RO:I Form 12
,
(Oct 74) (Rev)
U.S. ATOS11C ENERGY C0:0!ISSIO::
DIRECTORATE OF REGULiTORY OPERATIONS
REGION I
RO Inspection Report No:
50-29/75-01 Docket No:
50-29
__
Yankee Atomic Electric Company License No: DPR-5 Licensce:
20 Turnpike Road Prior;* ty :
-
Westboro, Massachusetts 01581 C
Category:
Location:
Rowe, Massachusetts Safeguards Group:
PWR, 600 MWe(W)
Type of Licensee:
Routine, Announced Type of Inspection:
January 7-10, 1975 Lstes of Inspection:
.
.
Dates of previous Inspection: Dece=ber 17-20, 1975 0-b g l22.hf Reporting Inspector:
__D.
F. Johnson Date i
i None Accompanying Inspectors:
Date'
,
Date
_
Date i
Date Other Accompanying Personnel:
%n, Date e.c.A %.h i t 2.th r Revicued By:
E. C. McCabe, Jr., Senior Reactor ' Inspector Datt-
'
-
Nuclear Support Section, Reactor Operations Branch
,
.
-
-
.
u
.
11050 7o g p
_o@
W
.
..
Q
.-
!
.
g
.
SUMMARY OF FINDINGS Enforcement Action None Licensee Action on Previously Identified Enforcement Action Not inspected
,
Design Changes None identified Other Significant Findings
,
A.
Current Findings
.
1.
The licensee has corrected facility procedure program devia-tions previously identified in RO Report 50-29/75-01.
(De-tail 4)
.
2.
The licensee is continuing with his program to upgrade and. -
vise facility precedures pu suant to guidelines set forth in Regulatory Guide 1.33 and industry standard ANSI N18.7.
(De-tail 3)
3.
Unresolved Items None C.
Status of Previously Reported Unresolved Items
.
Not Inspected
.
D.
Open Items
.
Facility procedure program completion.
(Detail 3a)
Management Interview A management irterview was. conducted on site, January 10, 1975, at the
- cons.usion of the inspectf.A.
.
.
...
--.
.
,
__
l
--
t
.
.
.
i-2
.
t Personnel in Attendance Mr. H. A. Autio, Plant Superintendent Mr. R. L. Boutwell, Engineering Assistant to TAPS Mr. T. P. Danek, Operations Supervisor Mr. L. L. Reed, Quality Control and Audit Coordinator
'Mr. R. E. Reid, NSD, Westboro Mr. J. L. Staub, Tehenical Assistant to TAPS Mr. N. N. St. Laurent, Technical Assistant to the Plant Superintendent (TAPS)
Mr. D. B. Vassar, Assistant Operations Supervisor i *
Sirmmary of Items Discussed
l l
l.
Operating Memos (Detail 2)
'
2.
Results from review of Facility Procedures Program (Detail 3)
3.
Previously identified deviations regarding facility procedures (De-tail 4)
4.
Enforcement Criteria (Detail 5)
.
.
.
e e
p
e
g S
,
&,
.
.
-
.
DETAILS 1.
Persons Contacted
Mr. H. A. Autio, Plant Superintendent Mr. E. D. Barry, Control Room Operator Mr. R. L. Boutwell, Engineering Assistant to TAPS Mr. T. P. Danek, Operations Supervisor Mr. F. E. Hicks, Control Room Operator Vf, W. J. Jones, Assistant Plant Superintendent
-
Mr. L.
J. Laffot.d, Centrol Room Operator Mr. R. C. Pettengill, Control Room Operator Mr. J. L. Staub, Technical Assistant to TAPS l
Mr. N. N. St. Laurent, Technical Assiatant to Plant ruperintendent (IAPS)
Mr. E. R. Taylor, Shift Supervisor i
Mr. E. A. Walsh, Shift Supervisor l
l 2.
Operating Me=os l
The inspector through discussion with the licensee and by examination
,
i
. of pertinent records determined that significant effort has been put forth to phase out all safety related Operating Menos.
The licensee
prepared an Administrative Procedure AP-0021 to control the prepara-
,
tion, review, approval, issuance and revision of Operating Mecos. All
,'
safety related memos were separated, reviewed and approved by the plant staff in preparation for submittal to the Manager of Operations for his approval.
Subsequent to this action a management decision was made to eliminate the use of safety related memos for plant operation. This decision invalidated previous efforts and cancelled the current cc=-
pleted program. The licensee is presently revising facility proce-dures to incorporate the data from the operating memos.
The inspector stated he was concerned as to the timely completion of this current program, and that a request will be made for the licensee to respond in writing to provide a commitment date.
3.
Facility Procedure Program Review a.
Procedural Coverage The inspector verified by review of procedure indexes that the licen.see's procedure system is broad enough in scope, with the ex-ception of the items listed below, to cover all activities listed in Regulatory Guide 1.33, Appendix A by written procedures.
.
..
-.
'
.
.
.
-
.
.
.
_4_
(1) Recali of Standby Pers'nnel The licensee agreed to draft a procedure for the recall of standby personnel or incorporate this coverage into existing administrative procedures.
The following procedures are undergoing conversion from the old format to a new format that will be consistent with the guide-
.
,
lines set forth in ANSI N18.7.
(1) 02-2156 Operation of the component cooling system
,
(2) OP-2477 Recirculating, cooling and heating of the vapor container (3) OP-2479 Vapor container atmospheric control systa=s, charging
.
(4) OP-2476 Maintaining normal VC pressure (5) OP-2502 Operation of the 120 VAC vital bus system (6) OP-2503 Operation of the 125 VDC system (7)' OP-2!04 operation of the station power system
-
(8) OP-2130 startup of an isolated loop (9) OP-2131 Cut in of an isolated loop to the reactor (10) Alarm procedures for safety related systems and components.
The above items remain open pending completion and approval of the procedures.
b.
Procedure Review and Aporoval (1) The inspector verified by a sampling of safety related fac-ility procedures that the lice'see has performed an author-n
-
ized management review and approval in accordance with the requirements of the Technical Specification, including tem-porary changes to procedures.
(2) The inspector verified by review of the Plant Operation Review Committee minutes that adequate reviews have been I
performed including co=mittee evaluations and reco=menda-tions.
The inspector also verified that co=mittee member-ship, meeting frequencies, quorums, responsibilities,
"~ *
.
e
f
.
.
I-5-authorities and records are in accordance with the require-ments of the Technical Specifications and administrative procedure AP-0003 " Plant Operations Review Committee Res-ponsibilities and Authorities".
The inspector reviewed administrative procedure AP-0001
" Plant Procedures" to verify that the licensee has proce-dures for the revision, periodic review, preparation, distribution and approval of facility procedures.
(4) The inspector reviewed the PORC meeting minutes and verified
"
that plant and component modifications, Technical Specifica-tion changes and timely periodic review have been performed for applicable facility procedures.
The inspector had no further questions in the above areas.
c.
Detailed Review of Selected Procedures for Overall Content The following procedures were reviewed to verify that the li-
-
censee's procedures are consistent with the format and content discribed in ANSI N18.7.
AP-0001 " Plant Procedures"
'
AP-2001 " Responsibilities and Authorities of Operations Department Personnel" AP-0017 " Switching and Tagging Rules for Plant Equipment" AP-0220 " Surveillance Tests and Records"
'
AP-2002 " Operations Depart =ent Personnel Shift Relief"
,,
AP-0219 " Maintenance of Operations Departmental Logs" AP-0221 "In Plant Files" AP-0018 " Bypass of Safety Function and Jumper Control" OP-0021 " Operating Memos" OP-2100 " Plant Startup from Cold Shutdown OP-21P,1 " Plant Startup from Hot Standby or Hot Shutdown" OP-2103 " Reactor Startup and Shutdown" OP-2104 " Plant Shutdown to Hot Standby or Hot Shutdown" OP-2106 " Plant Cooldown from Hot Shutdown"
-
OP-2125 " Filling and Venting of Main Coolant System" OP-2127 " Draining a Main Coolant Loop" OP-2129 " Filling and Venting an Isolated Loop" OP-3000 "E=ergency Shutdown from Power" OP-3201 " Rupture of a Main Steam Line" OP-3203 " Loss of Condenser Vacuum" OP-5200 " Main Coolant Check Valve Repair" OP-5201 " Main Coolant Motor Operated Valve Maintenance"
'
The inspector had no further questions in this area.
.
e e
r
.
.
.*
-6-4.
Previously Identified Deviations in Facility Procedures
'
The following procedures were revised by the licensee in accordance with the inspectors comments (R0 Report No. 50-29/74-02 detail 4)
.
a.
Emergency Procedures OP-3754 Battery No. 1, 2 or 3 Critical Voltage
.
OP-3747 AC Failure Battery Charger No. 3
'
OP-3252 Total Loss of AC OP-3203 Feed Water Line Break Emergency Action OP-3106 Total Loss of Main Coolant
OP-3103 Total Loss of' Main Coolant Flow OP-3010 E=ergency Evacuation of Control Room b.
Operating Procedures RF-2600 Operation of the control and service air systems RP-2250 Feed Water Line Isolation and Return to Service OP-2106 Plant Cooldown from Hot Shutdown OP-2100 Plant Startup from Cold Shutdown OP-2107 Changing Plant Load
, c.
Surveillance and Maintenance Procedures OP-4204 Monthly Test of Safety Injection System OP-4211 E=ergency Boiler Feed Pump Surveillance Test OP-4209 Flow Test of Two ECCS Trains with Emergency Power AP-5200 Maintenance Department Surveillance Schedule
'
d.
Instrumentation Procedures OP-6103 Reactor and Turbine / Generator Permissive Switch and Assoc-iated Time Delay Relay Calibration and Functional Test OP-6450 Inspection and Stroke Calibration of V.C. Trip Valves e.
Health Physics Procedures
.
OP-8100 Establishing and Posting Controlled Areas RP-8400 Use of Protective Clothing f.
Administrative Procedures AP-00dl Plant Procedures The inspector had no further questions in this area.
__,
_
,,,
.
.
--
.. -. -.
_
-
.
,
.
.
I
!
-7
-
.
i
5.
Enforcement Criteria The inspector discussed with the licensee the criteria for deter-mining enforcement action and categories of noncompliance with
!
AEC regulatory requirements.
The-following items were discussed in detail:
!
Levels of enforcemerit actions available to the Co= mission i
a.
b.
Categories of noncompliance
.
!
(1) Violation j
(2) Infraction
.
(3) Deficiency I
l c.
Deviations i
'
f
.