DCL-14-058, License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294)

From kanterella
(Redirected from DCL-14-058)
Jump to navigation Jump to search

License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294)
ML14209B076
Person / Time
Site: Diablo Canyon  
Issue date: 07/28/2014
From: Allen B
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-14-058, LAR 14-03, TSTF-432, Rev. 1, WCAP-16294
Download: ML14209B076 (41)


Text

Pacific Gas and Electric Company July 28, 2014 PG&E Letter DCL-14-058 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Diablo Canyon Units 1 and 2 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 License Amendment Request 14-03 Barry S. Allen Site Vice President 10 CFR 50.90 Diablo Canyon Power Plant Mail Code 104/6 P. 0. Box 56 Avila Beach, CA 93424 805.545.4888 Internal: 691.4888 Fax: 805.545.6445 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-432. Revision 1. "Change in Technical Specification End States (WCAP-16294)"

Dear Commissioners and Staff:

Pursuant to 10 CFR 50.90, Pacific Gas and Electric Company (PG&E) hereby requests approval of the enclosed proposed amendment to Facility Operating License Nos. DPR-80 and DPR-82 for Units 1 and 2 of the Diablo Canyon Power Plant, respectively. The enclosed license amendment request (LAR) proposes to modify the Technical Specifications (TS) to risk-inform requirements regarding selected Required Action End States.

The enclosure provides an evaluation of the proposed change. Attachment 1 to the Enclosure provides markup pages of existing TS to show the proposed change. to the Enclosure provides revised (clean) TS pages. Attachment 3 to the Enclosure provides the marked up TS Bases for information only.

PG&E submitted the LAR for Technical Specification Task Force traveler TSTF-505 in PG&E Letter DCL-13-1 06, "License Amendment Request 13-02 Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, 'Provide Risk-Informed Extended Completion Times-RITSTF Initiative 48,"' dated November 25, 2013. The LAR for TSTF-505 revised some of the same TS pages as those revised by this LAR. The required TS changes to the TSTF-505 TS contained in Attachment 2 to PG&E Letter DCL-13-1 06 to appropriately implement TSTF-432, Revision 1, are contained in Attachment 4 to the Enclosure.

PG&E requests approval of this LAR no later than July 29, 2015. PG&E requests the license amendments be made effective upon NRC issuance, to be implemented within 120 days from the date of issuance.

A member of the STARS (Strategic Teaming and Resource Sharing)

Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Document Control Desk July 28, 2014 Page 2 PG&E Letter DCL-14-058 PG&E makes no regulatory commitments (as defined by NEI 99-04) in this letter.

This letter includes no revisions to existing regulatory commitments.

In accordance with site administrative procedures and the Quality Assurance Program, the proposed amendment has been reviewed by the Plant Staff Review Committee.

Pursuant to 10 CFR 50.91, PG&E is sending a copy of this proposed amendment to the California Department of Public Health.

If you have any questions or require additional information, please contact Mr. Tom Baldwin at 805-545-4720.

I state under penalty of perjury that the foregoing is true and correct.

Executed on July 28, 2014.

Sincerely,

-15~5.

Barry S. iJen Site Vice President kjse/4328 SAPN 50636291 Enclosure cc:

Diablo Distribution cc/enc:

Peter J. Bamford, NRR Project Manager Marc L. Dapas, NRC Region IV Thomas R. Hipschman, NRC Senior Resident Inspector Gonzalo L. Perez, Branch Chief, California Dept of Public Health A

member of the STARS (Strategic Teaming and Resource Sharing)

Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Enclosure PG&E Letter DCL-14-058 Evaluation of the Proposed Change License Amendment Request 14-03 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1, "Change in Technical Specification End States (WCAP-16294)"

1. DESCRIPTION
2. ASSESSMENT 2.1 Applicability of Topical Report, TSTF-432, and Published Safety Evaluation 2.2 Optional Changes and Variations
3. REGULATORY EVALUATION 3.1 Significant Hazards Consideration 3.2 Applicable Regulatory Requirements/Criteria
4. ENVIRONMENTAL EVALUATION
5. REFERENCES ATTACHMENTS:
1. Proposed Technical Specification Changes
2. Revised Technical Specification Page(s)
3. Technical Specification Bases Changes
4. Proposed Technical Specification Changes for Proposed TSTF-505 Technical Specifications

EVALUATION

1.

DESCRIPTION Enclosure PG&E Letter DCL-14-058 This letter is a request to amend Operating Licenses DPR-80 and DPR-82 for Units 1 and 2 of the Diablo Canyon Power Plant (DCPP), respectively. The proposed amendment would modify technical specifications (TS) to risk-inform requirements regarding selected Required Action End States. The changes are consistent with Technical Specification Task Force (TSTF) Standard Technical Specification (STS) Change Traveler TSTF-432, Revision 1, "Change in Technical Specifications End States (WCAP-16294)," (Reference 1). The availability of this TS improvement was announced in the Federal Register on May 11, 2012 (77 FR 27814) (Reference 2), as part of the consolidated line item improvement process (CLIIP).

2.

ASSESSMENT 2.1 Applicability of Topical Report, TSTF-432, and Published Safety Evaluation Pacific Gas and Electric Company (PG&E) has reviewed Westinghouse Topical Report (TR) WCAP-16294 (Reference 3), the Nuclear Regulatory Commission (NRC) safety evaluation (SE) for WCAP-16294 (Reference 4), TSTF-432, Revision 1 (Reference 1), and the NRC model SE in Reference 2. PG&E has concluded that the technical bases described in the WestinghouseTR and TSTF-432, as well as the associated SEs prepared by the NRC staff are applicable to DCPP Units 1 and 2 and support incorporation of this amendment request into the DCPP Units 1 and 2 TS.

Table 1, "Summary of DCPP Units 1 and 2 Proposed Changes to End States," is included in this License Amendment Request (LAR) to provide a summary comparison of the proposed DCPP end state changes to those changes approved in the NRC Staff's model SE. Table 1 is based on the table titled, "Proposed Changes to End States," contained in the NRC Staff's model SE (Pages 7 -9).

PG&E previously submitted an LAR for TSTF-505 in PG&E Letter DCL-13-1 06, "License Amendment Request 13-02 Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505 (ML13330A557), Revision 1, 'Provide Risk-Informed Extended Completion Times-RITSTF Initiative 48,"' dated November 25, 2013. The LAR for TSTF-505 includes changes toTS 3.3.2, 3.6.6.A, 3.7.7, 3.7.8, 3.8.1, 3.8.4, 3.8.7, and 3.8.9, including addition of newTS Conditions for inoperability of multiple channels, trains, or systems that results in a complete loss of safety function (e.g., two engineered safety feature actuation system 1

Enclosure PG&E Letter DCL-14-058 instrumentation trains inoperable, one containment spray train and two containment fan cooling unit trains inoperable, two or more Diesel Generators (DGs) and one or more required offsite circuits inoperable).

The TSTF-432 changes toTS 3.3.2, 3.6.6.A, 3.7.7, 3.7.8, 3.8.1, 3.8.4, 3.8.7, and 3.8.9 do not include conditions in which there is a complete loss of safety function. The required revisions to the TS contained in the LAR for TSTF-505 to appropriately implement the TSTF-432 changes (forTS conditions where there is no complete loss of safety function) are described in the Notes column in Table 1.The required TS changes to the TS contained in Attachment 2 to PG&E Letter DCL-13-1 06 are contained in Attachment 4 to the Enclosure of this letter.

2.2 Optional Changes and Variations PG&E is not proposing any variations or deviations from the Westinghouse topical report, the TS changes described in the TSTF-432 Revision 1, or the NRC Staff's model SE published in the Federal Register on May 11, 2012 (77 FR 27814), as part of the CLIIP Notice of Availability.

3.

REGULATORY EVALUATION 3.1 Significant Hazards Consideration PG&E has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:

1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The proposed change modifies the end state (e.g., mode or other specified condition) which the Required Actions specify must be entered if compliance with the Limiting Conditions for Operation (LCO) is not restored. The requested Technical Specifications (TS) permit an end state of Mode 4 rather than an end state of Mode 5 contained in the current TS. In some cases, other Conditions and Required Actions are revised to implement the proposed change. Required Actions are not an initiator of any accident previously evaluated. Therefore, the proposed change does not affect the probability of any accident previously evaluated. The affected systems continued to be required to be operable by the TS and the Completion Times specified in the TS to restore equipment to operable status or take other remedial Actions remain 2

Enclosure PG&E Letter DCL-14-058 unchanged. WCAP-16294-NP-A, Revision 1, "Risk-Informed Evaluation of Changes to Tech Spec Required Action Endstates for Westinghouse NSSS PWRs," demonstrates that the proposed change does not significantly increase the consequences of any accident previously evaluated.

Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different accident from any accident previously evaluated?

Response: No.

The proposed change modifies the end state (e.g., mode or other specified condition) which the Required Actions specify must be entered if compliance with the LCO is not restored. In some cases, other Conditions and Required Actions are revised to implement the proposed change.

The change does not involve a physical alteration of the plant (i.e., no new or different type of equipment will be installed) or a change in the methods governing normal plant operation. In addition, the change does not impose any new requirements. The change does not alter assumptions made in the safety analysis.

Therefore, the proposed change does not create the possibility of a new or different accident from any accident previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?

Response: No.

The proposed change modifies the end state (e.g., mode or other specified condition) which the Required Actions specify must be entered if compliance with the LCO is not restored. In some cases, other Conditions and Required Actions are revised to implement the proposed change.

Remaining within the Applicability of the LCO is acceptable because WCAP-16294-NP-A demonstrates that the plant risk in MODE 4 is similar to, or lower than, MODE 5. As a result, no margin of safety is significantly affected.

Therefore, the proposed change does not involve a significant reduction in a margin of safety.

Based on the above evaluation, PG&E concludes that the proposed change does not involve a significant hazards consideration under the 3

Enclosure PG&E Letter DCL-14-058 standards set forth in 10 CFR 50.92(c), and accordingly, a finding of "no significant hazards consideration" is justified.

3.2 Applicable Regulatory Requirements/Criteria A description of the proposed TS change and its relationship to applicable regulatory requirements were published in the Federal Register Notice of Availability on May 11, 2012 (77 FR 27814). PG&E has reviewed the NRC Staff's model SE referenced in the CLIIP Notice of Availability and concluded that the regulatory evaluation section is applicable to DCPP Units 1 and 2.

4.

ENVIRONMENTAL CONSIDERATION PG&E has evaluated the proposed amendment and has determined that the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.

5.

REFERENCES

1.

TSTF-432, Revision 1, "Change in Technical Specifications End States WCAP-16294," dated November 29, 2010 (NRC ADAMS Accession number ML103360003).

2.

Federal Register, (77 FR 27814), "Model Safety Evaluation for Plant-Specific Adoption of Technical Specifications Task Force Traveler TSTF-432, Revision 1, 'Change in Technical Specifications End States (WCAP-16294)' Using the Consolidated Line Item Improvement Process," May 11, 2012.

3.

WCAP-16294-NP-A, Revision 1, "Risk-Informed Evaluation of Changes to Technical Specification Required Action Endstates for Westinghouse NSSS PWRs," June 2010 (NRC ADAMS Accession Number ML052620374).

4.

Final Safety Evaluation for NEI Topical Report WCAP-16294-NP, Revision 0, "Risk-Informed Evaluation of Changes to Technical Specification Required Endstates for Westinghouse NSSS [Nuclear Steam Supply System] PWRs [Pressurized Water Reactors]," March 29, 2010 (NRC ADAMS Accession Number ML100820533).

4

Enclosure PG&E Letter DCL-14-058

5.

PG&E Letter DCL-13-106, "License Amendment Request 13-02 Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, 'Provide Risk-Informed Extended Completion Times-RITSTF Initiative 48,"' dated November 25, 2013 (ML13330A557).

5

NUREG-1431 TS 3.3.2 Engineered Safety Feature Actuation System (ESFAS)

Instrumentation Functions: 1.a, 2.a, 3.a(1), 3.b(1), and 7.a Enclosure PG&E Letter DCL-14-058 Table 1 - Summary of DCPP Units 1 and 2 Proposed Changes to End States DCCP TS TS Current Proposed Notes Required End State(s),

End Actions Completion State(s),

The Affected NUREG-1431 TS Numbers Times (CTs)

CTs and Titles are Provided for Comparison 3.3.2 Engineered Safety 8.2.2 Mode 5 in 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> Mode 4 in The DCPP TS do not include the NUREG-1431 Feature Actuation 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> Function 7.a for Automatic Switchover to System (ESFAS) 88.2 (for Containment Sump: Automatic Action Logic and Instrumentation LAR 13-02 Actuation Relays. In DCPP Units 1 and 2 the Functions: 1.a, 2.a, for TSTF-switchover to containment sump recirculation is 3.a(1), and 3.b(1) 505 accomplished manually.

Revision

1)

TS 3.3.2 Condition 88, Required Actions 88.1 and 88.2 contained in LAR 13-02 for TSTF-505, Revision 1, applicable to TS 3.3.2, Condition 8 in of this LAR not met, requires the unit to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. TS 3.3.2, Condition CC, Required Actions CC.1 and CC.2 contained in LAR 13-02 for TSTF-505, Revision 1, require unit to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Upon approval of this LAR, the Condition 88 applicable to TS 3.3.2, Condition 8 not met contained in LAR 13-02 for TSTF-505, Revision 1 (same as TS 3.3.2, Condition 8 of this LAR), would be changed to apply to the Required Action and associated Completion Time of Conditions 8, D, F, G, H, I, J, K, L, U, or V not met, and the Required Action 88.2 would be revised to be in MODE 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (MODE 3 time plus 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />). A note would be added to Required Action 88.2 that LCO 3.0.4.a is not applicable when entering MODE 4. Condition CC would be changed to apply to the Required Action and associated Completion Time of Conditions C, E, S, T, X, Y, Z, or AA not met and the Required Action CC.2 would be revised to be in MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. See Attachment 4 to the Enclosure for the TS markup.

6

NUREG-1431 TS DCCP TS TS Current Required End State(s),

Actions Completion Times (CTs) 3.3.2 Engineered Safety 3.3.2 Engineered Safety C.2.2 Mode 5 in 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> Feature Actuation Feature Actuation System (ESFAS)

System (ESF AS) 88.2 (for Instrumentation Instrumentation LAR 13-02 Functions: 1.b, 2.b, Functions: 1.b, 2.b, forTSTF-3.a(2), and 3.b(2) 3.a(2), and 3.b(2) 505 Revision

1) 7 Proposed End State(s),

CTs Mode 4 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Enclosure PG&E Letter DCL-14-058 Notes The Affected NUREG-1431 TS Numbers and Titles are Provided for Comparison TS 3.3.2 Condition 88, Required Actions 88.1 and 88.2 contained in LAR 13-02 for TSTF-505, Revision 1, applicable to TS 3.3.2 Condition C in of this LAR not met, requires the unit to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. TS 3.3.2, Condition CC, Required Actions CC.1 and CC.2 contained in LAR 13-02 for TSTF-505, Revision 1, require unit to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Upon approval of this LAR, the Condition 88 applicable to TS 3.3.2, Condition D not met contained in LAR 13-02 for TSTF-505 Rev.1 (same as TS 3.3.2, Condition C of this LAR) would be changed to apply to the Required Action and associated Completion Time of Conditions 8, D, F, G, H, I, J, K, L, U, or V not met and the Required Action 88.2 would be revised to be in MODE 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (MODE 3 time plus 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />). A note would be added to Required Action 88.2 that LCO 3.0.4.a is not applicable when entering MODE 4. Condition CC would be changed to apply to the Required Action and associated Completion Time of Conditions C, E, S, T, X, Y, Z, or AA not met and the Required Action CC.2 would be revised to be in MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. See Attachment 4 to the Enclosure for the TS markup.

NUREG-1431 TS DCCP TS TS Required Actions 3.3.2 Engineered Safety N/A Feature Actuation System (ESFAS)

Instrumentation Functions: 7.b and 7.c 3.3. 7 Control Room 3.3. 7 Control Room C.2 Emergency Filtration Ventilation System System (CREFS)

(CRVS) Actuation Actuation Instrumentation Instrumentation 3.3.8 Fuel Building Air 3.3.8 Fuel Building N/A Cleanup System Ventilation System (FBACS) Actuation (FBVS) Actuation Instrumentation Instrumentation 3.4.13 RCS Operational 3.4.13 RCS Operational B.2 Leakage LEAKAGE 3.4.14 RCS Pressure 3.4.14 RCS Pressure B.2 Isolation Valve Leakage Isolation Valve (PIV)

Leakage 3.4.15 RCS Leakage 3.4.15 RCS Leakage F.2 Detection Detection Instrumentation Instrumentation Current Proposed End State(s),

End Completion State(s),

Times (CTs)

CTs Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 8

Enclosure PG&E Letter DCL-14-058 Notes The Affected NUREG-1431 TS Numbers and Titles are Provided for Comparison The DCPP TS do not include the NUREG-1431, Function 7.b Automatic Switchover to Containment Sump-Refueling Water Storage Tank (RWST)

Level - Low Low Coincident with Safety Injection, or Function 7.c Automatic Switchover to Containment Sump-RWST Level - Low Low Coincident with Safety Injection and Coincident with Containment Sump Level - High. In DCPP Units 1 and 2, the switchover to containment sump recirculation is accomplished manually.

The DCPP FBVS actuation instrumentation specified in TS 3.3.8 is only required Operable during movement of recently irradiated fuel assemblies in the fuel handling building.

The affected NUREG-1431 Required Action is E.2.

The corresponding DCPP Required Action is F.2.

NUREG-1431 TS DCCP TS TS Current Required End State(s),

Actions Completion Times (CTs) 3.5.3 ECCS - Shutdown 3.5.3 ECCS - Shutdown C.1 Mode 5 in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 3.5.4 Refueling Water 3.5.4 Refueling Water C.2 Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Storage Tank (RWST)

Storage Tank (RWST) 9 Proposed End State(s),

CTs See note Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Enclosure PG&E Letter DCL-14-058 Notes The Affected NUREG-1431 TS Numbers and Titles are Provided for Comparison In accordance with TSTF-432, Condition B and C of TS 3.5.3 are deleted. This change would allow DCPP Units 1 and 2 remain in Mode 4 rather than transitioning to Mode 5.

Also, in accordance with TSTF-432, Condition A and Required Action A.1 is revised to refer to the "required ECCS train" consistent with the LCO requirement for one ECCS train to be Operable.

NUREG-1431 TS DCCP TS TS Current Required End State(s),

Actions Completion Times (CTs) 3.6.6A Containment 3.6.6 Containment B.2 Mode 5 in 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> Spray and Cooling Spray and Cooling Systems (Atmospheric Systems E.2 Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> and Dual)

F.2 (for LAR 13-02 for TSTF-505 Rev.1) 3.6.6B Containment N/A Spray and Cooling Systems (Atmospheric and Dual) 10 Proposed End State(s),

CTs Mode 4 in 54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br /> Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Enclosure PG&E Letter DCL-14-058 Notes The Affected NUREG-1431 TS Numbers and Titles are Provided for Comparison TS 3.6.6, Condition F, Required Actions F.1 and F.2, contained in LAR 13-02 for TSTF-505, Revision 1, applicable toTS 3.6.6, Conditions C, D, or E not met, require the units to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Note, the current TS 3.6.6 Conditions E and F are revised by LAR 13-02 for TSTF-505, Revision 1. Upon approval of this LAR, the Condition F contained in LAR 13-02 for TSTF-505, Revision 1, would be revised to apply to the Required Action and associated Completion Time of Condition C or D not met and Required Action F.2 would be changed to require the unit to be in MODE 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. A note would be added to Required Action F.2 that LCO 3.0.4.a is not applicable when entering MODE 4.

In addition, a new Condition G would be added to apply to the Required Action and associated Completion Time of ConditionE (Two containment spray trains inoperable OR One containment spray train inoperable and the CFCU system inoperable such that one or less CFCUs remain OPERABLE OR the CFCU system inoperable such that one or less CFCUs remain OPERABLE) not met with Required Action G.1 to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Required Action G.2 to be in MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (the existing end states forTS 3.6.6).

Not applicable to DCPP Units 1 and 2 where credit is taken for iodine removal by the Containment Spray consistent with NUREG-1431 TS 3.6.6A (above).

NUREG-1431 TS DCCP TS TS Required Actions 3.6.6C Containment N/A Spray System (Ice Condenser) 3.6.6D Quench Spray N/A (QS) System (Subatmospheric) 3.6.6E Recirculation N/A Spray (RS) System (Subatmospheric) 3.6. 7 Spray Additive 3.6. 7 Spray Additive 8.2 System (Atmospheric, System Subatmospheric, Ice Condenser, and Dual) 3.6.11 Iodine Cleanup N/A System (ICS)

(Atmospheric and Subatmospheric) 3.6.12 Vacuum Relief N/A Valves (Atmospheric and Ice Condenser) 3.6.13 Shield Building N/A Air Cleanup System (SBACS) (Dual and Ice Condenser)

Current Proposed End State(s),

End Completion State(s),

Times (CTs)

CTs Mode 5 in 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> Mode 4 in 54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br /> 11 Enclosure PG&E Letter DCL-14-058 Notes The Affected NUREG-1431 TS Numbers and Titles are Provided for Comparison Not included in the DCPP Units 1 and 2 TS.

Not included in the DCPP Units 1 and 2 TS.

Not included in the DCPP Units 1 and 2 TS.

Not included in the DCPP Units 1 and 2 TS.

Not included in the DCPP Units 1 and 2 TS.

Not included in the DCPP Units 1 and 2 TS.

I I

NUREG-1431 TS DCCP TS TS Current Required End State(s),

Actions Completion Times (CTs) 3.6.14 Air Return N/A System (ARS) (Ice Condenser) 3.6.18 Containment N/A Recirculation Drains (Ice Condenser) 3.7.7 Component 3.7.7 Vital Component 8.2 Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Cooling Water (CCW)

Cooling Water (CCW)

System System C.2 (for LAR 13-02 forTSTF-505 Rev.1) 12 Proposed End State(s),

CTs Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Enclosure PG&E Letter DCL-14-058 Notes The Affected NUREG-1431 TS Numbers and Titles are Provided for Comparison Not included in the DCPP Units 1 and 2 TS.

Not included in the DCPP Units 1 and 2 TS.

TS 3.7.7, Condition C, Required Actions C.1 and C.2, contained in LAR 13-02 for TSTF-505, Revision 1, applicable to TS 3. 7. 7 Conditions A or B not met, requires the unit to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Upon approval of this LAR, Condition C contained in LAR 13-02 for TSTF-505, Revision 1 would be revised to apply to the Required Action and associated Completion Time of Condition A not met and Required Action C.2 would be changed to require the unit to be in MODE 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. A note would be added to Required Action C.2 that LCO 3.0.4.a is not applicable when entering MODE 4.

In addition, a new Condition D would be added to apply to the Required Action and associated Completion Time of Condition B (two vital component cooling water (CCW) loops inoperable) not met with Required Action D.1 to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Required Action D.2 to be in MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (the existing end states forTS 3.7.7).

NUREG-1431 TS DCCP TS TS Current Required End State(s),

Actions Completion Times (CTs) 3.7.8 Service Water 3.7.8 Auxiliary Saltwater 8.2 Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> System (SWS)

(ASW) System C.2 (for LAR 13-02 forTSTF-505 Rev.1) 3.7.9 Ultimate Heat Sink

3. 7.9 Ultimate Heat 8.2 Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (UHS)

Sink (UHS)

3. 7.1 0 Control Room 3.7.10 Control Room C.2 Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Emergency Filtration Ventilation System System (CREFS)

(CRVS) 13 Proposed End State(s),

CTs Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Enclosure PG&E Letter DCL-14-058 Notes The Affected NUREG-1431 TS Numbers and Titles are Provided for Comparison TS 3.7.8, Condition C, Required Actions C.1 and C.2, contained in LAR 13-02 for TSTF-505, Revision 1, applicable toTS 3.7.8 Conditions A or 8 not met, require unit to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Upon approval of this LAR, Condition C contained in LAR 13-02 for TSTF-505, Revision 1 would be revised to apply to the Required Action and associated Completion Time of Condition A not met and Required Action C.2 would be changed to require unit to be in MODE 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. A note would be added to Required Action C.2 that LCO 3.0.4.a is not applicable when entering MODE 4.

In addition, a new Condition D would be added to apply to the Required Action and associated Completion Time of Condition 8 (two ASW trains inoperable) not met with Required Action D.1 to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Required Action D.2 to be in MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (the existing end states forTS 3.7.8).

The affected NUREG-1431 Required Action is C.2.

The corresponding DCPP Required Action is 8.2.

NUREG-1431 TS DCCP TS TS Required Actions

3. 7.11 Control Room N/A Emergency Air Temperature Control System (CREATCS)
3. 7.12 Emergency Core 3.7.12 Auxiliary Building C.2 Cooling System (ECCS)

Ventilation System Pump Room Exhaust (ABVS)

Air Cleanup System (PREACS) 3.7.13 Fuel Building Air 3.7.13 Fuel Handling N/A Cleanup System Building Ventilation (FBACS)

System (FHBVS) 3.7.14 Penetration N/A Room Exhaust Air Cleanup System (PREACS)

Current Proposed End State(s),

End Completion State(s),

Times (CTs)

CTs Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 14 Enclosure PG&E Letter DCL-14-058 Notes The Affected NUREG-1431 TS Numbers and Titles are Provided for Comparison Not included in the DCPP Units 1 and 2 TS.

The DCPP FHBVS is only required Operable during movement of recently irradiated fuel assemblies in the fuel handling building.

Not included in the DCPP Units 1 and 2 TS.

NUREG-1431 TS DCCP TS TS Current Required End State(s),

Actions Completion Times (CTs) 3.8.1 AC Sources -

3.8.1 AC Sources -

H.2 Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Operating Operating J.2 (for LAR 13-02 for TSTF-505 Rev.1) 15 Proposed End State(s),

CTs Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Enclosure PG&E Letter DCL-14-058 Notes The Affected NUREG-1431 TS Numbers and Titles are Provided for Comparison The affected NUREG-1431 Required Action is G.2.

The corresponding DCPP Required Action is H.2.

TS 3.8.1, Condition J, Required Actions J.1 and J.2 contained in LAR 13-02 for TSTF-505, Revision 1, applicable toTS 3.8.1 Conditions A through I not met, requires the unit to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Note, the current TS 3.8.1, Conditions H, I, and J are revised by the LAR 13-02 for TSTF-505, Revision 1. Upon approval of this LAR, Condition J contained in LAR 13-02 for TSTF-505, Revision 1 would be revised to apply to the Required Action and associated Completion Time of Conditions A through G not met and Required Action J.2 would be changed to require the unit to be in MODE 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. A note would be added to Required Action J.2 that LCO 3.0.4.a is not applicable when entering MODE 4.

In addition, a new Condition K would be added to apply to the Required Action and associated Completion Time of Conditions H (two or more DGs inoperable AND one or more required offsite circuits inoperable) or I (one or more DGs inoperable AND two required offsite circuits inoperable) not met with Required Action K.1 to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Required Action K.2 to be in MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (the TSTF-505 end state forTS 3.8.1 Condition Required Actions not met).

I

NUREG-1431 TS DCCP TS TS Current Required End State(s),

Actions Completion Times (CTs) 3.8.4 DC Sources-3.8.4 DC Sources -

E.2 Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Operating Operating F.2 (for LAR 13-02 for TSTF-505 Rev.1) 16 Proposed End State(s),

CTs Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Enclosure PG&E Letter DCL-14-058 Notes The Affected NUREG-1431 TS Numbers and Titles are Provided for Comparison The affected NUREG-1431 Required Action is D.2.

The corresponding DCPP Required Action is E.2.

TS 3.8.4, Condition F, Required Actions F.1 and F.2, contained in LAR 13-02 for TSTF-505, Revision 1, applicable to TS 3.8.4 Conditions A through E not met, requires the unit to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Upon approval of this LAR, Condition F contained in LAR 13-02 for TSTF-505, Revision 1 would be revised to apply to the Required Action and associated Completion Time of Conditions A through D not met and Required Action F.2 would be changed to require the unit to be in MODE 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. A note would be added to Required Action F.2 that LCO 3.0.4.a is not applicable when entering MODE 4.

In addition, a new Condition G would be added to apply to the Required Action and associated Completion Time of Condition E (two DC electrical power subsystems inoperable) not met with Required Action G.1 to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Required Action G.2 to be in MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (the TSTF-505 end state forTS 3.8.4 Condition Required Actions not met).

NUREG-1431 TS DCCP TS TS Current Required End State(s),

Actions Completion Times (CTs) 3.8. 7 Inverters-3.8. 7 Inverters-8.2 Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Operating Operating C.2 (for LAR 13-02 for TSTF-505 Rev.1) 17 Proposed End State(s),

CTs Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

__ L__

Enclosure PG&E Letter DCL-14-058 Notes The Affected NUREG-1431 TS Numbers and Titles are Provided for Comparison TS 3.8.7, Condition C, Required Actions C.1 and C.2, contained in LAR 13-02 for TSTF-505, Revision 1, applicable to TS 3.8. 7 Conditions A or B not met, requires the unit to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Upon approval of this LAR the Condition C contained in LAR 13-02 for TSTF-505, Revision 1 would be revised to apply to the Required Action and associated Completion Time of Condition A not met and Required Action C.2 would be changed to require the unit to be in MODE 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. A note would be added to Required Action C.2 that LCO 3.0.4.a is not applicable when entering MODE 4.

In addition, a new Condition D would be added to apply to the Required Action and associated Completion Time of Condition B (two or more required inverters inoperable) not met with Required Action D.1 to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Required Action D.2 to be in MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (the TSTF-505 end state for TS 3.8. 7 Condition Required Actions not met).

NUREG-1431 TS DCCP TS TS Current Proposed Required End State(s),

End Actions Completion State(s),

Times (CTs)

CTs 3.8.9 Distribution 3.8.9 Distribution D.2 Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Mode 4 in Systems - Operating Systems-Operating 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

[Recirculation Fluid pH N/A Control System]

18 Enclosure PG&E Letter DCL-14-058 Notes The Affected NUREG-1431 TS Numbers and Titles are Provided for Comparison TS 3.8.9, Condition D, Required Actions D.1 and D.2, contained in LAR 13-02 for TSTF-505, Revision 1, applicable toTS 3.8.9 Conditions A through C not met, requires the unit to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

Note: the current TS 3.8.9 Condition E is removed by LAR 13-02 for TSTF-505, Revision 1. Upon approval of this LAR, Condition D contained in LAR 13-02 for TSTF-505, Revision 1 would be revised to apply to the Required Action and associated Completion Time of Condition A, B, or C not met AND one AC electrical power distribution subsystem inoperable OR one 120 VAG vital bus subsystem inoperable OR one DC electrical power distribution subsystem inoperable, and Required Action D.2 would be changed to require the unit to be in MODE 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. A note would be added to Required Action D.2 that LCO 3.0.4.a is not applicable when entering MODE 4.

In addition, a new Condition E would be added to apply to the Required Action and associated Completion Time of Condition A, B, or C not met AND more than one AC electrical power distribution subsystem inoperable OR more than one 120 VAG vital bus subsystem inoperable OR more than one DC electrical power distribution subsystem inoperable, with Required Action E.1 to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Required Action E.2 to be in MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (the TSTF-505 end state for TS 3.8.9 Condition Required Actions not met).

Not included in the DCPP Units 1 and 2 TS.

I I

Enclosure PG&E Letter DCL-14-058 Proposed Technical Specification Change(s)

3.3 INSTRUMENTATION ESFAS Instrumentation 3.3.2 3.3.2 Engineered Safety Feature Actuation System (ESFAS) Instrumentation LCO 3.3.2 The ESFAS instrumentation for each Function in Table 3.3.2-1 shall be OPERABLE.

APPLICABILITY:

According to Table 3.3.2-1.

ACTIONS


NOTE-------------------------------------------------------------

Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION A.

One or more Functions with A.1 one or more required Enter the Condition referenced in Table 3.3.2-1 for the channel(s) or train(s).

channels or trains inoperable.

B.

One channel or train inoperable.

C.

One train inoperable.

B.1 Restore channel or train to OPERABLE status.

OR B.2.1 Be in MODE 3 AND B.2.2 Be in MODE §1.


NOTE-----------------

One train may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing provided the other train is OPERABLE.

C.1 OR Restore train to OPERABLE status.

C.2.1 Be in MODE 3 AND C.2.2 Be in MODE §1.

COMPLETION TIME Immediately 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> Insert 1 54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br /> 84---60 hours 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Insert 1 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> gg.._35 hours (continued)

DIABLO CANYON - UNITS 1 & 2 3.3-19 Unit 1 -Amendment No. 3§, 7-9, Unit 2 - Am¢ildment No. 3§, 4-84-,

3.3 INSTRUMENTATION CRVS Actuation Instrumentation 3.3.7 3.. 3.7 Control Room Ventilation System (CRVS) Actuation Instrumentation LCO 3.3.7 The CRVS actuation instrumentation for each Function in Table 3.3.7-1 shall be OPERABLE.

APPLICABILITY:

According to Table 3.3.7-1.

ACTIONS


~----------------------------------------------NOTES-------------------------------------------------------

1. Separate Condition entry is allowed for each Function.
2. Functions are common to both units.

CONDITION A.

One or more Functions with A. 1 one channel or train inoperable.

B.

One or more Functions with B.1.1 two channels or two trains inoperable.

B.1.2 C.

Required Action and C.1 associated Completion AND Time for Condition A orB not met in MODE 1, 2, C.2 3, or4.

DIABLO CANYON - UNITS 1 & 2 REQUIRED ACTION COMPLETION TIME Place one CRVS train in 7 days pressurization mode.

Place one CRVS train in Immediately pressurization mode.

AND Enter applicable Immediately Conditions and Required Actions for one CRVS train made inoperable by inoperable CRVS Insert 1 actuation v

instrumentation.

/

Be in MOD~

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Be in MODE §1.

  • Rhours (continued) 3.3-47 Unit 1 -Amendment No. ~,

Unit 2 -Amendment No. ~,

RCS Operational LEAKAGE 3.4.13 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.13 RCS Operational LEAKAGE LCO 3.4.13 RCS operational LEAKAGE shall be limited to:

a.

No pressure boundary LEAKAGE;

b.

1 gpm unidentified LEAKAGE;

c.

1 0 gpm identified LEAKAGE; and

-+-e

d.

150 gallons per day primary to secondary LEAKAGE through any one steam generator (SG).

~

APPLICABILITY:

MODES 1, 2, 3*, and 4*.

ACTIONS A.

B.

CONDITION REQUIRED ACTION COMPLETION TIME RCS operational LEAKAGE A. 1 Reduce LEAKAGE to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> not within limits for reasons within limits.

other than pressure boundary LEAKAGE or primary to secondary LEAKAGE.

Required Action and B.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion AND Insert 1 Time of Condition A not met.

~

OR Pressure boundary B.2 Be in MODE §1.

~.12_hours LEAKAGE exists.

OR Primary to secondary LEAKAGE not within limit.

For MODES 3 and 4, if steam generator water samples indicate less than the minimum detectable activity of 5.0 E-7 microcuries/ml for principal gamma emitters, the leakage requirement of specification 3.4.13.d. may be considered met.

3.4-27 DIABLO CANYON - UNITS 1 & 2 Unit 1 -Amendment No. 4Ja ~, 4-94, Unit 2 -Amendment No. 4Ja ~, 4-99,

RCS PIV leakage 3.4.14 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued)

A.2.1 Isolate the high pressure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> portion of the affected system from the low pressure portion by use of a second closed manual, deactivated automatic, or check valve.

OR A.2.2 Restore RCS PIV to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> within limits.

B.

Required Action and B.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion

~ Insert 1 Time for Condition A not AND met.

8.2 Be in MODE §1.

3&-j£hours SURVEILLANCE REQUIREMENTS SR 3.4.14.1 SURVEILLANCE


NOTES-------------------------------

1.

Not required to be performed in MODES 3 and 4.

2.

Not required to be performed on the RCS PIVs located in the RHR flow path when in the shutdown cooling mode of operation.

3.

RCS PIVs actuated during the performance of this Surveillance are not required to be tested more than once if a repetitive testing loop cannot be avoided.

3.4-30 FREQUENCY DIABLO CANYON - UNITS 1 & 2 Unit 1 -Amendment No. ~~ 442, Unit 2 - Amendment No. ~~ 442,

ACTIONS (continued)

CONDITION D.

Any containment sump D.1 monitor inoperable.

AND Containment atmosphere AND particulate radioactivity D.2.1 monitor inoperable.

AND Required CFCU D.2.2 condensate collection monitor inoperable.

D.2.3 E.

All required monitors E.1 inoperable.

F.

Required Action and F.1 associated Completion AND Time not met.

F.2 DIABLO CANYON - UNITS 1 & 2 RCS Leakage Detection Instrumentation 3.4.15 REQUIRED ACTION COMPLETION TIME Analyze grab samples of Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> the containment atmosphere.

Restore containment 7 days sump monitor to OPERABLE status.

OR Restore containment 7 days atmosphere particulate radioactivity monitor to OPERABLE status.

OR Restore required CFCU 7 days condensate collection monitor to OPERABLE status.

Enter LCO 3.0.3.

Immediately Be in MODE 3.

=) hntJr~

Insert 1 Be in MODE §1.

~Rhours 3.4-34 Unit 1 - Amendment No. 4-ae,~,~,

Unit 2 -Amendment No. 4-ae,2G4,2-U,

ECCS - Shutdown 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.3 ECCS - Shutdown LCO 3.5.3 One ECCS train shall be OPERABLE.


NOTE-----------------------------------------------------

An RHR train may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned to the ECCS mode of operation.

APPLICABILITY:

MODE 4.

ACTIONS


NOTE-------------------------------------------------------------

LCO 3.0.4b is not applicable to ECCS Centrifugal Charging Pump subsystem.

Insert 1


~

CONDITION REQUIRED AC~

,IC A.

Required ECCS resiEI~:;~al A.1 Initiate action to restore heat removal (RHR) required ECCS RI=4R s~:;~bsystem train inoperable.

s~:;~bsystemtrain to OPERABLE status.

B.

ReEI~:;~ireEI EGGS 8.1 Restore FeEI~:;~ireEI EGGS GeRtrif~:;~§al Ghar§iR§ P~:;~FA~

GeRtrif~:;~§al Ghar§iR§ s~:;~bsysteFA iRo~erable.

P~:;~FA~ s~:;~bsystem to GPERABbE stat~:;~s.

G.

ReEI~:;~ireEI AetioR aREI G.1 Be iR MGDE 5.

assoGiateEI Gom~letioR

+iFAe of GoRElitioR B Rot met:-

SURVEILLANCE REQUIREMENTS SR 3.5.3.1 SURVEILLANCE The following SRs are applicable for all equipment required to be OPERABLE:

SR 3.5.2.1 SR 3.5.2.7 SR 3.5.2.3 SR 3.5.2.8 SR 3.5.2.4 COMPLETION TIME Immediately 1 ho~:;~r 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> FREQUENCY In accordance with applicable SRs 3.5-6 DIABLO CANYON - UNITS 1 & 2 Unit 1 -Amendment No. ~,4-eS, Unit 2 -Amendment No. ~,-1-+G,

3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.4 Refueling Water Storage Tank (RWST)

LCO 3.5.4 The RWST shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4 ACTIONS CONDITION REQUIRED ACTION A.

RWST boron concentration A.1 Restore RWST to not within limits.

OPERABLE status.

OR RWST borated water temperature not within limits.

B.

RWST inoperable for B.1 Restore RWST to reasons other than OPERABLE status.

Condition A.

C.

Required Action and C.1 Be in MODE 3.

associated Completion AND Time not met.

C.2 Be in MODE §1.

SURVEILLANCE REQUIREMENTS SR 3.5.4.1 SR 3.5.4.2 SURVEILLANCE


NOTE----------------------------

Only required to be performed when ambient air temperature is< 35°F.

Verify RWST borated water temperature is

~ 35°F.

Verify RWST borated water volume is ~ 455,300 gallons.

RWST 3.5.4 COMPLETION TIME 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 1 hour 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />

~

Insert 1

~.12_hours FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program SR 3.5.4.3 Verify RWST boron concentration is ~ 2300 ppm and

_::: 2500 ppm.

In accordance with the Surveillance Frequency Control Program 3.5-7 DIABLO CANYON - UNITS 1 & 2 Unit 1 -Amendment No. ~, 99, 2-QQ, Unit 2 - Amendment No. ~, 200, ~,

3.6 CONTAINMENT SYSTEMS Containment Spray and Cooling Systems 3.6.6 3.6.6 Containment Spray and Cooling Systems LCO 3.6.6 The containment fan cooling unit (CFCU) system and two containment spray trains shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION A.

One containment spray A.1 train inoperable.

OR A.2 B.

Required Action and B.1 associated Completion AND Time of Condition A not met.

B.2 C.

One required CFCU system C.1 inoperable such that a minimum of two CFCUs remain OPERABLE.

DIABLO CANYON - UNITS 1 & 2 REQUIRED ACTION COMPLETION TIME

. Restore containment 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> spray train to OPERABLE status.


NOTE------------

For planned maintenance or inspections, the.

Completion Time is 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The Completion Times of Required Action A.2 are for unplanned corrective maintenance or inspections.

Restore containment 14 days spray train to OPERABLE status Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Insert 1

~

~

Be in MODE 5_1.

84 54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br /> Restore required CFCU 7 days system to OPERABLE status.

(continued) 3.6-13 Unit 1 -Amendment No. ~,2G2, 24-a, Unit 2 -Amendment No. ~,4-n,2W, 241,

ACTIONS (continued)

CONDITION D.

One required containment D.1 spray train inoperable and one required CFCU system inoperable such that a minimum of two CFCUs OR remain OPERABLE.

D.2 E.

Required Action and E.1 associated Completion Time of Condition CorD AND not met.

E.2 F. Two containment spray F.1 trains inoperable.

OR One containment spray train inoperable and two CFCU systems inoperable such that one or less CFCUs remain OPERABLE.

OR One or less CFCUs OPERABLE.

DIABLO CANYON - UNITS 1 & 2 Containment Spray and Cooling Systems 3.6.6 REQUIRED ACTION COMPLETION TIME Restore one required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> containment spray system to OPERABLE

status, Restore one CFCU 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> system to OPERABLE status such that four CFCUs or three CFCUs, each supplied by a different vital bus, are OPERABLE.

Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Insert 1 Be in MODE 6_1.

~__12. hours Enter* LCO 3.0.3.

Immediately 3.6-14 Unit 1 -Amendment No. 3§,

Unit 2 -Amendment No. 3§,~,

3.6 CONTAINMENT SYSTEMS 3.6. 7 Spray Additive System LCO 3.6.7 The Spray Additive System shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION A.

Spray Additive System A. 1 Restore Spray Additive inoperable.

System to OPERABLE status.

B.

Required Action and B.1 Be in MODE 3.

. associated Completion AND Time not met.

B.2 Be in MODE §_1.

  • SURVEILLANCE REQUIREMENTS SR 3.6.7.1 SR 3.6.7.2 SR 3.6.7.3 SR 3.6.7.4 SR 3.6.7.5 SURVEILLANCE Verify each spray additive manual, power operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position.

Verify spray additive tank solution volume is

~ 46.2°/o and ~ 91.9%.

Verify spray additive tank NaOH solution concentration is ~ 30%> and ~ 32%> by weight.

Verify each spray additive automatic valve in the flow path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

Verify spray additive flow from each solution's flow path.

Spray Additive System 3.6.7 COMPLETION TIME 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 6 hours Insert 1 M 54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br /> FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.6-16 Unit 1 -Amendment No. ~~ 200, Unit 2 - Amendment No. ~~ 2G4, t

3.7 PLANT SYSTEMS

3. 7. 7 Vital Component Cooling Water (CCW) System LCO 3. 7. 7 Two vital CCW loops shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION A.

One vital CCW loop A.-1


NOTE--------------

inoperable.

Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops-MODE 4,"

for residual heat removal loops made inoperable by CCW.

Restore vital CCW loop to OPERABLE status.

B.

Required Action and B.1 Be in MODE 3.

associated Completion Time of Condition A not AND

~

met.

B.2 Be in MODE §1.

SURVEILLANCE REQUIREMENTS SR 3.7.7.1 SURVEILLANCE


NOTE----------------------------

Isolation of CCW flow to individual components does not render the CCW System inoperable Verify each CCW manual, power operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.

CCW System 3.7.7 COMPLETION TIME 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 6 hours

~

Insert 1 de-ll._hours FREQUENCY In accordance with the Surveillance Frequency Control Program (continued)

DIABLO CANYON - UNITS 1 & 2 3.7-14 Unit 1 -Amendment No. ~, 2-GG, Unit 2 -Amendment No. ~, 2-Q.i,

3.7 PLANT SYSTEMS 3.7.8 Auxiliary Saltwater (ASW) System LCO 3.7.8 Two ASW trains shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION A.

One ASW train inoperable.

A.1


NOTE--------------

Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops - MODE 4,"

for residual heat removal loops made inoperable by ASW.

Restore ASW train to I

OPERABLE status B.

Required Action and B.1 Be in MODE 3.

associated Completion AND Time of Condition A not r

met.

B.2 Be in MODE §1.

SURVEILLANCE REQUIREMENTS SURVEILLANCE ASW 3.1.8 COMPLETION TIME 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 6 hours Insert 1 W--.1l._hours FREQUENCY SR 3.7.8.1 Verify each ASW manual and power operated, In accordance with the SR 3.7.8.2 SR 3.7.8.3 valve in the flow path servicing safety related Surveillance equipment, that is not locked, sealed, or otherwise Frequency Control secured in position, is in the correct position.

Program Verify each ASW power operated valve in the flow path that is not locked, sealed, or otherwise secured in position, can be moved to the correct position.

Verify each ASW pump starts automatically on an actual or simulated actuation signal.

In accordance with the lnservice Test Program.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON-UNITS 1 & 2 3.7-16 Unit 1 -Amendment No. ~' 2-00, Unit 2 - Amendment No. ~, ~,

3.7 PLANT SYSTEMS 3.7.9 Ultimate Heat Sink (UHS)

LCO 3.7.9 The UHS shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION A.

With the UHS temperature A.1 Place a second CCW

> 64°F.

heat exchanger in service.

B.

Required Action and 8.1 Be in MODE 3.

associated Completion Time of Condition A not AND met.

B.2 Be in MODE §1.

SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.9.1 Not used.

SR 3.7.9.2 Verify water temperature of UHS is within limits.

UHS 3.7.9 COMPLETION TIME 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 6 hours Insert 1

~.12_hours FREQUENCY 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if UHS temperature is s 60°F, AND 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> if UHS temperature > 60°F buts 62°F, AND 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> if UHS temperature > 62°F buts 64°F.

DIABLO CANYON - UNITS 1 & 2 3.7-17 Unit 1 -Amendment No. ~.

Unit 2 -Amendment No. ~.

ACTIONS (continued)

CONDITION C.

Required Action and associated Completion Time of Condition A or B not met in MODE 1, 2, 3, or

4.

D.

Required Action and associated Completion Time of Condition A not met in MODE 5 or 6, or during movement of recently irradiated fuel assemblies.

DIABLO CANYON - UNITS 1 & 2 REQUIRED ACTION C.1 Be in MODE 3.,

AND

  • ~

C.2 Be in MODE 61_.

D.1.1 Place OPERABLE CRVS train in pressurization mode.

AND D.1.2 Verify that the OPERABLE CRVS train is capable of being

  • powered by an OPERABLE emergency power source.

OR D.2 Suspend movement of recently irradiated fuel assemblies.

CRVS 3.7.10 COMPLETION TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Insert 1 Je-.12_hours Immediately Immediately Immediately (continued) 3.7-18a Unit 1 -Amendment No. ~,~,4-84, 24-3, Unit 2 -Amendment No. ~,-1-00,4-Se, ~'

Move SR 3.7.12.1 through 3.7.12.3 from this page to page 3. 7-22.

3.7 PLANT SYSTEMS 3.7.12 Auxiliary Building Ventilation System (ABVS)

LCO 3.7.12 Two ABVS trains shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION A.

The common HEPA filter A. 1 Restore the common and/or charcoal adsorber HEPA filter and charcoal inoperable.

adsorber to OPERABLE status.

B.

One ABVS train inoperable.

B.1 Restore ABVS train to OPERABLE status C.

Required Action and C.1 Be in MODE 3.

associated Completion AND Time not met.

C.2 Be in MODE §1.

SURVEILLANCE REQUIREMENTS SR 3.7.12.1 SURVEILLANCE This surveillance shall verify that each ABVS train is aligned to receive electrical power from a separate OPERABLE vital bus.

Operate each ABVS train for;::: 15 minutes.

ABVS 3.7.12 COMPLETION TIME 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 7 days 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> --

Insert 1

~Rhours FREQUENCY In accordance with the Surveillance Frequency Control Program SR 3.7.12.2 Perform required ABVS filter testing in In accordance with the SR 3.7.12.3 accordance with the Ventilation Filter Testing VFTP Program (VFTP).


N 0 T E --------------------------------

SR is not applicable to a specific ABVS train when that ABVS train is configured and performing its safety function.

Verify each ABVS train actuates on an actual or simulated actuation signal and the system realigns to exhaust through the common HEPA filter and charcoal adsorber.

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.7-21 (continued)

Unit 1 - Amendment No. ~,49J,~,

Unit 2 -Amendment No. ~,4-ee,W-1-,

+

Move SR 3.7.12.1 through 3.7.12.3 from page 3.7-21 to this page.

SURVEILLANCE REQUIREMENTS (continued)

SR 3.7.12.4 SR 3.7.12.5 SR 3.7.12.6 SURVEILLANCE Not Used.

Not Used.

Verifying that leakage through the ABVS Dampers M2A and M2B is less than or equal to 5 cfm when subjected to a Constant Pressure or Pressure Decay Leak Rate Test in accordance with ASME N510-1989. The test pressure for the leak rate test shall be based on a maximum operating pressure as defined in ASME N51 0-1989, of 8 inches water gauge.

FREQUENCY ABVS 3.7.12 In accordance with the Surveillance Frequency Control Program DIABLO CANYON-UNITS 1 & 2 3.7-22 Unit 1 -Amendment No. ~~ 2-00, Unit 2 - Amendment No. ~~ ~~

ACTIONS (continued)

CONDITION C.

Two required offsite circuits C. 1 inoperable.

AND C.2 D.

One required offsite circuit D.1 inoperable.

AND OR One DG inoperable.

D.2 E.

Two or more DGs E.1 inoperable.

F.

One supply train of the F.1 DFO transfer system inoperable.

G. Two supply trains of the G.1 DFO transfer system inoperable.

H.

Required Action and H.1 associated Completion AND Time of Condition A, B, C, D, E, F or G not met.

H.2 I.

Two or more DGs 1.1 inoperable.

AND One or more required offsite circuits inoperable.

J.

One or more DGs J.1 inoperable.

AND Two required offsite circuits inoperable.

DIABLO CANYON - UNITS 1 & 2 REQUIRED ACTION Declare required feature(s) inoperable when its redundant required feature(s) is inoperable.

Restore one required offsite circuit to OPERABLE status.

Restore required offsite circuit to OPERABLE status.

Restore DG to OPERABLE status.

Ensure at least two DGs are OPERABLE.

Restore the DFO transfer system to OPERABLE status.

Restore one train of the DFO transfer system to OPERABLE status.

Be in MODE 3.

Be in MODE §1.

Enter LCO 3.0.3.

Enter LCO 3.0.3.

AC Sources - Operating 3.8.1 COMPLETION TIME 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from discovery of Condition C concurrent with inoperability of redundant required features.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 12 hours 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 2 hours 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 1 hour 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Insert 1

~

~1l_hours Immediately Immediately 3.8-3 Unit 1 -Amendment No. ~,

Unit 2 - Amendment No. ~,

ACTIONS (continued)

CONDITION B.

One battery inoperable.

C.

One DC electrical power subsystem inoperable for reasons other than Condition A or B.

D.

More than one full capacity charger receiving power simultaneously from a single 480 V vital bus.

E.

Required Action and Associated Completion Time not met.

DIABLO CANYON - UNITS 1 & 2 Move Condition E from this page to page 3.8-19.

REQUIRED ACTION B.1 Restore battery to OPERABLE status.

OR B.2.1.1


NOTE------------

Required Actions B.2.1.1, B.2.1.2, and B.2.2 are applicable, on a one time basis, for Unit 1 cycle 14.

Determine OPERABLE batteries are not inoperable due to common cause failure.

OR B.2.1.2 Perform SR 3.8.4.1 and SR 3.8.6.1 for OPERABLE batteries.

AND B.2.2 Restore battery to OPERABLE status.

C.1 Restore DC electrical power subsystem to OPERABLE status.

D.1 Restore the DC electrical power subsystem to a configuration wherein each charger is powered from its associated 480 volt vital bus.

E.1 Be in MODE 3.

AND E.2 Be in MODE~.

DC Sources - Operating 3.8.4 COMPLETION TIME 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 2 hours 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 4 hours 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 14 days 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Insert 1 00--Rhours 3.8-18a Unit 1 -Amendment No. ~,4-72:,4-90, Unit 2 -Amendment No. ~,-1-74,

Move Condition E from page 3.8-18a to this page.

DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS SR 3.8.4.1 SR 3.8.4.2 SR 3.8.4.3 SURVEILLANCE Verify battery terminal voltage is greater than or equal to the minimum established float voltage.

Verify each battery charger supplies ~ 400 amps at greater than or equal to the minimum established float voltage for ~ 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Verify each battery charger can recharge the battery

  • to the fully charged state within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> while supplying the largest combined demands of the various continuous steady state loads, after a battery discharge to the bounding design basis event discharge state.

NOTES-----------------------------

1.

The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.

2.

This Surveillance shall not be performed in MODE 1, 2, 3, or 4.

Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program,

In accordance with the Surveillance Frequency Control Program DIABLO CANYON - UNITS 1 & 2 3.8-19 Unit 1 -Amendment No. ~,4--72,200, Unit 2 -Amendment No. ~,4-74,2G4-,

t

+