IR 05000003/1978005
| ML20049J795 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 04/26/1978 |
| From: | Joyner J, Woltner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20049J794 | List: |
| References | |
| 50-003-78-05, 50-247-78-10, 50-3-78-5, NUDOCS 8203260292 | |
| Download: ML20049J795 (2) | |
Text
1,
,
'I.S. NUCLEAR REGULATORY COMMI!
DN vFFICE OF INSPECTION AND ENFORCtdENT Region I g oc*A @ g$
50-03/78-05 y
e a cpWD 'pc Report No.
50-247/78-10
- pop h., pd "# o cra 50-03 8 #
'
t Docket No.
50-247 c.pa#
OPR-5
.
'
License No.
DPR-26 Group
Category D,C Licensee:
Consolidated Edison Comoany of New York, Inc:
4 Irving Place
New York, New York 10003 Facility Name:
Indian Point Nuclear Generatina Units 1 and 2 Inspection at:
Buchanan, New York Inspection conducted: April 6, 1978 r:-s u i u, /'. lr'
Inspectors:
-e: /
r
'
-
a E. Woltner, Auditor date signed
.
.
date signed
,
date signed
,a t
i Approved by:
[ Cd< '. '
I'-
< 9:
'#
~
J. Joyner, Chief., Nuclear Material date signed Control Support Section, Safeguards Branch V
Insoection Summary:
Inspection on Aoril 6,1978 (Combined Recort Nos. 50-03/78-05 and 50-247/78-10)
Areas Insoected:
Routine, unannounced nuclear material control and accounting covering licensee action on previously identified items of noncompliance.
The inspection involved two inspector-hours on site by one NRC inspector.
Results:
No items of noncompliance were identified.
.
fg326029278o424
ADock 0500o003 PDR Region I Form 12
'
(Rev. April 77)
........
.-.
.--
-
.-
.
.. _ -.
's
'
.
DETAILS
,s.
1.
Persons Contacted L. J. Kawula, Test and Performance Engineer E. F. Eich, Performance Supervisor Both of these individuals were present at the exit interview.
,
2.
Licensee Action on Previous Inspection Findings (Closed) Noncompliance (50-03/77-17-01):
Failure to report plu-tonium decay on Material Status Reports Form NRC-742.
The inspector reviewed the data for the period ending March 31, 1978, and the required plutonium decay will be reported as required.
(Closed) Noncompliance (50-247/77-39-01):
The noncompliance and licensee action is identical to the above paragraph.
3.
Exit Interview
-
-
~
The inspector met with the licensee representatives (denoted in paragraph 1) at the conclu~sion of the inspection on April 6,1978.
The inspector summarized the scope and the findings of the inspection.
.
%
9
.
=
s eaM e
W*%