Title | Part 21 - Incorrect Part Number Relay Shipped to Brunswick Nuclear Plant |
Event Description | The following is an excerpt of communication received via fax:
Summary: Engine Systems Inc. (ESI) began a 10CFR21 evaluation on 04/13/15 upon discovery that governor control panels shipped to Brunswick Nuclear Plant contained an incorrect part number relay. The evaluation was concluded on 06/05/15 and it was determined that this issue is a reportable defect as defined by 10CFR Part 21. Under certain adverse conditions, a panel with the incorrect part number relay may lose power thereby resulting in inoperability of the electronic control portion of the control system. This could prevent the emergency diesel generator set from performing its safety-related function during an emergency event. Discussion: The relay in question is the Governor Control At Setpoint (GCASP) relay installed in the governor control panel assembly P/N 8002096-PANEL. The panel provides speed control functions for the emergency diesel generator (EDG). In the original panel design the part number specified was 219XBX282NE. During the course of EMC testing, it was determined that the EMI suppression diode within in the GCASP relay must be removed in order for the EUT to comply with the requirements of [International Electrotechnical Commission] IEC 61000-4-5. When the diode was installed and the negative polarity portion of surge testing forward biased the diode, this resulted in a short circuit connection between the supply and return conductors of the control panel's power. This caused the fuses designed to protect the panel from overcurrent conditions to fail open; resulting in a loss of power to the control panel. In place of the EMI suppression diode, a [Metal Oxide Varistor] MOV (P/N V150LA10AP) was added across terminals 6 & 7 of the GCASP relay socket. The MOV provides similar EMI suppression to the removed diode and responds appropriately to either polarity of surge waveform. The MOV is external to the relay and is considered a separate component. The MOV is not affected by this notification. Removal of the internal EMI suppression diode for the GCASP relay resulted in a part number change. The relay part number that should have been installed is P/N 219XBX283NE. The part number of the relay actually installed was P/N 219XBX282NE. The difference between the two relays is that P/N 219XBX282NE contains an internal suppression diode whereas 219XBX283NE does not. Impact on Operability: During normal operating conditions, the EDG will perform its safety related function with the incorrect GCASP relay installed in the governor control panel. Both relays provide the same switching function. However, if a negative polarity surge similar to the requirements of IEC 61000-4-5 were to occur on the 125 VDC bus with the incorrect relay installed, the control panel may lose power. The 27GP relay would de-energize, alerting plant personnel of an under-voltage condition within the governor control panel. The EDG would remain operable on the mechanical governor though the electronic control portion would be inoperable. Root cause evaluation: An error by a technician in conjunction with a lapse in oversight allowed this problem to occur. Contributing to the issue was that only one digit differentiates the two part number relays and both have the same overall appearance (size, shape, case style, etc). Evaluation of previous shipments: This issue only affects one part number (qty 4) supplied on one customer purchase order. Corrective Action: The customer was advised of the situation via letter 'Notice of GCASP Relay Discrepancy - Governor Control Panel' sent on 04/15/15. The correct relays were then supplied to the customer as dedicated, safety-related replacements on ESI IWO 8002474 (Brunswick PO 00786240) for installation in the panels. There are four panels affected, each containing one of these relays. ESI supplied four replacement relays which were [Certificate of Conformance] C-of-C'd and shipped on 04/17/15. These are plug-in style relays and to replace the relay only requires pulling out the old relay and plugging in the new relay. No special tools or instructions are necessary. |
Where | |
---|---|
Engine Systems, Inc Rocky Mount, North Carolina (NRC Region 1) | |
Organization: | Engine Systems, Inc |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+-4 h-0.167 days <br />-0.0238 weeks <br />-0.00548 months <br />) | |
Opened: | Tom Homer 18:12 Jun 5, 2015 |
NRC Officer: | Nestor Makris |
Last Updated: | Jun 5, 2015 |
51129 - NRC Website | |
Engine Systems, Inc with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 565382023-03-28T04:00:00028 March 2023 04:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Defect Identified in Emergency Diesel Generator Governor ENS 556052021-11-09T17:00:0009 November 2021 17:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Hinge Pin Retainer Plug Defective on Diesel Check Valve ENS 555312021-08-20T16:00:00020 August 2021 16:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Pressure Regulator Valve Failure ENS 553472021-05-11T16:00:00011 May 2021 16:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Initial Report - Deviation Identified Loose Zinc Anodes Installed in Heat Exchangers for Diesel Generators ENS 544672020-01-08T05:00:0008 January 2020 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Inadequate Selenium Surge Suppressor Thread Modification ENS 543502019-09-06T04:00:0006 September 2019 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Emd Fuel Injectors Seized Plunger and Bushing ENS 542362019-08-22T04:00:00022 August 2019 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Cracked Spray Tip on Emd Fuel Injector ENS 537632018-11-30T05:00:00030 November 2018 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect En Revision Imported Date 12/24/2018 ENS 536002018-07-19T04:00:00019 July 2018 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Motor Operated Potentiometer Defect ENS 533022018-02-01T04:00:0001 February 2018 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Refurbished Pressure Regulator May Result in Emergency Diesel Generator Failure to Start ENS 527982017-06-08T04:00:0008 June 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Defective Motor Operated Potentiometer ENS 524662016-12-21T05:00:00021 December 2016 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Issues Identified with the Enterprise Diesel Engine Subcover ENS 524772016-11-12T05:00:00012 November 2016 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Seizure of Fuel Injector on Emergency Diesel Generator ENS 511292015-06-05T22:12:0005 June 2015 22:12:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Incorrect Part Number Relay Shipped to Brunswick Nuclear Plant ENS 489602013-04-19T04:00:00019 April 2013 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Esi Refurbished Emergency Diesel Generator Cylinder Heads May Have Valve Keeper Seals Missing ENS 485642012-12-06T05:00:0006 December 2012 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Esi Refurbished Emergency Diesel Generator Cylinder Head with Foreign Material in Intake Port 2023-03-28T04:00:00 | |