DCL-02-107, Report of Full Compliance with NRC Order for Interim Safeguards & Security Compensatory Measures

From kanterella
Jump to navigation Jump to search
Report of Full Compliance with NRC Order for Interim Safeguards & Security Compensatory Measures
ML022480033
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/30/2002
From: Oatley D
Pacific Gas & Electric Co
To: Collins S
Office of Nuclear Reactor Regulation
References
50-275-OL, 50-323-OL, DCL-02-107
Download: ML022480033 (3)


Text

F Pacific ElectricGas and Company

- David H. 0atley Diablo Canyon Power Plant Vice President P0 Box 56 Diablo Canyon Operations Avila Beach, CA 93424 8055454350 August 30, 2002 Fax 8055454234 PG&E Letter DCL-02-107 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 ATTN: Mr. Samuel J. Collins Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North, Room 5 D2, Mail Stop 0-5 E7 11555 Rockville Pike Rockville, MD 20852-2738 Diablo Canyon Units I and 2 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Report of Full Compliance with NRC Order for Interim Safeguards and Security Compensatory Measures

Dear Mr. Collins:

The purpose of this letter is to notify the NRC that Pacific Gas and Electric Company (PG&E) has completed all actions to comply with the NRC Security Order dated February 25, 2002, for Diablo Canyon Power Plant, Units 1 and 2.

These actions are identified in PG&E letters DCL-02-028, DCL-02-029, both dated March 18, 2002, DCL-02-055 dated May 1, 2002, and DCL-02-066 dated May 31, 2002. The enclosures to these letters describe how PG&E interpreted and either complied, or planned to comply with each interim compensatory measure (ICM) specified in attachment 2 of the Order. The enclosure to this letter revises PG&E's description of compliance with ICM B.2.a(2) and B.2.b. These changes are necessary due to a delay in receipt of material, and changes in Nuclear Energy Institute (NEI) guidance. Revision bars are used to indicate the changes.

This response is submitted to the Commission in accordance with 10 CFR 50.4.

SAFEGUARDS INFORMATION The enclosure contains Safeguards Information Upon separation of the enclosure, this letter is decontrolled I"

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Caltaway 9 Comanche Peak

  • Diablo Canyon
  • Palo Verde 9 South Texas Project 9 Wolf Creek

PG&E Letter DCL-02-107 F-Mr. Samuel J. Collins August 30, 2002 Page 2 If you have any questions regarding this matter, please contact me at (805) 545-4350, or Ron Todaro at (805) 545-4309.

Sincerely, David H. Oatley Vice President, Diablo Canyon Operations Imp/A0550265 E2 Enclosure cclenc: Robert E. Martin, NRC Ellis W. Merschoff, NRC Region IV Glenn M. Tracy, NRC cc: David L. Proulx, NRC Resident Girija S. Shukla, NRC Project Manager Diablo Distribution SAFEGUARDS INFORMATION The enclosure contains Safeguards Information Upon separation of the enclosure, this letter is decontrolled

PG&E Letter DCL-02-107 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

) Docket No. 50-275 In the Matter of ) Facility Operating License PACIFIC GAS AND ELECTRIC COMPANY ) No. DPR-80

)

Diablo Canyon Power Plant ) Docket No. 50-323 Units 1 and 2 ) Facility Operating License

_) No. DPR-82 AFFIDAVIT David H. Oatley, of lawful age, first being duly sworn upon oath says that he is Vice President, Diablo Canyon Operations of Pacific Gas and Electric Company; that he has executed the report of compliance with the NRC Security Order dated February 25, 2002, on behalf of said company with full power and authority to do so; that he is familiar with the content thereof, and that the facts stated therein are true and correct to the best of his knowledge, information, and belief.

David H. Oatley Vice President, Diablo Canyon Operations Subscribed and sworn to before me this 30th day of August, 2002.

&* CHUCK MACKEY Notary Public* *lNotcy PuC - CORl 1 County of San Luis O o z S, LUIS Ousr couody State of California a cormBm:*-*r SAFEGUARDS INFORMATION The enclosure contains Safeguards Information Upon separation of the enclosure, this letter is decontrolled