3F0995-07, Forwards Crystal River Unit 3 Plant Ref Simulator Four Yr Simulator Certification Rept

From kanterella
Jump to navigation Jump to search
Forwards Crystal River Unit 3 Plant Ref Simulator Four Yr Simulator Certification Rept
ML20098A453
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/19/1995
From: Boldt G
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20098A455 List:
References
3F0995-07, 3F995-7, NUDOCS 9509260011
Download: ML20098A453 (1)


Text

.  :  !

t Florida.

Power COFIPORATION O Un?$$

September 19,.1995 3F0995-07 U. S. Nuclear Regulatory Commission t

-Attention: Document Control Desk Washington, D.C. 20555

Subject:

Four Year Simulator Certification Report -

Crystal River unit 3

Dear Sir:

Pursuant to 10 CFR 55.45(b)(5)(ii) and 10 CFR 55.45(b)(5)(vi), attached please find the Four Year Simulator Certification Report for Crystal River Unit 3. This report contains a list of the performance testing completed during the past four years, a schedule for conduct of the performance testing for the next four years and a list of uncorrected performance test failures with a schedule for their correction. ,

Please contact John A. Lind at (904) 563-4675 if you have any questions concerning this letter.

Sincerely, G. L oldt 1 Vice President Nuclear Production PVF:ff Attachments xc: Regional Administrator, Region 11 NRR Project Manager Senior Resident Inspector ECCC04 CHYSTAL FWER ENERGY COMPLEX: 15780 W Power uno St Crystal River. Fkwide 344254708 e (904) 7954486 g

L1 l A norma Progene company \ \

,9509260011 950919 PDR ADDCK 05000302 P PDR __