UNITED STATES
' ' ' '
NUCLEAR REGULATORY COMMISSION
[
s
APR26 %
neo,ou.
$31 PARK AVENUE KING OF PRUSSI A. PENNSYLVANI A 19406 x
ENCLO'G.:S T,1;ii;:..iii D HERZMTH
.
b b b'b b DPR-5 1C;;,'
Consolidated Edison Company of DPR-26
, ~,0 New York, Inc.
CPPR-62 i,
Att ntion:
Mr. W. J. Cahill Vice President Inspection Nos. 76-02
.
,,, e 76-04 C.T-Op.
4 Irving Place
.?
76-07 5%
New York, New York 10003 Docket Nos. 50-03
'41%
Q.0-24T)
TG 50-286
.'s
~
Gentlemen:
,.g.
N[
This refers to the inspection conducted by Mr. W. Tobin of this office'
on March 9-12, 1976 at Indian Point Station, Units 1, 2 and 3 of activ-(h ities authorized by NRC License Nos. DPR-5, DPR-26 and CPPR-62 and to
,&g4 S'
the discussions of our findings held by Mr. W. Tobin with Mr. Stein and Mr. Salay of your staff at the conclusion of the inspection, and to subsequent telephone discussions between Mr. A. Davis and Mr. J. Streeter of this office and Mr. Stein and Mr. Salay on March 19, 1976.
~,
'
The area exacined during this inspection was limited to the Physical Protection Program as implemented at Units 1, 2 and 3, and as described h-I in the Office of Inspection and Enforcement Inspection Report which is
,.
enclosed with this letter. Within this area, the inspection consisted 8m of selective exa=inations of procedures and representative records, (h
interviews with personnel, and observations by the Inspector.
Based on the results of this inspection, it appears that certain of your activities were not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix These itets of noncompliance have been categorized into the levels A.as described in our correspondence to you dated Dece=ber 31, 1974.
This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this of fice, within twenty (20)
days of your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the recults achieved; (2) corrective steps which will be taken to
-
avoid further items of noncompliance; and (3) the date when full compli-ance will be achieved.
+
p m,e ENCLg --
+la ;;E;;2lilTH
-
0tuTro
~
-
_... - -
CONTAIN ig c c R c.!W WOMM.
h!h[a kN 4/
i
'#e.3916 8111090467 760426 PDR ADOCK 05000003 h
/b G
__
..
.Consolidatr.d Edison Company of New York, Inc.
ffg g g 7g7G
!
,
~2-
,
'
(
ENCLOCRIS Ti:lCid... icJ id:SilTH CONTAlii 10 C F R 2.790 INFORMATION.
Another activity appears to be a deviation from an appropriate code,
standard, or guide, as set forth in the Notice of Deviation, enclosed i
.
herewith as Appendix B.
With resepect to this deviation, please include in your response your cocments concerning this item, a description of
,
any steps that have been or will be taken to correct it, a description of any steps that have be'en'oy will be taken to prevent recurrence, and
,
i the date all corrective actions or preventive measures are or will be
<
co=pleted.
>
In accordance with Section 2.790(d) of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, documentation of findings y,
of your control and accounting procedures for safeguarding special f.i nuclear materials and your facility security procedures are exempt from
[.
disclosure; therefore, the enclosures to this letter, the inspection
report, and your response to this letter will not be placed in the Public Document Room and will receive limited distribution.
,.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
i b
Sincerely, j
$a A
r.
Walter G. Martin, Chief
^
Safeguards Branch Enclosures:
,
1.
Appendix A, Notice of Violations l
'
2.
Appendix B, Notice of Deviation 3.
IE Inspection Report No. 50-03/76-02 etal cc:
A. E. Upton, Esquire W. Stein, Manager, Nuclear Power Generation Department J. Makepeace, Director, Technical Engineering S. Salay, Plant Manager A. Kohler, Resident Construction Manager
,.
S. Cantone, -Chief Engineer Unit 3 l
A. Z. Roisman, Counsel for Citizens Committee for Protection
'-
of the Environment (Without Report and Enclosures)
l i
i
i l
[
ENCLO3;:.2 ~.
i :-:IE!!iTH 0 0 iff..iii 1 0 C. U 2.'/33 lNFORic:ATION.
!
!
I
.
.-
-
.V
-
' Consolidated Edison Compeny of Ncv York' Inc,*Eh,C., -
- - ; ;;; -
.3 !!E:GNITH
'
- ;g ;;;ic;6.iAIl0N.
-2-
.
,;
-
-
LONTnin iv L r. g
.
.
bec:
IE P. ail & Files (For Appropriate Distribution)
-
PDR (w/o cy of Rpt & Encl)
.
.
Local PDR (u/o cy of Rpt & Encl)
~
'
REG:I Reading Room (w/o cy'oS Rpt & Enel)
.
. s.
State of New York (w/o cy of Ept & Encl)
'.24
.
.
.
,
..,..
.c
$.Y
-
9Ai
. =. m
,
._
L
"'
.:.:.;
i?-i%
'
-T
.
,
,
i
~ 1 HEREWITH
'
-
u,.. C, n - y i. - -
' :0.i'.1 AT10il.
--
-'-
C u-.,..,.. i.
.
.
n.. i-
-