Supplemental Information Regarding Response to NRC Bulletin 2002-02. Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs.
ML041250380
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/23/2004
From: Oatley D
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BL-02-002, DCL-04-052
Download: ML041250380 (3)


Text

E Pacific Gas and

.19 ElectrcCompany David H.Datley Diablo Canyon Power Plant Vice President and PO. Box 56 General Manager Avila Beach, CA 93424 805.545.4350 April 23, 2004 Fax: 805.545A234 PG&E Letter DCL-04-052 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Supplemental Information Regarding Response to NRC Bulletin 2002-02. "Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs"

Dear Commissioners and Staff:

In PG&E Letter DCL-02-109, "30-Day Response to NRC Bulletins 2002-02, 'Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs,"'

PG&E stated that details would be provided to the NRC six months prior to Unit 2 refueling outage twelve (2R12) on the reactor head volumetric inspection scheduled for 2R1 2, including inspection scope, methods, qualification, and acceptance criteria.

Since responding to NRC Bulletin 2002-02, the NRC has issued Order EA-03-009, which has subsequently been superseded by the First Revised Order EA-03-009.

The First Revised Order provides details for acceptable scope and methods for nonvisual nondestructive examinations (NDE) of reactor pressure vessel head penetrations in Section IV.C.(5).(b.).((i), (ii), and (iii)). PG&E consented to the First Revised Order in PG&E Letter DCL-04-021, "Twenty-Day Response to First Revision of NRC Order Modifying Licenses (EA-03-009)." Therefore, the scope and methods for the nonvisual NDE of reactor pressure vessel head penetrations to be performed in 2R12 will be consistent with the scope and methods described in the First Revised Order.

The qualification requirements and acceptance criteria of the volumetric examinations will be consistent with industry practices developed from EPRI research on volumetric inspection of the reactor pressure vessel head penetrations.

The vendor contracted for these examinations has demonstrated detection and sizing capabilities on the Materials Reliability Program blind sample test set.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Catlaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Document Control Desk PG&E Letter DCL-04-052 April 23, 2004 Page 2 If you have questions regarding this response, please contact Mr. Stan Ketelsen at (805) 545-4720.

Sincerely, David H. Oatley Vice President and General Manager - Diablo Canyon mjr/4557 cc: Edgar Bailey, DHS Bruce S. Mallett David L. ProuIx Girija S. Shukla Diablo Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

PG&E Letter DCL-04-052 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

) Docket No. 50-275 In the Matter of ) Facility Operating License PACIFIC GAS AND ELECTRIC COMPANY) No. DPR-80

)

Diablo Canyon Power Plant ) Docket No. 50-323 Units 1 and 2 ) Facility Operating License

) No. DPR-82 AFFIDAVIT David H. Oatley, being of lawful age, first being duly sworn upon oath says that he is Vice President and General Manager - Diablo Canyon of Pacific Gas and Electric Company; that he has executed this supplemental response to NRC Bulletin 2002-02 on behalf of said company with full power and authority to do so; that he is familiar with the content thereof; and that the facts stated therein are true and correct to the best of his knowledge, information, and belief.

David H. Oatley Vice President and General Manager - Diablo Canyon Subscribed and sworn to before me this 23rd day of April 2004.

____ ____ ___ AN DR EATHERLY Notary Pdb4c - California Notary Public > I Commkb~Jn# 1425568 County of San Luis Obispo SanLuesObispoqounty State of California IMy Comm. Expis Jii 1. 2007i

Text

E Pacific Gas and

.19 ElectrcCompany David H.Datley Diablo Canyon Power Plant Vice President and PO. Box 56 General Manager Avila Beach, CA 93424 805.545.4350 April 23, 2004 Fax: 805.545A234 PG&E Letter DCL-04-052 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Supplemental Information Regarding Response to NRC Bulletin 2002-02. "Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs"

Dear Commissioners and Staff:

In PG&E Letter DCL-02-109, "30-Day Response to NRC Bulletins 2002-02, 'Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs,"'

PG&E stated that details would be provided to the NRC six months prior to Unit 2 refueling outage twelve (2R12) on the reactor head volumetric inspection scheduled for 2R1 2, including inspection scope, methods, qualification, and acceptance criteria.

Since responding to NRC Bulletin 2002-02, the NRC has issued Order EA-03-009, which has subsequently been superseded by the First Revised Order EA-03-009.

The First Revised Order provides details for acceptable scope and methods for nonvisual nondestructive examinations (NDE) of reactor pressure vessel head penetrations in Section IV.C.(5).(b.).((i), (ii), and (iii)). PG&E consented to the First Revised Order in PG&E Letter DCL-04-021, "Twenty-Day Response to First Revision of NRC Order Modifying Licenses (EA-03-009)." Therefore, the scope and methods for the nonvisual NDE of reactor pressure vessel head penetrations to be performed in 2R12 will be consistent with the scope and methods described in the First Revised Order.

The qualification requirements and acceptance criteria of the volumetric examinations will be consistent with industry practices developed from EPRI research on volumetric inspection of the reactor pressure vessel head penetrations.

The vendor contracted for these examinations has demonstrated detection and sizing capabilities on the Materials Reliability Program blind sample test set.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Catlaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Document Control Desk PG&E Letter DCL-04-052 April 23, 2004 Page 2 If you have questions regarding this response, please contact Mr. Stan Ketelsen at (805) 545-4720.

Sincerely, David H. Oatley Vice President and General Manager - Diablo Canyon mjr/4557 cc: Edgar Bailey, DHS Bruce S. Mallett David L. ProuIx Girija S. Shukla Diablo Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

PG&E Letter DCL-04-052 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

) Docket No. 50-275 In the Matter of ) Facility Operating License PACIFIC GAS AND ELECTRIC COMPANY) No. DPR-80

)

Diablo Canyon Power Plant ) Docket No. 50-323 Units 1 and 2 ) Facility Operating License

) No. DPR-82 AFFIDAVIT David H. Oatley, being of lawful age, first being duly sworn upon oath says that he is Vice President and General Manager - Diablo Canyon of Pacific Gas and Electric Company; that he has executed this supplemental response to NRC Bulletin 2002-02 on behalf of said company with full power and authority to do so; that he is familiar with the content thereof; and that the facts stated therein are true and correct to the best of his knowledge, information, and belief.

David H. Oatley Vice President and General Manager - Diablo Canyon Subscribed and sworn to before me this 23rd day of April 2004.

____ ____ ___ AN DR EATHERLY Notary Pdb4c - California Notary Public > I Commkb~Jn# 1425568 County of San Luis Obispo SanLuesObispoqounty State of California IMy Comm. Expis Jii 1. 2007i