CPSES-200601944, Operator Licensing Examination Data

From kanterella
Jump to navigation Jump to search
Operator Licensing Examination Data
ML062780227
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/28/2006
From: Madden F
TXU Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CPSES-200601944, RIS-06-015, TXX-06166
Download: ML062780227 (3)


Text

LTXU TXU Power Mike Blevins Ref. 10 CFR 55.40 Comanche Peak Steam Senior Vice President Electric Station & Chief Nuclear Officer P.O. Box 1002 (EO1)

Glen Rose, TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins@txu.com CPSES-200601944 Log # TXX-06166 September 28, 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 OPERATOR LICENSING EXAMINATION DATA REF: NRC Regulatory Information Summary 2006-15, "Preparation and Scheduling of Operator Licensing Examinations" Gentlemen:

In response to the referenced letter, enclosed please find a completed NRC Form 536, "Operator Licensing Examination Data," which estimates the number of TXU Generation Company LP (TXU Power) candidates for examination during CYs 2007 through 2010.

If you have any questions concerning these estimates, please call Mr. Steven K.

Sewell at (254) 897-6113.

This communication contains no new licensing basis commitments regarding CPSES Units I and 2.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway e Comanche Peak

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

TXX-06166 Page 2 of 2 Sincerely, TXU Generation Company LP By: TXU Generation Management Company LLC, Its General Partner Mike Blevins By: V V 2' L

/Fred W. Madden Director, Oversight and Regulatory Affairs RAS

Enclosure:

NRC Form 536 c- B. S. Mallett, Region IV clo A. T. Gody, Region IV clo M. C. Thadani, NRR clo Resident Inspectors, CPSES clo

Enclosure to TXX-06166 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB NO 3150-0131 EXPIRES 08/3112008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the OPERATO R IC ENSING Records and FOIA/Privacy Services Branch (T-5 F53) U S Nuclear Regulatory Commission, Washington, DC 20555-0001 or by intemet email to EXAMINATION DATA infocollects@nrc.gov, and to the Desk Officer, Office of Information and RegulatoryAffairs, NEOB-1 0202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Comanche Peak Steam Electric Station IV P. O. Box 1002 Glen Rose, Texas 76043 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 NUMBER OF REACTOR 5 0 5 0 OPERATORS NUMBER OF SENIOR REACTOR 3 0 3 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE April, 2007 N/A April, 2009 N/A ALTERNATE DATE May, 2007 N/A April, 2009 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE NRC FORM 536 (85-2005) PRINTED ON RECYCLED PAPER ,