DCL-18-096, Certification of Permanent Cessation of Power Operations

From kanterella
Jump to navigation Jump to search

Certification of Permanent Cessation of Power Operations
ML18331A553
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/27/2018
From: Welsch J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-18-096
Download: ML18331A553 (2)


Text

Pacific Gas and Electric Company" James M. Welsch Diablo Canyon Power Plant Vice President P.O. Box 56 Nuclear Generation and Avila Beach, CA 93424 Chief Nuclear Officer 805.545.3242 E-Mail: James.Welsch@pge.com November 27, 2018 PG&E Letter DCL-18-096 U.S. Nuclear Regulatory Commission 10 CFR 50.4 ATTN: Document Control Desk 10 CFR 50.82 Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units 1 and 2 Certification of Permanent Cessation of Power Operations

References:

1. PG&E Letter DCL-18-015, "Request to Withdraw the Diablo Canyon Power Plant License Renewal Application," dated March 7, 2018 (ML18066A937).
2. NRC Letter, "Response to Request to Withdraw the Diablo Canyon Power Plant, Unit Nos. 1 and 2, License Renewal Application," dated April 16, 2018 (ML18093A115).

Dear Commissioners and Staff:

On March 7, 2018, Pacific Gas and Electric Company (PG&E) withdrew the license renewal application (LRA) for Diablo Canyon Power Plant (DCPP) Units 1 and 2, and all associated correspondence and commitments (Reference 1). The U.S.

Nuclear Regulatory Commission (NRC) granted PG&E's request to withdraw the LRA, and all associated correspondence and commitments in a letter dated April 16, 2018 (Reference 2). PG&E's decision to withdraw the LRA was based on the determination that the continued baseload operation of the two DCPP units beyond the currently approved operating period~ is not necessary to meet PG&E's projected energy demand requirements. This decision was also in support of the state policy to meet California future electricity needs with renewable generation resources. This resource planning decision was approved by the California Public Utilities Commission in Decision 18-01-022, dated January 11, 2018.

Therefore, pursuant to 10 CFR 50.82(a)(1 )(i) and 10 CFR 50.4(b )(8), PG&E certifies that it will permanently cease power operations at DCPP, Units 1 and 2 on November 2, 2024, and August 26, 2025, respectively. This certification to permanently cease operations at DCPP Unit 2 on August 26, 2025, is dependent on an action by the California State Water Board that would allow Unit 2 to continue to A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Document Control Desk PG&E Letter DCL-18-096 November 27, 2018 Page 2 operate using the once through cooling system until the expiration of its operating license.

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions, please contact Mr. Hossein Hamzehee, Manager of Nuclear Regulatory Services, at (805) 545-4720.

I state under penalty of perjury that the foregoing is true and correct.

Executed on November 27, 2018.

Sincerely, Ja&w~

Vice President, Nuclear Generation and Chief Nuclear Officer cc: Diablo Canyon Distribution Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal, NRR Senior Project Manager A me m ber of the STARS All ianc e Ca ll away

  • Diab l o Ca nyon
  • Palo Verde
  • Wolf Cr eek