GNRO-2006/00009, Technical Requirements Manual Update to the NRC for Period Dated February 16, 2006

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual Update to the NRC for Period Dated February 16, 2006
ML060520651
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/16/2006
From: Bottemiller C
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2006/00009
Download: ML060520651 (4)


Text

Yiateroo Road PO Box 756 For G i o s o ~MS

, 8950 Tsl 501 437 6233 Manager Piant L:cenwg GNRO-2006/00009 February 16,2006 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk

Subject:

Technical Requirements Manual Update to the NRC for Period Dated February 16,2006 Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29

Dear Sir and Madam:

Pursuant to Grand Gulf Nuclear Station (GGNS) Technical Requirements Manual Section 1.04, Entergy Operations, Inc. hereby submits an update of all changes made to GGNS Technical Specification TRM since the last submittal (GNRO-2006/00003) letter dated January 17, 2006 to the NRC from GGNS). This update is consistent with update frequency listed in 10CFR50.71(e).

This letter does not contain any ~ o m m i t ~ ~ n t s .

Should you have any questions, please contact Michael Larson at (601) 437-6685.

Yours truly, CAB/MJL attachment: Technical Requirement Manual Pages cc: next page

GNRO-2006/00009 PAGE 2 cc:

Compton J. N. (w/o)

Levanway D. E. (Wise Carter) (w/o)

Reynolds N. S. (w/o)

Smith L. J. (Wise Carter) (w/o)

NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U.S. Nuclear Regulatory Commission ALL LETTERS ATTN: Dr. Bruce S. Mallett (w/2) 61 1 Ryan Plaza Drive, Suite 400 Arlington, TX 7601 1-4005 U.S. Nuclear Regulatory Commission ALL LETTERS -

ATTN: Mr. ~ h a i ~ h a n dVai r a ya, NRRIDORL (w/2) COURIER DELIVERY (FEDEX, ETC.)

ATTN: ADDRESSEE ONLY ADDRESS ONLY -

ATTN: Courier Delivery Only ****DO NOT USE FOR Mail Stop OWFN/7D-1 U.S. POSTAL 11555 Rockville Pike SERVICE Rockville, MD 20852-2378 USED

ATTACHMENT to GNRO-2006100009 Grand Gulf Technical Requirement Manual Pages dated February 1692006

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY

1. This Surveillance shall not be performed in MODE 1, 2 or 3.
2. All DG starts may be preceded by an engine prelube period.

Verify, when started simultaneously from standby After any condition, each DG achieves: modifications which could

a. in I 10 seconds, voltage 2 3744 V and frequency affect DG 2 58.8 Hz; and interdependence
b. steady state voltage 2 3744 V and I 4 5 7 6 V and frequency 1 5 8 . 8 Hz and 5 6 1 . 2 Hz.

SR TR3.8.1.5 Perform a pressure test of those portions of the 10 years diesel fuel oil system designed to Section 111, subsection ND of the ASME Code in accordance with ASME Code Section XI, Article IWD-5000.

SR TR3.8.1.6 Verify each DG automatic critical protective 18 months functions trip the DG (

Reference:

GNRO-2005/00056, GNRI-2006/00009). The critical protective functions are Engine Overspeed and Generator Differential Current (

Reference:

UFSAR 8.3.1.1.4.1.f(2) and 8.3.1.2.l.b.5.(g)).

TRM 3.8-17-11 LDC 06007