DCL-19-036, Independent Spent Fuel Storage Installation - Revision 14 of the Physical Security Plan

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation - Revision 14 of the Physical Security Plan
ML19155A081
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/18/2019
From: Welsch J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
DCL-19-036, DIL-19-008, NEI 11-08
Download: ML19155A081 (4)


Text

SAFEGUARDS INFORMATION ENCLOSURE.1 TO THIS LETTER IS SAFEG.UARDS INFORMATION.

ENCLOSUR E 2 TO THIS LETTER IS SAFEGUARDS INFORMATION.

Pacific Gas end Electric Company*

James M. Welsch Diablo Canyon Power Plant Vice President P.O. Box 56 Nuclear Generation and Avila Beach, CA 93424 Chief Nuclear Officer 805.545.3242 E-Mail: James.Welsch@pge.com April 18, 2019 PG&E Letter DCL-19-036 PG&E Letter DIL-19-008 U.S. Nuclear Regulatory Commission 10 CFR 50.54(p), 10 CFR 72.44(e)

A TIN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50~323, OL-DPR-82

  • Diablo Canyon Units 1 and 2 Materials License No. SNM~2511, Docket No. 72-26 Diablo Canyon Independent Spent Fuel Storage Installation Revision 14 of the Physical Security Plan*

Dear Commissioners and Staff:

As required by to CFR 50.54(p) and 10 CFR 72.44(e), Pacific Gas and Electric Company (PG&E) hereby subn:,its Revision 14 of the Diablo Canyon Power Plant (bCPP) Physical Security Pian' (PSP), with the following appendices:

  • Appendix A: Glossary of Terms and Acronyms
  • Appendix B: Training* and Qualification Plan
  • Appendix C: Safeguards Contingency Plan*
  • Appendix 0: 0 Independent Spent Fuel Storage Installation (ISFSI) Security Program PG&E determined that the changes made to the PSP and appendices do not decrease safeguards effectiveness of the PSP.

Enciosure 1 contains a Table of Changes to DCPP's PSP and appendices, 10 CFR 50.54(p) evaluations and supporting documentation. Enclosure 1 contains Safeguards Information, which shall be withheld from public disclosure *under 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements.;, is Revision 14 of DCPP's PSP with appendices. Enclosure 2 contains Safeguards Information, which shall be withheld from public disclosure under 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements."

_$ob I A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek NtviS S2.?,

SAFEGUARDS INFORMATION ENCLOSUR E 1 TO THIS LETTER IS SAFEGUARDS INFORMATION.

ENCLOSUR E 2 TO THIS LETTER IS SAFEGUARDS INFORMATION.

tJl-t..

WHEN SEPARATE D FROM THE ENCLOSURES, THIS DOCUMENT IS DECONTROLLED. tJM~ S

SAFEGUARDS INFORMA TION ENCLOSURE 1 TO THIS LETTER IS SAFEGUAR DS INFORMATION.

ENCLOSURE 2 TO THIS LETTER IS SAFEGUAR DS INFORMATION.

Document Control Desk PG&E Letter DCL-19-036 April 18, 2019 PG&E Letter DIL-19-008

. Page 2 PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

Should you require further information, please contact Mr. Shawn Kirven, Director of Nuclear Security and Emergency Services at (805) 545-4005.

Sincerely, cf :: ~

James M. Welsch

  • Vice President, Nuclear Generation and Chief Nuclear Officer jy1e/4609/51000051 Enclosures cc: William C. Allen, P.E., NMSS Project Manager Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal; NRC Senior Project Manager cc/enc: Scott A. Morris, NRC Region IV Administrator (2)

A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek SAFEGUARDS INFORMA TION ENCLOSURE 1 TO THIS LETTER IS SAFEGUARDS INFORMATION.

ENCLOSURE 2 TO THIS LETTER IS SAFEGUARDS INFORMATION.

WHEN SEPARATED FROM THE ENCLOSURES, THIS DOCUMENT IS DECONTROLLED.

SAFEGUARDS INFORMATION THIS ENCLOSURE CONTAINS SAFEGUARDS INFORMATION.

Enclosure 1 PG&E Letter DCL-19-036 PG&E Letter DIL-19-008 Physical Security Plan Table of Changes and 10 CFR 50.54(p) Evaluations and Supporting Documentation*

SAFEGUARDS INFORMATION THIS ENCLOSURE CONTAINS SAFEGUARDS INFORMATION.

WHEN SEPARATED FROM THE ENCLOSURE, THIS COVER PAGE IS DECONTROLLED.

SAFEGUARDS INFORMATION THIS ENCLOSURE CONTAINS SAFEGUARDS INFORMATION.

Enclosure 2 PG&E Letter DCL-19-0 36 PG&E Letter DIL"'-19-008 Diablo Canyon Power Plant

  • Physical Security Plan, Revision 14 and Appendic es A, B, C, and D SAFEGUARDS INFORMATION THIS ENCLOSURE CONTAINS SAFEGUARDS INFORMATION.

, . WHEN SEPARATED FROM THE ENCLOSURE, THIS COVER PAGE IS DECONTROLLED.