DCL-02-055, Clarification of the Twenty-Day Answer to NRC Order for Interim Safeguards and Security Compensatory Measures
| ML021340095 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 05/01/2002 |
| From: | Womack L Pacific Gas & Electric Co |
| To: | Martin R Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| DCL-02-055 | |
| Download: ML021340095 (3) | |
Text
Pacific Gas and Electric Company Lawrence F. Womack Diablo Canyon Power Plant Vice President P0. Box 56 Nuclear Services Avila Beach, CA 93424 805.545.4600 May 1, 2002 Fax: 805.545.4234 PG&E Letter DCL-02-055 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 ATTN: Mr. Robert E. Martin U.S. Nuclear Regulatory Commission One White Flint North, Room 8 D12, Mail Stop 0-8 G9 11555 Rockville Pike Rockville, MD 20852-2738 Diablo Canyon Units 1 and 2 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Clarification of the Twenty-Day Answer to NRC Order for Interim Safeguards and Security Compensatory Measures
Dear Mr. Martin:
This letter clarifies two answers provided in PG&E Letter DCL-02-028, dated March 18, 2002, "Twenty-Day Answer to NRC Order for Interim Safeguards and Security Compensatory Measures." This clarification is in response to conference calls with the staff in which PG&E committed to submit clarification to the answers provided for interim compensatory measures (ICM) B.3.d and B.4.e. The enclosed clarifications to these two answers supersede the two answers provided in DCL-02-028.
Lawrence F. Womack Vice President, Nuclear Services SAFEGUARDS INFORMATION NOTICE:
The Enclosure contains."Safeguards Information."
Upon separation of the Enclosure, this letter is "Decontrolled."
A member of the STARS (Strategic Teaming and Resource Sharing) Attiance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project & Wotf Creek
PG&E Letter DCL-02-055 Document Control Desk May 1, 2002 Page 2 LMP/A0550265 E26 Enclosures Ellis W. Merschoff Glenn M. Tracy Samuel J. Collins David L. Proulx Girija S. Shukla Diablo Distribution SAFEGUARDS INFORMATION NOTICE:
The Enclosure contains "Safeguards Information."
Upon separation of the Enclosure, this letter is "Decontrolled."
cc/enc:
cc:
PG&E Letter DCL-02-055 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of PACIFIC GAS AND ELECTRIC COMPANY Diablo Canyon Power Plant Units 1 and 2
) )
)
)
Docket No. 50-275 Facility Operating License No. DPR-80
)
Docket No. 50-323
)
Facility Operating License No. DPR-82 AFFIDAVIT Lawrence F. Womack, of lawful age, first being duly sworn upon oath says that he is Vice President, Nuclear Services of Pacific Gas and Electric Company; that he has executed the clarification of PG&E's twenty-day answer (DCL-02-028, dated March 18, 2002) to the NRC Security Order dated February 25, 2002, on behalf of said company with full power and authority to do so; that he is familiar with the content thereof; and that the facts stated therein are true and correct to the best of his knowledge, information, and belief.
Lawrence F. Womack Vice President, Nuclear Services Subscribed and sworn to before me this 1st day of May, 2002 Notary Public County of San Luis Obispo SA---
RAL-RECTOR State of California
¶ Z......,4 A,
Notary Public - California z San Lu*s Obi,." County My Comm. Expirs Jan 12,2006 SAFEGUARDS INFORMATION NOTICE:
The Enclosure contains "Safeguards Information."
Upon separation of the Enclosure, this letter is "Decontrolled."