Reviewed By:
I
/\\77
=' -~
R. C. Haynes,.Se b or Inspector
.
.
8615244 S'5 3
'
.
.
_. - -
-
+-.
., -
,
e
,.
~
s-e s.
,
.
,
.
.
-
,
,
.
~
s.
l
!
SUMMARY OF FI! DINGS
.
I i
l Enforcement Action
A.
Items of Noncorgliance None
.
B.
Deviations In-Service Inspection Progran Certain In-Service Inspection Program examinations were
.
omitted contrary to the licensee's commitment to the
~
Division of Reactor Licensing.
(Details, Paragraph 5)
Licensee Action on Previous 1v Identified Enforcement Ite s Not applicable Design Changes
,
.
None identified
.
,
Unusual Occurrences
.
,
i'
l None reported
Other Significant Findings t
'
j A.
Current Findings l
i 1.
Acceptable Areas
.
!
-
,
!
a.
In-Service Inspection Examination Procedures The in-service inspection nondestructive' examination i
procedures were reviewed and were found to meet
!
program requirements.
(Details, Paragraph 3)
!
.
t.
e i
.
...
-.
.
'
e
.
" * '
- -
as
- womeo.4
,== m e e.===
.e
- ==-e e
em e em-
--m
- ~*
--
-
.
I
.
.
.
'
-
.
.
,
.
-2-
's.
-
-
-
I
!,
b.
Nondestructive Test Personnel Qualification Records
!
l The documentation of nondestructive test personnel qualifications were reviewed and found to meet the i
i program requirements.
(Details, Paragraph 4)
!
j 2.
Unresolved Items
-
i None'
.
B.
Status of Previous 1v Reported Unresolved Items
,
i i
Not inspected
!
Manacement Interview
,
,
A management interview was held at the site on July 11, 1975, with the following personnel to diccuss the inspection findings:
Ya,nkee Atomic Electric Company Mr. H. A. Autio, Plant Superintendent Mr. M. W. Ebert, Plant Reactor Engineer Mr. T. K. Henderson, Assistant Reactor Engineer
.
Mt. R. L. Boutwell, Technical Assistant Mr. L. L. Reed, Quality Control and Audit Coordinator The following itees were discussed:
.
..
!
A.
Scope of Inspection The inspector stated that this was a routine, announced inspec-
.
tion of the licensee's In-Service Inspection Program.
t B.
Review of Acceptable Items
i
~
The items discussed were as identified under the_ Acceptable
-
i Areas section of the Su= mary of Findings of this report.
i C.
Deviations I
The information relating to the deviation described in the Summary of Findings section of this report was discussed by the inspector
'
with the licensee at the meeting and during a subsequent telephone
conversation on August 4, 1975 between Mr. Autio and the inspector.
.
(Details, Paragraph 5)
.
.
.
...
--.
.
.
.
-
+
f
.
.
,
,
..
l
.,
-
-
-1
.
e i
,
-
.
{
DETAILS
'
-
.
,
1.
Persons Contacted Yankee Atomic Electric Company Mr. M. W. Ebert, Plant Reactor Engineer Mr. T. K. Henderson, Assistant Reactor Engineer
-
Mr. L. L. Reed, Quality Control and Audit Coordinator
.
.
2.
General The purpose of this inspection was to review the data, procedures and documentation related to the nondestructive examinations per-
formed during 1974, as a part of the licensee's In-Service
Inspection Program.
(The nondestructive examinations perforced l
during 1974, coepicted the first interval of the licensee's In-Service Inspection Program.)
l 3.
In-Scrvice Inspection Examination Procedures
'
The inspector reviewed the examination procedures provided by
,
j the licensee's contractor and found them to meet the requirements of ASME Boiler and Pressure Vessel Code,Section XI.
The i
!
inspector also found that examination results were being recorded j
in accordance with these procedures.
'
4.
Nondestructive Examination Test Personnel Qualification Records l
The inspector reviewed documentation of examination personnel j
qualifications and found them to be in compliance with SNT-TC-1A,
!
the governing document.
l
'1
-
5.
In-Service Inspection Program s
A review was made of-licensee's Inservice Inspection Program which'
is described by letter to the Division of Reactor Licensing of August 30, 1971 and the testing program outlined by an attachment to the letter.
The letter stated in part
" Yankee adopted an
..
'
in-service inspection program (see attached Table 1) consistent with the requirements of the code and compatible with the.'As Constructed' plant"....
s
.
i
,
i i
.
...
--.
O e
.
i
- ~
__
-
~ '
f
.
.
.!.
.
J
-..
.
,
.
l
.
t
.
l-4-
-
.
.
,.
i
}
The inspector found that the final testing surmnary showed that
-
l the licensee's examination contradtor did not perform e resin i
examinations in accordance with the requirements outlined in i
Table 1 of the licensee's In-Service Inspection Program. The examination omissions included: 1) visual examination of the reactor vessel penetrations; 2) volumetric examination
,
l of the integrally welded pressurizer vessel supports; and 3)
<
visual and surface examination of the primary nozzle-to-vessel I
head welds of the stean generators.
-
-
I
,
!
This item is considered to be a deviation from the licensee's l
commitment to the Division of Reactor Licensing.
..